Transcript
Page 1: Curriculum Vitae - 2 Romo Studio2romostudio.com/wp-content/uploads/2018/10/CVRRTENG.pdf28012 Madrid Spain Telephone: +447503891817 +34603423418 E-mail: r.romo@2romostudio.com Employment

Curriculum Vitae

Personal information

Name: Rocio Romo

Chartered Architect in the UK and Spain

Address: Sebastian Elcano Street 32 Loft 56 28012 Madrid Spain

Telephone: +447503891817 +34603423418

E-mail: [email protected]

Employment History

Present Architect at 2Romo Studio

2014-2017 Knight Architects, Part 2 Architectural Assistant

2013-2013 Picado de Blas Arquitectos, Collaborator

2013-2010 FHECOR Consulting Engineers, Collaborator

Education

2016 Postgraduate Diploma in Professional Practice in Architecture ( RIBA Part 3), University of Westminster

2014 RIBA Part 2, AA School of Architecture

2012 RIBA Part 1, AA School of Architecture

2010 Architecture ( 3 years), Universidad Europea de Madrid

2007 Civil engineering (1 year), Universidad Politecnica de Madrid

Personal pro�le

Postgraduate in Professional Practice in Architecture ( RIBA Part 3) at Westminster University. Considerable bridge design experience, having worked on several designs for the spanish bridge engineering company FHECOR, including the competition winning design in Pamplona. Experience at Knight Architects includes the tender design for the new M4 River Usk Crossing in Newport, pedestrian and cycle bridges in the danish port of Esjberg and a pedestrian and cycle bridge in Bristol.

Awards

2010 Second prize, Photography Award UEM

2015 Winners of Young Professional scheme at the Workshop on Bridge Design organized by the Spanish IABSE

Selected Projects

2016 St. Philips footbridge,Bristol RIBA Workstages 0-4

Strategic de�nition, preparation and brief, concept design, developed design, technical design.

2016 Colne Valley Viaduct, Buckinghamshire, England RIBA Workstages 0-1

Strategic de�nition, preparation and brief

2016 M-4 Can, Percoed Reen NMU Bridge, Newport RIBA Workstages 3

Concept design

2015 M-4 Southern Route, Newport, Wales RIBA Workstages 2-4

Competition: Concept design, developed design, technical design

Page 2: Curriculum Vitae - 2 Romo Studio2romostudio.com/wp-content/uploads/2018/10/CVRRTENG.pdf28012 Madrid Spain Telephone: +447503891817 +34603423418 E-mail: r.romo@2romostudio.com Employment

2015 Kruunusillat, Helsinki, Finland RIBA Workstage 4

Technical design

2014 New gangway and harbour promenade, Esjberg, Denmark RIBA Workstages 3

Competition: Concept design, developed design

2014 Sluppen Road bridge, Trondheim, Norway RIBA Workstages 2-3

Competition: Concept design, developed design

2014 Sluppen footbridge, Trondheim, Norway RIBA Workstages 2-3

Competition: Concept design, developed design

2013 Footbridge in Salford, United Kingdom RIBA Workstages 2-3

Competition: Concept design, developed design

2013 Movable Footbridge, Gdansk, Poland RIBA Workstages 2-3

Competition: Concept design, developed design

2011 Bridge in Zorrozaure, Bilbao, Spain RIBA Workstages 2-3

Competition: Concept design, developed design

2009 Bridge in Cuatrovientos, Pamplona, Spain RIBA Workstages 2-3

Competition: Concept design, developed design


Top Related