![Page 1: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/1.jpg)
ControlOfEnvironmentalParamtersthrough
ProcessOptimization
![Page 2: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/2.jpg)
Steag Energy Services
Subsidiaries
LocalOffices
Headquater
STEAGPowitecGmbHEssen,Germany
STEAGEnergyServicesSchweizGmbHZurich,Switzerland
STEAGEnergyServicesGmbHEssen,Germany
OPUSPersonaldienstleistungenGmbHEssen,Germany
Constanta,RomaniaSTEAGEnsidaEnergyServicesLtd.Ankara,Turkey
STEAGEnergyServices(India)Pvt.Ltd.
STEAGEnergyServicesSolarSevilla,Spain
STEAGEnergyServicesBotswana(PTY)Ltd.Gaborone,Botswana
STEAGEnergyServicesiiGJohannesburg,SouthAfrica
STEAGEnergyServicesLLC,KingsMountain,USA
STEAGEnergyServicesdoBrasilLtda.RiodeJaneiro,Brazil
SantiagodeChile
STEAGEnergyServicesBangladesh
HeadQuartersisinEssen,Germany
![Page 3: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/3.jpg)
Uniqueness
ENGINEERING GERMAN
100,000 MW across all
technologies
PROCESS OPTIMIZATION
>700 IT systems delivered
IT-BASED
O&M PRACTICES >6,500 MW
full sope O&M for third parties
O&M management support for
further 3,500 MW
Triad
![Page 4: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/4.jpg)
STEAGEnergyServicesIndiaoperations
Corporate Office: A-29, Sector-16 Noida –
201 301, Uttar Pradesh, India O&M Site at Bhatinda
Western Regional Office at Ahmadabad
O&M Site at Hazira
O&M Site at Visakhapatnam
Corporate Office
Regional Offices
O&M Site
O&M Site at Pegadapalli
O&M Site at Kashipur
O&M Site at Palatana, Tripura
O&M Site at Lanjigarh
O&M Site at Talwandi Sabu
![Page 5: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/5.jpg)
O&MServices
Plant SIZE(MW) Location Owner ContractFrom To Fuel Scope
HINDUJA 2X525 VISAKHAPAT HNPCL/SES 2012 OngoingCoal
Comprehensive
O&M
SINAGRENI 2X600 TELANGANA SINGARENI 2016 Ongoing CoalComprehensive
O&M
TSPL 3X660 PUNJAB VEDANTA 2017 Ongoing CoalComprehensive
O&M
STERLITE 4X600 JHARSGUDA VEDANTA 2010 2015 CoalComprehensive
O&M
HMEL 165 PUNJAB HPCL-MittalEnergyLimited 2010 Ongoing Gas
ComprehensiveO&M
GSEG 530 SURAT GSEG 2001 Ongoing GasComprehensive
O&M
HALDIA 165 W.BENGAL HaldiaPetrochemicals 2006 2014 Refiner
residue.Comprehensive
O&M
LANJIGARH 3x30 ORISSA Vedanta 2017 ongoing Coalbased FieldO&M
BARAUNI7X110+2X250 BARAUNI NTPC 2018 Ongoing Coal
Controlroomsupport
GAMA 2X108 UTTARKAND RLGGroups 2015 Ongoing GasComprehensive
O&M
OTPCL 2X365 TRIPURA ONGC&TRIPURA. 2016 Ongoing GasComprehensive
O&M
![Page 6: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/6.jpg)
SystemtechnologiesServices
Sl No Product Description 1 PADO Performance Analysis Diagnostic and
Optimization (over 120 units supplied)
2 Ebsilon Energy and Mass flow balances ofthermodynamic process(over 74 units supplied)
3 OTS Operator Training Simulator(over 22 Simulators) supplied for various configuration of Coal, Gas and Solar systems)
4 CO Combustion Optimization5 SI/ PAM Computerized Maintenance
Management System (CMMS)
6 iRENYSIS Management Dashboard (MIS)7 PowerFactory Distribution and Transmission Simulator8 Fleet Monitoring Fleet wide monitoring of performance
and fault prediction
9 MOR Merit Order Rating10 Perf Performance Calculation
![Page 7: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/7.jpg)
Control of Environmental Parameters through Process Optimisation
![Page 8: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/8.jpg)
NOx Controls
Controls Expected NOX reduction
Cost intensive Low Nox burners 40-60% Overfired air 30-50% Reburn/Gas recirculation
40-50%
Water Steam injection 20-25% Trims
Cheaper options Burner out of Service 10-15% Fuel biasing 10-20% Low Excess air 5-15%
Combustion Controls
Lower Flame temperature
Create Fuel Rich condition
Lower residence time of oxidation condition
Post Combustion
Converting Nox to Nitrogen gas
Introducing reagents nto flue gas
Ref:Ron D. Bell, P.E., MPR Associates, Inc.
