STANDARD COST CODES
Jeddah, Kingdom of Saudi Arabia
-
7/29/2019 Cost Codes
2/37
-
7/29/2019 Cost Codes
3/37
COST CODE LEVEL/STRUCTURE DETERMINATION
Jeddah, Kingdom of Saudi Arabia
-
7/29/2019 Cost Codes
4/37
-
7/29/2019 Cost Codes
5/37
COST CODE DETERMINATIONS:
DIVISION:
Division
SUB DIVISION:
Sub Division
4 - COST ALLOCATIONS:
Labor
Material
Equipment
Subcon
SAMPLE COST CODES:
02 Site Works
05 Subsurface Investigations & Demolition
1 Labor
TO BE READ AS:
02.05.1 (Site Works/Subsurface Investigation & Demolition/Labor)
COST CODE LEVEL/STRUCTURE
1
2
3
4
RPS/CP Dept. Page 1
-
7/29/2019 Cost Codes
6/37
DETAIL COST CODE ELEMENTS
Jeddah, Kingdom of Saudi Arabia
-
7/29/2019 Cost Codes
7/37
-
7/29/2019 Cost Codes
8/37
Division Sub Division Description
01 General Requirements
Basic Salary & Overtime for Indirect Personnel:
01 Basic Salary & Overtime for Indirect Personnel
Expenses for Indirect Personnel:
02 Food Allowance for Indirect Personnel
03 Housing allowance for Indirect Personnel
04 Transportation allowance for Indirect Personnel
05 Living Allowance for Indirect Personnel
06 Air Ticket Allowance for Indirect Personnel
07 Other Allowance for Indirect Personnel-(Social Insurance)
08 Severance/End Service Pay09 Medical Insurance for Indirect Personnel
10 Other Incentive/Bonuses for Indirect Personnel
11 Other Indirect Expenses
Administrative Personnel Expenses:
12 Social Insurance
13 Leave Pay
14 Leave Passage
15 Severance Pay
16 Medical Expenses
17 Insurance Expenses
18 Visa Expenses
19 Catering & Accomodation
20 Transportation Vehicle for Staff
21 Joining/Leaving Travel Expenses
22 Training Expenses
23 Miscellaneous Expenses
RPS/CP Dept. Page 8 of 32
-
7/29/2019 Cost Codes
9/37
Division Sub Division Description
01 Site Office Running Expenses:
24 Consumables incl. Medicine
25 Water
26 Electricity
27 Stationary
28 Telephone, Mail & Telefaxes
29 Performance Bonds
30 Insurance
31 Business Travel & Accommodation
32 Consultant and Professional Fees
33 Entertainment34 Misc. Office Requirement
35 Office Furniture & Equipment
36 Blue Printing Materials
37 Food & Beverage
38 Computer, Printers, Network
Client Running Expenses:
39 Telephone Client Expense
40 Copy Machine and Stationary Client Expense
41 Food & Beverage Client Expenses
42 Others Client Expense
Geotechnical Studies:
43 Testing Services
Temporary Facilities & Utilities (Mobilization):
44 Temporary Facilities & Utilities
Overheads
45 Jeddah Area Office
Financial Expenses:
46 Contingencies & Escalations
47 Other Financial Expenses
Design & Engineering:
48 Design & Engineering icl. As-built drawing
RPS/CP Dept. Page 9 of 32
-
7/29/2019 Cost Codes
10/37
Division Sub Division Description
01 Construction Equipments, Spareparts, Petrol, Oil & Lubricants:
Misc. Equipment:
49 Internal Rental
50 External/Outside Rental
Equipment, Tools & Spareparts:
51 Equipment, Tools & Spareparts
Petrol, Oil & Lubricants:
52 Petrol, Oil & Lubricants
Transportation cost of Material:
53 Transportation cost of Material
Scaffolding Rental:54 Scaffolding Rental -Internal
55 Scaffolding Rental -External
56 Shuttering
Direct Construction Expenses:
