The University of Massachusetts at Amherst
Demand Response Program Over View
![Page 2: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/2.jpg)
UMA Participates in the ISO New England Demand Response Program via the DCAM contract facilitated by C-Power
![Page 3: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/3.jpg)
C-Power installed and monitors the required ISO New England electrical meters for the Demand Response Program.
These are three main campus electrical supply meters.
![Page 4: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/4.jpg)
UMA participates in the ISO New England Summer and Winter periods. Bidding in different Demand Reduction Values:
Winter – 1.5 Megawatt
Summer – 1 Megawatt
![Page 5: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/5.jpg)
UMA has assigned an in-house team to develop and implement a Demand Reduction Plan. This in-house team consists of:
Assistant Director Utilities
Central Heating Plant Manager
Campus Energy Engineer
Campus Meter & Control Engineer
![Page 6: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/6.jpg)
UMA Has Developed a Curtailment Plan That:
Identifies Actions to take when Event is Called
Person Responsible to carry out specific action
Back up personnel
Reaction Team contact information
Note: No Emergency Generators used
![Page 7: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/7.jpg)
Normally called to perform the Demand Reduction Plan about two times in winter and summer months. This may change due to new ISO New England Rules pertaining to performance rotation.
![Page 8: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/8.jpg)
UMA received about $90,000 from DCAM this past fiscal year for participating in this program.
This money went into funding energy reduction projects on campus – water filtration skid, steam pipe insulation, and new steam traps.
![Page 9: Creative Sources of Funding - Ray Jackson, UMass-Amherst](https://reader035.vdocument.in/reader035/viewer/2022081907/54beea064a7959af068b456f/html5/thumbnails/9.jpg)
Because of the new Central Heating Plant onsite electrical generation capabilities UMA additionally participates in the:
1. ISO New England FCM Program
2. DCAM APS Program