DATA RATES- P AND M WORKS
FOR THE YEAR : 2010-11
CONTENTS PAGES
REFERENCE DATA 3 -- 4
NOTES ON BASIC RATES 5 -- 5
DATA RATES 6 -- 80
MAINTENANCE WORKS
REVISED BY SCHEDULE OF RATES COMMITTEE
zgn wAzjjnz
d A ES
WATER RESOURCES DEPARTMENT
SCHEDULE OF RATES
PRELIMINARY
AND
1
-
8/13/2019 Data Rates-P & M Works 1
2/20
DATA RATES- P AND M WORKS
2
-
8/13/2019 Data Rates-P & M Works 1
3/20
DATA RATES- P AND M WORKS
FOR THE YEAR : 2010-11
COST OF MATERIALS :
1 Acetylene gas per cum Rs: 258.00
2 Air hose 25 mm dia per Rm Rs: 150.00
3 Anti-corrosive bituminous black paint / ltr Rs: 94.00
4 Cardium compound per kg Rs: 80.00
5 Casing shoe bit per No. Rs: 8305.00
6 Cement 43 Gr per kg Rs: 4.00
7 Coal tar epoxy paint per litre Rs: 208.00
8 Coarse aggregate 10-4.75 mm per cum Rs: 669.00
9 Coarse aggregate 20-10 mm per cum Rs: 520.00
10 Coarse aggregate 40-20 mm per cum Rs: 381.00
11 Coir brush per No. Rs: 20.00
12 Degreasing / derusting chemical per ltr Rs: 240.00
13 Detonating fuse coil per Rm Rs: 8.00
14 Detonator electric per No. Rs: 10.00
15 Diamond core bit BX size per No. Rs: 9470.00
16 Diamond core bit NX size per No. Rs: 12000.00
17 Double tube core barrel per No. Rs: 11000.00
18 Explosive small dia per kg Rs: 45.00
19 Extension rods with coupling sleeve per Rm Rs: 3300.00
20 Gear oil HP-90 per ltr Rs: 159.00
21 Grease GEM-RR3 per kg Rs: 194.00
22 Honne wood planks per cum Rs: 43000.00
23 Jack hammer drill rod 1.5 m per No. Rs: 3400.00
24 Murrum per cum Rs: 60.00
25 Oxalic acid per ltr Rs: 60.00
26 Oxygen gas per cum Rs: 48.0027 Rafter nails per kg Rs: 55.00
28 Reamer shell per No. Rs: 4053.00
29 Rough stone 200 x 200 x 750 mm per No. Rs: 13.00
30 Rubber bottom seal flat type per Rm Rs: 147.00
31 Rubber seal bulb type uncladded per Rm Rs: 235.00
32 Rubber side seal Z- type per Rm Rs: 295.00
33 Sand ( screened ) per cum Rs: 199.00
34 Sand ( unscreened ) per cum Rs: 154.00
35 Sand blast gun nozzle per No. Rs: 312.00
36 Stone chips at quarry per cum Rs: 240.00
37 Super plastciser per ltr Rs: 75.00
38 Synthetic enamel paint ( 1st quality ) per ltr Rs: 176.00
39 Uncoursed rubble stone at quarry per cum Rs: 200.00
40 Water hose 20 mm dia per Rm Rs: 128.0041 Weld mess 100 x 50 mm 10 gauge per sqm Rs: 150.00
42 Wire brush per No. Rs: 30.00
43 Zinc chromate, Alluminium primer / ltr Rs: 140.00
44 Zinc rich epoxy primer ( zinc content 85 % ) per ltr Rs: 594.00
45 Hot dipped G I bolts / Nuts / Washers per kg Rs: 95.00
46 Rubber seal bulb type teflon cladded per Rm Rs: 675.00
REFERENCE DATA FOR SCHEDULE OF RATES
PRELIMINARY & MAINTENANCE WORKS
3
-
8/13/2019 Data Rates-P & M Works 1
4/20
DATA RATES- P AND M WORKS
HIRE CHARGES OF MACHINERY : Crew charge
1 Air compressor 7 cmm ( diesel ) per hour Rs: 166.00 495.00 72.10
2 Air compressor 8.5 cmm (diesel) per hour Rs: 202.00 619.00 72.10
3 Angle dozer per hour Rs: 1154.00 423.00 77.50