57 Submittals (Drawings, Reports, Etc.)
58 Quality Control
59 Utilities Connection
60 Sanitation Services
61 Cosumable Material, Tools, Equipment & Safety
62 Contract Closeout
02 Site Works
05 Subsurface Investigations & Demolition
10 Site Preparation
15 Earthworks
20 Tunneling, Piles & Caissons
25 Railroad & Marine Works
30 Paving & Surfacing
35 Pipe Utilities
40 Sewerage & Drainage
45 Site Improvements
50 Landscaping
RPS/CP Dept. Page 10 of 32
-
7/29/2019 Cost Codes
11/37
Division Sub Division Description
03 Concrete Works
05 Concrete Formworks
10 Concrete Reinforcement
15 Cast-In-Place Concrete
20 Precast Concrete
25 Cementitious Decks
04 Masonry Works
05 Mortar & Masonry Accessories
10 Unit Masonry
15 Stone
20 Masonry Restoration & Cleaning/Refractories05 Metal Works
05 Finishes & Fastening
10 Structural Metal Framing
15 Metal Joist
20 Metal Decking
25 Metal Fabrications
30 Expansion Joints
06 Wood & Plastic
05 Fastener & Adhesive
10 Rough Carpentry
15 Finish Carpentry
20 Wood Treatment
25 Architectural Woodwork
07 Thermal & Moisture Protection
05 Waterproofing & Damproofing
10 Insulation
15 Shingles & Roofing Tiles
20 Preformed Roofing & Sidings
25 Membrane Roofing
30 Flashing & Sheet Metal
35 Roof Specialties & Accessories
40 SkylightsRPS/CP Dept. Page 11 of 32
-
7/29/2019 Cost Codes
12/37
Division Sub Division Description
45 Joint Sealers
RPS/CP Dept. Page 12 of 32
-
7/29/2019 Cost Codes
13/37
Division Sub Division Description
08 Doors & Windows
05 Metal Doors & Frames
10 Wood & Plastic Doors
15 Special Doors
20 Entrances & Storefronts
25 Metal Windows
30 Wood & Plastic Windows
35 Hardware
40 Glazing
45 Glazed Curtain Wall
09 Finishes05 Metal Support Systems
10 Lath, Plaster & Gypsum Board
15 Tile
20 Terrazzo
25 Acoustical Treatment & Wood Flooring
30 Flooring & Carpet
35 Special Flooring & Floor Treatment
40 Special Coatings
45 Painting & Wall Coverings
10 Specialties
05 Chalkboards, Compartments & Cubicles
10 Louvers, Corner Protection & Access Flooring
15 Fireplaces, Ext. Specialties & Flagpoles
20 Identifying & Pedestrian Control Devices
25 Lockers,Protective Covers & Postal Specialties
30 Partitions & Storage Shelving
35 Telephone specialties
40 Toilet & Bath Accessories & Scales
45 Wardrobe & Closet Specialties
50 Equipment
RPS/CP Dept. Page 13 of 32
-
7/29/2019 Cost Codes
14/37
Division Sub Division Description
11 Equipment
05 Mercantile, Commercial & Detention Equipment
10 Food Services, Residential, Darkroom, Athletic Equipment
15 Industrial & Process Equipment
20 Laboratory, Planetarium, Observatory Equipment
25 Medical Equipment
12 Furnishings
05 Manufactured Casework
10 Window Treatment
15 Furniture & Accessories
20 Multiple Seating25 Interior Plants & Planters
13 Special Construction
05 Special Construction
10 Pre- Eng. Structures, Pools & Ice Rinks
15 Tanks, Tank Covers, Filtration Equipment
20 Utility Control Systems
25 Recording & Transportation Control Instrumentation
14 Conveying Systems
05 Dumbwaiters
10 Elevators
15 Moving stairs & Walks
20 Lifts
25 Material Handling Systems
30 Hoist & Cranes
15 Mechanical Works
05 Pipe & Fittings
10 Plumbing Fixtures & Bathroom Accessories
