Cribbs Patchway MetroBus Extension
Preliminary designs for consultation November 2015
HIGHWAY PROPOSALS
Cribbs Patchway MetroBus Extension Zone 1
Cutline
Cutline
3m
2m
3.5m
1.9m
2m
2m
16m
Hatchet R
oad
Hatchet LaneRatc
liffe D
rive
Sandr
ingha
m Roa
d
NOTES
All dimensions are in metres unless noted otherwise.
This drawing should not be scaled and only written dimensionsshould be used. Any discrepancies should be brought to theattention of this department immediately.
1.
2.
DEPARTMENT OF ENVIRONMENTAND COMMUNITY SERVICES
DIRECTORSteve Evans
STREETCARE TRANSPORT & WASTEPO Box 299, Civic Centre, High Street,
Bristol. BS15 0DRTelephone: 01454 868 000
Email: [email protected]
Rev Description DateDrawn App'd
Project
Title
Dwg No.
Scale @ A1
Date
Acad Ref
Parish Scheme Number
Approved
Drawn
Rev.
I:\TNS Schemes\T001-General\299 - Metrobus Extension\5. Docs & Dwgs\Drawings\
__
I:\TNS
Sch
emes
\T00
1-Ge
nera
l\299
- Me
trobu
s Exte
nsion
\5. D
ocs &
Dwg
s\Dra
wing
s\T00
1-29
9-01
8-02
5 Con
sulta
tion P
lans O
ption
1.dw
g : P
lotted
by jrj
on N
ov 12
, 201
5 - 9:
46am
Aca
d R
ef
ORDNANCE SURVEY
© Crown copyright and database rights Ordnance Survey 100023410. 2015
KEY
Cribbs Patchway
Metrobus Extension
Consultation proposals
Sheet 6 of 6
1:500
Sept.15
T001 299 025 -
0 10 3020 40 50
SCALE 1:500 (A1)SCALE 1:1000 (A3)
METRES
Proposed grass
Proposed boundarywalls 3m high
Proposed carriageway
Proposed planting
Proposed Route Alignment
Retained trees
Proposed Bus Lane
Proposed shared use cycle/footway
Proposed footway
Existing Bus Stop upgradedto MetroBus Stop
Retained hedgerow / trees
The stretch near the Co-op shop
Hatchet Road
Cribbs Patchway MetroBus Extension Zone 1
NOTES
All dimensions are in metres unless noted otherwise.
This drawing should not be scaled and only written dimensionsshould be used. Any discrepancies should be brought to theattention of this department immediately.
1.
2.
DEPARTMENT OF ENVIRONMENTAND COMMUNITY SERVICES
DIRECTORSteve Evans
STREETCARE TRANSPORT & WASTEPO Box 299, Civic Centre, High Street,
Bristol. BS15 0DRTelephone: 01454 868 000
Email: [email protected]
Rev Description DateDrawn App'd
Project
Title
Dwg No.
Scale @ A1
Date
Acad Ref
Parish Scheme Number
Approved
Drawn
Rev.
I:\TNS Schemes\T001-General\299 - Metrobus Extension\5. Docs & Dwgs\Drawings\
__
I:\TNS
Sch
emes
\T00
1-Ge
nera
l\299
- Me
trobu
s Exte
nsion
\5. D
ocs &
Dwg
s\Dra
wing
s\T00
1-29
9-01
8-02
5 Con
sulta
tion P
lans O
ption
1.dw
g : P
lotted
by jrj
on N
ov 12
, 201
5 - 9:
46am
Aca
d R
ef
ORDNANCE SURVEY
© Crown copyright and database rights Ordnance Survey 100023410. 2015
KEY
Cribbs Patchway
Metrobus Extension
Consultation proposals
Sheet 5 of 6
1:500
Sept.15
T001 299 024 -
Proposed planting
Proposed hedgerow
Retained hedgerow / trees
KEY
Retained trees
Proposed Bus Lane
Proposed shared use cycle/footway
Proposed footway
Proposed uncontrolledcrossing (Buff tactiles)
Proposed controlledcrossing (Red tactiles)
Proposed new trees
Proposed grass
Proposed carriageway
Proposed newboundary 3m high
Existing Bus Stop upgradedto MetroBus Stop
Existing Bus Stop retained
Proposed 'Toucan' pedestrian& cycle controlled crossing
Hat
chet
Roa
d
0 10 3020 40 50
SCALE 1:500 (A1)SCALE 1:1000 (A3)
METRES
Winterbourne Road
Hat
chet
Roa
d
zone1DetailedDiagrams.pdf 1 13/11/2015 10:31
Between Sandringham Roadand Gipsy Patch Lane roundabout
Hatchet Road
Cribbs Patchway MetroBus Extension Zone 1
Hatchet Road
NOTES
All dimensions are in metres unless noted otherwise.