![Page 9: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/9.jpg)
Load fluctuation-Impact on Environmet
0
5
10
15
20
25
30
35
LoadRevisions
LoadRevisionsApril'19 May June'190
5
10
15
20
25
30
April'19 May'19 June'19 July'19 Aug'19 Sep'19
Revisions/day
0
100
200
300
400
500
600
700
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43
LoadVsNOx
Load NOx
![Page 10: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/10.jpg)
Variation of Nox with load at sub critical units
0
100
200
300
400
500
600
1 3 5 7 91113151719212325272931333537394143454749515355575961
LOAD
0
50
100
150
200
250
300
1 3 5 7 91113151719212325272931333537394143454749515355575961
NOx
0
100
200
300
400
500
600
1 3 5 7 91113151719212325272931333537394143454749515355575961
LOAD
0
50
100
150
200
250
300
1 3 5 7 91113151719212325272931333537394143454749515355575961
NOx
0
100
200
300
400
500
600
700
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Load
Load
270
275
280
285
290
295
300
305
310
315
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOx
![Page 11: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/11.jpg)
Process Optimisation
![Page 12: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/12.jpg)
Digitalizeddiagnosticsandefficiencyenhancement
![Page 13: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/13.jpg)
Process Optimzation
Parameter Set point sets those critical parameters which the operator can pre-set, and obtain the Optimal values which the operator can try to achieve through suitable actions for optimizing efficiency.
Process inputs Coal Quality PA flow SA flow Burner tilts Furnace O2 Over Fire Air Damper positions Process Out put Optimised Efficiency & NOx
![Page 14: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/14.jpg)
Variation of Nox with Furnace Oxygen
![Page 15: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/15.jpg)
OFA damper regulation
MPR Associates, Inc. - 6 - Revision 0 NOX Reduction Overview
AIR PREHEATER
FORCED DRAFT FAN
STACK
ADD OFA PORTS AND DUCTING
FROM EXISTING WINDBOX
WIND BOX
OXIDIZING BURNOUT
ZONE
FUEL RICH ZONE
than 10 ppmv in certain gas-fired applications. Ultra-low NOX burners generally premix significant amounts of fuel and air, prior to injection into the furnace combustion zone. Extreme care must be exercised when operating ultra low NOX burners to avoid hazardous operating conditions and the tolerance on operating limits to achieve the design NOX emissions are very tight. Cost and performance data for ultra-low NOX burners are not presented herein. Over Fire Air (OFA) In this technique a controlled portion of the total combustion-air flow, typically 10-20%, is directed through over-fire ports located above the highest elevation of burners in the furnace. The removal of the air flow from the burners results in a fuel rich primary combustion zone to limit the NOX formation. The combustion of the CO produced in the primary combustion zone is completed using the air supplied by the over-fire air ports. In most cases, new furnace penetrations are required to implement an over-fire air system in an existing furnace. Two types of over-fire air systems can be used to accomplish NOX emission reductions; close-coupled over-fire air (COFA) and separated over-fire air (SOFA) systems. COFA systems are typically implemented by adding air injectors immediately above the existing furnace burners. Overfire air is supplied from the top of the existing windbox. As shown in Figure 2, the over-fire air ports are located immediately above the primary combustion zone. This approach minimizes the changes required to implement the over-fire-air system. However, the approach limits the time available to complete initial combustion prior to the introduction of the OFA and will result in NOX reductions of 30 to 50%.
Figure 2. Close-coupled Over-fire Air System (COFA) Higher NOX reductions will be achieved by increasing the separation of the over-fire air ports from the primary combustion zone and increasing the air velocity through the ports. This technique, known as SOFA, is illustrated in Figure 3. NOX reductions of 40 to 60 % may be
![Page 16: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/16.jpg)
Parameter trending and training
Burner tilt variation PA/SA ratio variation
![Page 17: Control Of Environmental Paramters through Process ......Limited 2010 Ongoing Gas Comprehensive O&M GSEG 530 SURAT GSEG 2001 Ongoing Gas Comprehensive O&M HALDIA 165 W.BENGAL Haldia](https://reader033.vdocument.in/reader033/viewer/2022060604/6058ad243f9460570d3d1f15/html5/thumbnails/17.jpg)
Variation of Boiler efficiency with NOx