15 Plumbing Appliances
20 Fire Extinguishing Systems
25 Heating
30 HVAC Piping Specialties
35 Air Conditioning/Ventilating SystemRPS/CP Dept. Page 14 of 32
-
7/29/2019 Cost Codes
15/37
Division Sub Division Description
16 Electrical Works
05 Raceways
10 Conductors & Grounding
15 Boxes & Wiring Devices
20 Starters, Boards & switches
25 Transformers & Bus Ducts
30 Power Systems & Capacitors
35 Lighting
40 Electric Utilities
45 Special Systems
RPS/CP Dept. Page 15 of 32
-
7/29/2019 Cost Codes
16/37
SUB-DETAIL COST CODE ELEMENTS DESCRIPTION
Jeddah, Kingdom of Saudi Arabia
-
7/29/2019 Cost Codes
17/37
-
7/29/2019 Cost Codes
18/37
Division
01 General Requirements
Basic Salary & Overtime for Indirect Personnel:
01 Basic Salary & Overtime for Indirect Personnel
Expenses for Indirect Personnel:
02 Food Allowance for Indirect Personnel
03 Housing allowance for Indirect Personnel
04 Transportation allowance for Indirect Personnel
05 Living Allowance for Indirect Personnel
06 Air Ticket Allowance for Indirect Personnel
07 Other Allowance for Indirect Personnel-(Social Insurance)
08 Severance/End Service Pay
09 Medical Insurance for Indirect Personnel
10 Other Incentive/Bonuses for Indirect Personnel
11 Other Indirect Expenses
Administrative Personnel Expenses:
12 Social Insurance
13 Leave Pay
14 Leave Passage
15 Severance Pay
16 Medical Expenses
17 Insurance Expenses
18 Visa Expenses
19 Catering & Accomodation
20 Transportation Vehicle for Staff
21 Joining/Leaving Travel Expenses22 Training Expenses
23 Miscellaneous Expenses
Sub Division Description Sub-sub Division Description
RPS/CP Dept. Page 18 of 37
-
7/29/2019 Cost Codes
19/37
Division Sub Division Description Sub-sub Division Description
01 Site Office Running Expenses:
24 Consumables incl. Medicine
25 Water
26 Electricity
27 Stationary
28 Telephone, Mail & Telefaxes
29 Performance Bonds
30 Insurance
31 Business Travel & Accommodation
32 Consultant and Professional Fees
33 Entertainment
34 Misc. Office Requirement
35 Office Furniture & Equipment
36 Blue Printing Materials
37 Food & Beverage
38 Computer, Printers, Network
Client Running Expenses:
39 Telephone Client Expense
40 Copy Machine and Stationary Client Expense
41 Food & Beverage Client Expenses
42 Others Client Expense
Geotechnical Studies:
43 Testing Services
Temporary Facilities & Utilities (Mobilization):
44 Temporary Facilities & UtilitiesOverheads
45 Jeddah Area Office
Financial Expenses:
46 Contingencies & Escalations
47 Other Financial Expenses
Design & Engineering:
48 Design & Engineering icl. As-built drawingRPS/CP Dept. Page 19 of 37
-
7/29/2019 Cost Codes
20/37
Division Sub Division Description Sub-sub Division Description
01 Construction Equipments, Spareparts, Petrol, Oil & Lubricants:
Misc. Equipment:
49 Internal Rental
50 External/Outside Rental
Equipment, Tools & Spareparts:
51 Equipment, Tools & Spareparts
Petrol, Oil & Lubricants:
52 Petrol, Oil & Lubricants
Transportation cost of Material:
53 Transportation cost of Material
Scaffolding Rental:
54 Scaffolding Rental -Internal
55 Scaffolding Rental -External
56 Shuttering
Direct Construction Expenses:
