STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71
7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION
Caulk poly 1 compound 1/2 x 1/2
Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"
DESCRIPTION
Pressure CleaningWATERPROOFING & DAMPROOFING
WP - acrylic brush applied texturedWP - acrylic brush applied smooth
WP-non-pigmented, Silane 1 coat vertical
Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2
WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade
Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal
STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79
7.37.3 10 100 sf $0.477.3 20 200 sf $1.92
7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82
BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III
BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III
Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION
Shingles 260/300 lb. Remove comp. shingles
SHINGLES & ROOF TILES
Insul. Tapered 1/4" Iso in type III
Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast
Insul. Lightweight cellular per 1" depth
lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III
STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.47 60 Squares7.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50
7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset
Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY
Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric
BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum
BUR surface emulsion and aluminum ST
S
STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.67.6 10 100 sf $0.927.6 10 200 sf $5.607.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36
Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide
METAL WORK
Remove counter flashing
Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box
Remove metal decking Install metal decking
Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge
ST
STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44
7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00
ROOF SPECIALTIES & ACCESSORIES
Curbing treated 2x12Nailer treated 2x6
Nailer treated 1x4Cants treated wood
Nailer treated 2x4
Cants woodfiber
Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK
Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch
Joist fir 2x10 Joist fir 2x6
Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"
STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62
7.97.9 10 100 sf $1.85
7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee
Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES
FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)
PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4
Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR
Plumbing stack #4 leadReflash existing roof drain Install new roof drain
Termination bar
Remove existing walkways Scupper 16 oz. match existing
STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
TASK ORDER # _______________________________________________
PURCHASE ORDER #____________________________________________
CONTRACTOR'S SIGNATURE ___________________________________
DATE: ___________________________________
ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________
TOTAL LABOR & MATERIALS $_____________________________________________________________
STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71
7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION
Caulk poly 1 compound 1/2 x 1/2
Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"
DESCRIPTION
Pressure CleaningWATERPROOFING & DAMPROOFING
WP - acrylic brush applied texturedWP - acrylic brush applied smooth
WP-non-pigmented, Silane 1 coat vertical
Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2
WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade
Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal
STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79
7.37.3 10 100 sf $0.477.3 20 200 sf $1.92
7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82
BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III
BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III
Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION
Shingles 260/300 lb. Remove comp. shingles
SHINGLES & ROOF TILES
Insul. Tapered 1/4" Iso in type III
Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast
Insul. Lightweight cellular per 1" depth
lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III
STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.477.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50
7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset
Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY
Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric
BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum
BUR surface emulsion and aluminum ST
S
STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.67.6 10 100 sf $0.927.6 10 200 sf $5.607.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36
Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide
METAL WORK
Remove counter flashing
Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box
Remove metal decking Install metal decking
Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge
ST
STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44
7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00
ROOF SPECIALTIES & ACCESSORIES
Curbing treated 2x12Nailer treated 2x6
Nailer treated 1x4Cants treated wood
Nailer treated 2x4
Cants woodfiber
Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK
Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch
Joist fir 2x10 Joist fir 2x6
Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"
STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 1,185 Linear Ft.7.8 80 200 lf $39.027.8 80 300 ea $37.62
7.97.9 10 100 sf $1.85
7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee
Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES
FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)
PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4
Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR
Plumbing stack #4 leadReflash existing roof drain Install new roof drain
Termination bar
Remove existing walkways Scupper 16 oz. match existing
STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
TASK ORDER # _______________________________________________
PURCHASE ORDER #____________________________________________
CONTRACTOR'S SIGNATURE ___________________________________
DATE: ___________________________________
ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________
TOTAL LABOR & MATERIALS $_____________________________________________________________
STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71
7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION
Caulk poly 1 compound 1/2 x 1/2
Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"
DESCRIPTION
Pressure CleaningWATERPROOFING & DAMPROOFING
WP - acrylic brush applied texturedWP - acrylic brush applied smooth
WP-non-pigmented, Silane 1 coat vertical
Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2
WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade
Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal
STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79
7.37.3 10 100 sf $0.477.3 20 200 sf $1.92
7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82
BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III
BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III
Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION
Shingles 260/300 lb. Remove comp. shingles
SHINGLES & ROOF TILES
Insul. Tapered 1/4" Iso in type III
Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast
Insul. Lightweight cellular per 1" depth
lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III
STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.477.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50
7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset
Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY
Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric
BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum
BUR surface emulsion and aluminum ST
S
STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.67.6 10 100 sf $0.927.6 10 200 sf $5.60 1,600 Sq.Ft.7.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36
Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide
METAL WORK
Remove counter flashing
Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box
Remove metal decking Install metal decking
Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge
ST
STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44
7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00
ROOF SPECIALTIES & ACCESSORIES
Curbing treated 2x12Nailer treated 2x6
Nailer treated 1x4Cants treated wood
Nailer treated 2x4
Cants woodfiber
Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK
Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch
Joist fir 2x10 Joist fir 2x6
Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"
STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62
7.97.9 10 100 sf $1.85
7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee
Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES
FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)
PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4
Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR
Plumbing stack #4 leadReflash existing roof drain Install new roof drain
Termination bar
Remove existing walkways Scupper 16 oz. match existing
STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
TASK ORDER # _______________________________________________
PURCHASE ORDER #____________________________________________
CONTRACTOR'S SIGNATURE ___________________________________
DATE: ___________________________________
ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________
TOTAL LABOR & MATERIALS $_____________________________________________________________
STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71
7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION
Caulk poly 1 compound 1/2 x 1/2
Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"
DESCRIPTION
Pressure CleaningWATERPROOFING & DAMPROOFING
WP - acrylic brush applied texturedWP - acrylic brush applied smooth
WP-non-pigmented, Silane 1 coat vertical
Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2
WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade
Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal
STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79
7.37.3 10 100 sf $0.47 18 Squares7.3 20 200 sf $1.92 18 Squares
7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82
BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III
BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III
Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION
Shingles 260/300 lb. Remove comp. shingles
SHINGLES & ROOF TILES
Insul. Tapered 1/4" Iso in type III
Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast
Insul. Lightweight cellular per 1" depth
lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III
STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.47 39 Squares7.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50
7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset
Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY
Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric
BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum
BUR surface emulsion and aluminum ST
S
STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.67.6 10 100 sf $0.927.6 10 200 sf $5.60 1,600 Sq.Ft.7.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36
Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide
METAL WORK
Remove counter flashing
Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box
Remove metal decking Install metal decking
Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge
ST
STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44
7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00
ROOF SPECIALTIES & ACCESSORIES
Curbing treated 2x12Nailer treated 2x6
Nailer treated 1x4Cants treated wood
Nailer treated 2x4
Cants woodfiber
Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK
Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch
Joist fir 2x10 Joist fir 2x6
Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"
STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62
7.97.9 10 100 sf $1.85
7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee
Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES
FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)
PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4
Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR
Plumbing stack #4 leadReflash existing roof drain Install new roof drain
Termination bar
Remove existing walkways Scupper 16 oz. match existing
STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
TASK ORDER # _______________________________________________
PURCHASE ORDER #____________________________________________
CONTRACTOR'S SIGNATURE ___________________________________
DATE: ___________________________________
ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________
TOTAL LABOR & MATERIALS $_____________________________________________________________
STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71
7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION
Caulk poly 1 compound 1/2 x 1/2
Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"
DESCRIPTION
Pressure CleaningWATERPROOFING & DAMPROOFING
WP - acrylic brush applied texturedWP - acrylic brush applied smooth
WP-non-pigmented, Silane 1 coat vertical
Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2
WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade
Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal
STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79
7.37.3 10 100 sf $0.477.3 20 200 sf $1.92
7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82
BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III
BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III
Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION
Shingles 260/300 lb. Remove comp. shingles
SHINGLES & ROOF TILES
Insul. Tapered 1/4" Iso in type III
Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast
Insul. Lightweight cellular per 1" depth
lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III
STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.24 304 Squares7.4 35 600 sf $2.477.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50
7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset
Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY
Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric
BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum
BUR surface emulsion and aluminum ST
S
STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.67.6 10 100 sf $0.927.6 10 200 sf $5.607.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 1,403 Linear Ft.7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.43 1,403 Linear Ft.7.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36
Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide
METAL WORK
Remove counter flashing
Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box
Remove metal decking Install metal decking
Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge
ST
STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44
7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00
ROOF SPECIALTIES & ACCESSORIES
Curbing treated 2x12Nailer treated 2x6
Nailer treated 1x4Cants treated wood
Nailer treated 2x4
Cants woodfiber
Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK
Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch
Joist fir 2x10 Joist fir 2x6
Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"
STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62
7.97.9 10 100 sf $1.85
7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee
Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES
FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)
PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4
Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR
Plumbing stack #4 leadReflash existing roof drain Install new roof drain
Termination bar
Remove existing walkways Scupper 16 oz. match existing
STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7
CUMBERLAND COUNTY SCHOOLS
DATE INITIAL DATE INITIALCCS CONTRACTOR
MEASUREMENTS MEASUREMENTS
DIV SEC ITEM units $/unit
BUDGET COST
BUDGET COST
STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________
BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________
DESCRIPTION
TASK ORDER # _______________________________________________
PURCHASE ORDER #____________________________________________
CONTRACTOR'S SIGNATURE ___________________________________
DATE: ___________________________________
ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________
TOTAL LABOR & MATERIALS $_____________________________________________________________