4 Core drilling machine per hour Rs: 252.00 165.00 90.20
5 Diesel road roller per hour Rs: 228.00 495.00 72.00
6 Electric resistivity meter per hour Rs: 63.00 --- ---
7 Jack hammer per hour Rs: 14.00 5.00 111.90
8 Pump ( diesel ) 5 hp per hour Rs: 7.00 55.00 35.80
9 Shovel 0.5 cum per hour Rs: 725.00 330.00 77.50
10 Sand blasting equipment per hour Rs: 84.00 9.00 74.40
11 Tipper 5 cum per hour Rs: 271.00 208.00 56.70
12 Vibratory pad foot roller per hour Rs: 1130.00 715.00 90.60
13 Water tanker 8000 ltr per hour Rs: 268.00 208.00 56.70
LEAD / LOADING / UNLOADING CHARGES : Unloading1 Earth per cum Rs: 35.10 41.30 8.50
2 Cement per tonne Rs: 37.90 45.60 45.60
3 Sand per cum Rs: 35.10 41.30 8.50
4 Coarse aggregate per cum Rs: 48.70 48.80 24.40
ROYALTY CHARGES : Per tonne
1 Earth / Murum Rs: 10.00
2 Sand / Fine aggregate Rs: 30.00
3 Stone / Coarse aggregate / Chips Rs: 30.00
ADDITIONAL LIFT CHARGES FOR EVERY 1.50 m : Per cum
1 Earth / Sand / Gravel / Soft rock Rs: 4.30
( As per statement of lift charges )
WAGES OF WORKERS : Per day
1 Blaster ( Lincensed ) Rs: 147.00
2 Cartman with Double bullock cart Rs: 178.50
3 Crowbarman Rs: 141.50
4 Geologist / Geophysist Rs: 201.00
5 Graduate Engineer Rs: 201.00
6 Helper blasting Rs: 141.50
7 Lab Assistant Rs: 149.008 Maistry Rs: 141.50
9 Mason Cl I Rs: 159.00
10 Mason Cl II Rs: 148.50
11 Mazdoor heavy Rs: 132.00
12 Mazdoor light Rs: 130.50
13 Mechanic-II Rs: 151.00
Loading1 km lead
Hire charge Fuel charge
4
-
8/13/2019 Data Rates-P & M Works 1
5/20
DATA RATES- P AND M WORKS
13 Painter Cl II Rs: 141.50
14 Stone breaker Rs: 146.00
15 Stone Chiseller Cl I Rs: 148.50
16 Stone Chiseller Cl II Rs: 146.00
17 Marker / Fabricator Rs: 157.50
18 Helper marker / fabricator Rs: 141.50
19 Mazdoor cement handling Rs: 134.00
OTHER DATA :
1 Contractor's Overheads on Materials / Machinery / Labour % 5.00
2 Contractor's Profit on Materials / Fuel & Energy charges / Labour % 10.00
3 Hidden cost on Labour % 15.00
4 Small Tools & Plant on Materials / Machinery / Labour % 1.00
5 Sundries ( Lump sum rate for unquantified inputs ) Rs: 30.00
5
-
8/13/2019 Data Rates-P & M Works 1
6/20
DATA RATES- P AND M WORKS
FOR THE YEAR : 2010-11
1. All notes under General Notes on Schedule of Rates and Notes on Lead, Lift, Loading andun-loading charges are applicable to Preliminary and Maintenance Works also to the extent
they are relevant.
2. The area where jungle growth is thin or the area where jungle growth is thick with noticeable
vacant spots but not large enough to exclude them from measurements shall be classified as
thin jungle.
3. The area where the jungle growth is thick without noticeable vacant spots shall be classified as
thick jungle.
4. Areas of large vacant spots and areas occupied by structures shall be excluded from
measurement for jungle clearance works.