57 Submittals (Drawings, Reports, Etc.)
58 Quality Control
59 Utilities Connection
60 Sanitation Services
61 Cosumable Material, Tools, Equipment & Safety
62 Contract Closeout
02 Site Works
05 Subsurface Investigations & Demolition
Std. Penetration Test
Site DemolitionBuilding Demolition
Selective Demolition
Concrete Removal
Asbestos removal
RPS/CP Dept. Page 20 of 37
-
7/29/2019 Cost Codes
21/37
Division Sub Division Description Sub-sub Division Description
10 Site Preparation
Site Clearing
Selective Clearing
Structure Moving
Dewatering
Well Points
Relief Wells
Shores
Underpinning
Sheet Piling
Cribbing & Walers
Slurry Wall
15 Earthworks
Grading
Excavation, Backfill & Compaction
Pavement Base
Soil Stabilization
Vibrofloatation
Slope/Erosion Control
Soil Treatment
20 Tunneling, Piles & Caissons
Tunnel Support Systems
Pile Driving
Driven Piles
Boared/Augered PilesCaissons
25 Railroad & Marine Works
Railroad Trackwork
Dredging
Dock & Facilities
RPS/CP Dept. Page 21 of 37
-
7/29/2019 Cost Codes
22/37
Division Sub Division Description Sub-sub Division Description
30 Paving & Surfacing
Walk/Road/Parking Paving
Unit pavers
Curbs
Athletic Pave/Surfacing
Synthetic Surfacing
Surfacing
Bridges
Pavement Markings
35 Pipe Utilities
Piped Utilities
Manhole & Cleanouts
Water Systems
Water Wells
Gas Distribution System
40 Sewerage & Drainage
Subdrainage Systems
Sewage Systems
Wastewater Systems
Syptic Systems
Relining Existing Pipelines
45 Site Improvements
Irrigation Systems
Fountains
Fences & GatesWalk/Road/Parking Appurtenances
Playfield Equipment
Site/Street Furnishings
50 Landscaping
Shrub/Tree Transplanting
Soil Preparation
Lawn & GrassesRPS/CP Dept. Page 22 of 37
-
7/29/2019 Cost Codes
23/37
Division Sub Division Description Sub-sub Division Description
Trees/Plants/Ground Cover
RPS/CP Dept. Page 23 of 37
-
7/29/2019 Cost Codes
24/37
Division Sub Division Description Sub-sub Division Description
03 Concrete Works
05 Concrete Formworks
Structure C.I.P. Formworks
10 Concrete Reinforcement
Reinforcing Steel
Welded Wire Fabric
Stressing Tendons
15 Cast-In-Place Concrete
Structural Concrete
Concrete Finishing
20 Precast Concrete
Structural Precast
Architectural Precast
Tilt-up Precast
Precast Specialties
25 Cementitious Decks
Lightweight Concrete
Wood Fiber Systems
04 Masonry Works
05 Mortar & Masonry Accessories
Mortar
Masonry Accessories
10 Unit Masonry
Chimneys
Brick MasonryConcrete Unit Masonry
Reinforced Unit Masonry
Masonry Panels
Structural Facing Tile
Ceramic Veneer
Masonry Veneer
Glass Unit MasonryRPS/CP Dept. Page 24 of 37
-
7/29/2019 Cost Codes
25/37
Division Sub Division Description Sub-sub Division Description
Adobe Masonry
RPS/CP Dept. Page 25 of 37
-
7/29/2019 Cost Codes
26/37
Division Sub Division Description Sub-sub Division Description
15 Stone
Stone
Rough Stone
Cut Stone
Simulated Stone
Stone Veneer
Marble
Limestone
Granite
Sandstone
Slate
20 Masonry Restoration & Cleaning/Refractories
Masonry Cleaning
Masonry Restoration
Flue Liners
Fire Brick
05 Metal Works
05 Finishes & Fastening