This drawing should not be scaled and only written dimensionsshould be used. Any discrepancies should be brought to theattention of this department immediately.
1.
2.
DEPARTMENT OF ENVIRONMENTAND COMMUNITY SERVICES
DIRECTORSteve Evans
STREETCARE TRANSPORT & WASTEPO Box 299, Civic Centre, High Street,
Bristol. BS15 0DRTelephone: 01454 868 000
Email: [email protected]
Rev Description DateDrawn App'd
Project
Title
Dwg No.
Scale @ A1
Date
Acad Ref
Parish Scheme Number
Approved
Drawn
Rev.
I:\TNS Schemes\T001-General\299 - Metrobus Extension\5. Docs & Dwgs\Drawings\
__
I:\TNS
Sch
emes
\T00
1-Ge
nera
l\299
- Me
trobu
s Exte
nsion
\5. D
ocs &
Dwg
s\Dra
wing
s\T00
1-29
9-01
8-02
5 Con
sulta
tion P
lans O
ption
1.dw
g : P
lotted
by jrj
on N
ov 12
, 201
5 - 9:
45am
Aca
d R
ef
ORDNANCE SURVEY
© Crown copyright and database rights Ordnance Survey 100023410. 2015
KEY
Cribbs Patchway
Metrobus Extension
Consultation proposals
Sheet 4 of 6
1:500
Sept.15
T001 299 023 -
0 10 3020 40 50
SCALE 1:500 (A1)SCALE 1:1000 (A3)
METRES
KEY
Retained trees
Proposed Bus Lane
Existing Bus Stop upgradedto MetroBus Stop
Proposed shared use cycle/footway
Proposed footway
Proposed new trees
Proposed grass
Proposed carriageway
Proposed planting
Proposed uncontrolledcrossing (Buff tactiles)
Proposed controlledcrossing (Red tactiles)
Proposed newboundary 3m high
Proposed hedgerow
Gipsy Patch Lane
Winterbourne Road
Little Stoke Lane
Gipsy Patch Lane
Smithcourt Drive
yaws
neeu
Q
Little Stoke Lane
Near to Hatchet Road roundabout and Queensway
Gipsy Patch Lane
Cribbs Patchway MetroBus Extension Zones 1 and 2
NOTES
All dimensions are in metres unless noted otherwise.
This drawing should not be scaled and only written dimensionsshould be used. Any discrepancies should be brought to theattention of this department immediately.
1.
2.
DEPARTMENT OF ENVIRONMENTAND COMMUNITY SERVICES
DIRECTORSteve Evans
STREETCARE TRANSPORT & WASTEPO Box 299, Civic Centre, High Street,
Bristol. BS15 0DRTelephone: 01454 868 000
Email: [email protected]
Rev Description DateDrawn App'd
Project
Title
Dwg No.
Scale @ A1
Date
Acad Ref
Parish Scheme Number
Approved
Drawn
Rev.
I:\TNS Schemes\T001-General\299 - Metrobus Extension\5. Docs & Dwgs\Drawings\
__
I:\TNS
Sch
emes
\T00
1-Ge
nera
l\299
- Me
trobu
s Exte
nsion
\5. D
ocs &
Dwg
s\Dra
wing
s\T00
1-29
9-01
8-02
5 Con
sulta
tion P
lans O
ption
1.dw
g : P
lotted
by jrj
on N
ov 12
, 201
5 - 9:
45am
Aca
d R
ef
ORDNANCE SURVEY
© Crown copyright and database rights Ordnance Survey 100023410. 2015
KEY
Cribbs Patchway
Metrobus Extension
Consultation proposals
Sheet 3 of 6
1:500
Sept.15
T001 299 022 -
0 10 3020 40 50
SCALE 1:500 (A1)SCALE 1:1000 (A3)
METRES
KEY
Retained trees
Proposed Bus Lane
Proposed shared use cycle/footway
Proposed footway
Proposed new trees
Proposed grass
Proposed culvertand boundary wall
Proposed carriageway
Proposed Route Alignment
Proposed planting
Proposed uncontrolledcrossing (Buff tactiles)
Proposed controlledcrossing (Red tactiles)
Existing Bus Stop upgradedto MetroBus Stop
Proposed 'Toucan' pedestrian& cycle controlled crossing
Proposed bridge structure
Gipsy Patch Lane
Station Road
Bush Avenue
Gipsy Patch Lane
Indicative road and junction layouts to be
implemented by the East Works developer
1: Near the rail bridge2: West of the rail bridge near to the East Works site
1
2
Gipsy Patch Lane
Cribbs Patchway MetroBus Extension Zone 3
North Way
Nor
th W
ay
0 10 3020 40 50
SCALE 1:500 (A1)
SCALE 1:1000 (A3)
METRES
Proposals to tie into the RollsRoyce (East works) Development
Proposed Bus Lane,new link road
Retained hedgerow
Proposed Route Alignment
Proposed footway
Proposed uncontrolledcrossing (buff tactiles)
Proposed new trees
Proposed grass
Proposed MetroBusBus Stop
NOTES
All dimensions are in metres unless noted otherwise.