Metal Fastening
10 Structural Metal Framing
Bracing
Structural Steel
Structural Aluminum
Steel Wire Rope
15 Metal JoistSteel Joist
20 Metal Decking
Steel Deck
25 Metal Fabrications
Metal Stairs
Ladders
Handrails & RailingRPS/CP Dept. Page 26 of 37
-
7/29/2019 Cost Codes
27/37
Division Sub Division Description Sub-sub Division Description
Gratings & Floor Plates
RPS/CP Dept. Page 27 of 37
-
7/29/2019 Cost Codes
28/37
Division Sub Division Description Sub-sub Division Description
Casting
Metal Specialties
30 Expansion Joints
Expansion Cover Assemblies
06 Wood & Plastic
05 Fastener & Adhesive
Fasteners & Adhesives
10 Rough Carpentry
Wood Framing
Sheathing
Subfloor
Structural Panels
Wood Decking
Mineral Fbr. Cem. Panel
Heavy Timber Costruction
Wood Metal Systems
Glued-Laminated Construction
Wood Trusses
15 Finish Carpentry
Millwork Moldings
Shelving
Plastic Laminate
Prefinish Wood Paneling
Prefinish Hardboard Panel
Board PanelingMisc. Finish Carpentry
20 Wood Treatment
Preservative Treatment
25 Architectural Woodwork
Custom Casework
Stairwork & Handrails
Misc. Ornamental ItemsRPS/CP Dept. Page 28 of 37
-
7/29/2019 Cost Codes
29/37
Division Sub Division Description Sub-sub Division Description
07 Thermal & Moisture Protection
05 Waterproofing & Damproofing
Sheet Waterproofing
Bentonite Waterproofing
Cementitious Waterproofing
Bitumin Dampproofing
Water Repellent Coat
Cementitious Dampproofing
Vapor Retarders
10 Insulation
Building Insulation
Roof & Deck Insulation
Exterior Insulation
Fireproofing
15 Shingles & Roofing Tiles
Shingles
Roofing Tile
20 Preformed Roofing & Sidings
Preformed Panels
Composite Panels
Cladding/Siding
25 Membrane Roofing
Built-up Roofing
Cold Applied Roofing
Prepared Roll RoofingElastomeric Roofing
Modified Bit. Roofing
Roof Maint. & Repairs
30 Flashing & Sheet Metal
Sheet Metal Roofing
Sheet Metal Flash & Trim
RPS/CP Dept. Page 29 of 37
-
7/29/2019 Cost Codes
30/37
Division Sub Division Description Sub-sub Division Description
35 Roof Specialties & Accessories
Prefab Roof Specialties
Roof Accessories
40 Skylights
Plastic Skylights
Metal Framed Skylights
Glass Block Skylights
45 Joint Sealers
Sealants & Caulking
08 Doors & Windows
05 Metal Doors & Frames
Steel Doors & Frames
Alum Doors & Frames
10 Wood & Plastic Doors
Wood & Plastic Doors
15 Special Doors
Access Doors
Sliding Doors
Security Doors
Metal-Clad Doors
Cold Storage Doors
Coiling Doors
Coiling Grilles
Flexible Doors
Sectional Overhead DoorsMultileaf Vertical Lift Doors
Hangar Doors
Special Purpose Doors
Swing Doors
Sound Retardant Doors
Screen & Storm Doors
RPS/CP Dept. Page 30 of 37
-
7/29/2019 Cost Codes
31/37
Division Sub Division Description Sub-sub Division Description
20 Entrances & Storefronts
Aluminum
Stainless Steel
Automatic Doors
Revolving Doors
25 Metal Windows
Steel Windows
Aluminum Windows
Metal Jalousie Windows
Metal Storm Windows
Screen
30 Wood & Plastic Windows
Wood Windows
35 Hardware
Finish Hardware
Operators
Weatherstripping/Seals
Door/Window Accessories
40 Glazing
Glass
Plastic Glazing
45 Glazed Curtain Wall
Glazed Curtain Walls
09 Finishes
05 Metal Support SystemsSuspension System
10 Lath, Plaster & Gypsum Board
Furring & Lathing
Gypsum Plaster
Veneer Plaster
Aggregate Coatings
Gypsum Board SystemsRPS/CP Dept. Page 31 of 37
-
7/29/2019 Cost Codes
32/37
Division Sub Division Description Sub-sub Division Description
Drywall Accessories
RPS/CP Dept. Page 32 of 37
-
7/29/2019 Cost Codes
33/37
Division Sub Division Description Sub-sub Division Description
15 Tile
Ceramic Tile
Quarry Tile
Glass Mosaics
Metal Tile
20 Terrazzo
Portland Cement Terrazzo
Precast Terrazzo
25 Acoustical Treatment & Wood Flooring
Acoustical Ceilings
Acoustical Space Units
Acoustical Insulation
Wood Strip Flooring
Wood Block Flooring
Wood Composite Flooring
30 Flooring & Carpet
Marble Flooring
Slate Flooring
Brick Flooring
Resilient Tile Flooring
Resilient Accessories
Sheet Carpet
Carpet Tile
35 Special Flooring & Floor Treatment
Epoxy-Marble Flooring40 Special Coatings
Glazed Coatings
45 Painting & Wall Coverings
Exterior Painting
Interior Painting
Wall Paper
Surface PreparationRPS/CP Dept. Page 33 of 37
-
7/29/2019 Cost Codes
34/37
Division Sub Division Description Sub-sub Division Description
10 Specialties
05 Chalkboards, Compartments & Cubicles
Chalkboards
Toilet Compartments
Shower Compartments
10 Louvers, Corner Protection & Access Flooring
Metal Wall Louvers
Wall & Corner Guards
Access Flooring
15 Fireplaces, Ext. Specialties & Flagpoles
Prefabricated Fireplaces
Fireplace Accessories
Stoves
Cupolas
Ground Set Flagpoles
Wall Mounted Flagpoles
20 Identifying & Pedestrian Control Devices
Directories
Bulletin Boards
Signs
Turnstile
25 Lockers,Protective Covers & Postal Specialties
Metal Lockers
Canopies
Mail ChutesMail Boxes
30 Partitions & Storage Shelving
Wire Mesh Partitions
Folding Gates
Demountable Partitions
Portable Partitions
Panel PartitionsRPS/CP Dept. Page 34 of 37
-
7/29/2019 Cost Codes
35/37
Division Sub Division Description Sub-sub Division Description
Accordion Partitions
RPS/CP Dept. Page 35 of 37
-
7/29/2019 Cost Codes
36/37
Division Sub Division Description Sub-sub Division Description
Storage & Shelving
35 Telephone specialties
Telephone Enclosures
40 Toilet & Bath Accessories & Scales
Bath Accessories
Scales
45 Wardrobe & Closet Specialties
Coat Racks/Wardrobes
50 Equipment
Contractor Equipment
Maintenance Equipment
Security/Vault Equipment
Teller and Service Equipment
Ecclesiastical Equipment
Library Equipment
Theater/Stage Equipment
11 Equipment
05 Mercantile, Commercial & Detention Equipment
Barber Shop Equipment
Cash Register/Checking
Display Cases
Laundry/Dry Cleaning
Projection Screens
Service Station Equipment
Parking Control EquipmentLoading Dock Equipment
Waste Handling Equipment
Detention Equipment
10 Food Services, Residential, Darkroom, Athletic Equipment
Food Service Equipment
Disappearing Stairs
Darkroom ProcessingRPS/CP Dept. Page 36 of 37
-
7/29/2019 Cost Codes
37/37
Division Sub Division Description Sub-sub Division Description
Revolving Darkroom Doors