This drawing should not be scaled and only written dimensionsshould be used. Any discrepancies should be brought to theattention of this department immediately.
1.
2.
DEPARTMENT OF ENVIRONMENTAND COMMUNITY SERVICES
DIRECTORSteve Evans
STREETCARE TRANSPORT & WASTEPO Box 299, Civic Centre, High Street,
Bristol. BS15 0DR
Telephone: 01454 868 000
Email: [email protected]
Rev Description DateDrawn App'd
Project
Title
Dwg No.
Scale @ A1
Date
Acad Ref
Parish Scheme Number
Approved
Drawn
Rev.
I :\tns schemes\t001-general\299 - met robus extension\5. docs & dwgs\Drawings\
__
I:\tn
s sc
hem
es\t0
01-g
ener
al\2
99 -
met
robu
s ex
tens
ion\
5. d
ocs
& d
wgs
\Dra
win
gs\T
001-
299-
018-
025
Con
sulta
tion
Pla
ns O
ptio
n 1.
dwg
: Plo
tted
by jr
j on
Oct
22,
201
5 -
5:09
pmA
cad R
ef
ORDNANCE SURVEY
© Crown copyright and database rights Ordnance Survey 100023410. 2015
KEY
Cribbs Patchway
Metrobus Extension
Consultation proposals
Sheet 2 of 6
1:500
Sept.15
T001 299 021 -
Near North Way
Cribbs Patchway MetroBus Extension Zone 4
0 10 3020 40 50
SCALE 1:500 (A1)
SCALE 1:1000 (A3)
METRES
San AndreasRoundabout
Hig
hwoo
d R
oad
Hayes Way
Merlin Road
The MallCribbs Causeway
Proposals to tie intoFilton Airfield Development
The MallCar Park
Proposed Bus Lane,new link road
Proposed hedgerow
Proposed Route Alignment
Retained trees
Proposed shared use cycle/footway
Proposed footway
Proposed new trees
Proposed grass
Proposed carriageway
Proposed uncontrolledcrossing (Buff tactiles)
Proposed controlledcrossing (Red tactiles)
Retained hedgerow / trees
NOTES
All dimensions are in metres unless noted otherwise.
This drawing should not be scaled and only written dimensionsshould be used. Any discrepancies should be brought to theattention of this department immediately.
1.
2.
DEPARTMENT OF ENVIRONMENTAND COMMUNITY SERVICES
DIRECTORSteve Evans
STREETCARE TRANSPORT & WASTEPO Box 299, Civic Centre, High Street,
Bristol. BS15 0DR
Telephone: 01454 868 000
Email: [email protected]
Rev Description DateDrawn App'd
Project
Title
Dwg No.
Scale @ A1
Date
Acad Ref
Parish Scheme Number
Approved
Drawn
Rev.
I :\tns schemes\t001-general\299 - met robus extension\5. docs & dwgs\Drawings\
__
I:\tn
s sc
hem
es\t0
01-g
ener
al\2
99 -
met
robu
s ex
tens
ion\
5. d
ocs
& d
wgs
\Dra
win
gs\T
001-
299-
018-
025
Con
sulta
tion
Pla
ns O
ptio
n 1.
dwg
: Plo
tted
by jr
j on
Oct
21,
201
5 -
10:2
7am
Aca
d R
ef
ORDNANCE SURVEY
© Crown copyright and database rights Ordnance Survey 100023410. 2015
KEY
Cribbs Patchway
Metrobus Extension
Consultation proposals
Sheet 1 of 6
1:500
Sept.15
T001 299 020 -
Proposed 'Toucan' pedestrian& cycle controlled crossing
San Andreas roundabout