5. In case of jauliflora clearance girth means spread of the bush.
6. Unless otherwise specified the basic rates are inclusive of all lifts.
7. Unless otherwise specified the basic rates are inclusive of standard finishing required for
concrete surface.
8. For embankment in breached section 1 km initial lead is considered in the basic rates. As no
storing / stacking and re-handling of materials is involved for these works lead charges for
additional lead shall be worked out for total lead including initial lead of 1 km and then the
cost of first km lead shall be deducted. No loading and un-loading charges shall be added as
the additional lead does not involve re-handling of materials.
Example :
Total lead for soil from approved borrow area : 2 kmInitial lead included in the basic rate in the SR : 1 km
Additional lead charges : Lead charges for 2 km Rs: 43.10
Less Lead charges for 1 km Rs: -35.10
Additional lead charges / cum Rs: 8.00
Quantity of soil required as per statement of requirement of material : 1.20 cum
Additional lead charges to be added to basic rate Rs: 9.60
No loading and un-loading charges shall be added.
9. The quantities of materials including wastage, requirements for incidentals etc., for working
out additional lead charges shall be as per the statement of requirement of materials under
this section.
NOTES ON SCHEDULE OF RATES
PRELIMINARY AND MAINTENANCE WORKS
6
-
8/13/2019 Data Rates-P & M Works 1
7/20
DATA RATES- P AND M WORKS
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 1.a
ITEM: Clearing thin jungle growth ( more than 50 percent open space ) including bushes upto
300 mm / parthenium and other weeds including burning or disposing off the same as directed
etc., complete.
DATA:2 heavy & 1 light mazdoors can clear 1000 sqm thin jungle area per day.
Consider 1000 sqm thin jungle clearance for data rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 0.5 No.
Heavy mazdoor : 2 Nos.
Light mazdoor : 1 No.
RATE ANALYSIS UNIT : 1000.00 sqm
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.1 Maistry Day 0.50 141.50 70.75
2 Heavy mazdoor Day 2.00 132.00 264.00
3 Light mazdoor Day 1.00 130.50 130.50
Total Rs: 465.25
Contd
Description
Quantity Rate
in Rs.
Perticulars
in Rs.
PRELIMINARY & MAINTENANCE WORKS - DATA RATES
in Rs.
Quantity Rate
Description Quantity Rate
7
-
8/13/2019 Data Rates-P & M Works 1
8/20
DATA RATES- P AND M WORKS
C. LABOUR ( Contd ) :
Sl No Unit Amount
in Rs.
Contd
Add for small Tools and Plants @ 1% Rs: 4.65
Add for Contractor's Profit @ 10% Rs: 46.53
Add for hidden cost on Labour @ 15% Rs: 69.79
Add for Contractor's Overheads @ 5% Rs: 23.26
Total cost of Labour : Rs: 609.48
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 609.48
TOTAL Rs: 609.48
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 1000.00 sqm Rs: 609.48
Rate per sqm Rs: 0.60
Rate approved per sqm Rs: 0.60
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 1.b
ITEM: Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto
upto 300 mm / parthenium and other weeds including burning or disposing off the same as
directed etc., complete.
DATA:3 heavy and 2 light mazdoors can clear 1000 sqm thick jungle per day.
Consider 1000 sqm thick jungle clearance for data rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 0.5 No.
Heavy mazdoor : 3 Nos.
Light mazdoor : 2 Nos.
RATE ANALYSIS UNIT : 1000.00 sqm
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
Description
Perticulars
Quantity
Quantity Rate
in Rs.
Rate
in Rs.
8
-
8/13/2019 Data Rates-P & M Works 1
9/20
DATA RATES- P AND M WORKS
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 0.50 141.50 70.75
2 Heavy mazdoor Day 3.00 132.00 396.00
3 Light mazdoor Day 2.00 130.50 261.00
Total Rs: 727.75
Add for small Tools and Plants @ 1% Rs: 7.28
Add for Contractor's Profit @ 10% Rs: 72.78Add for hidden cost on Labour @ 15% Rs: 109.16
Add for Contractor's Overheads @ 5% Rs: 36.39
Total cost of Labour : Rs: 953.35
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 953.35
TOTAL Rs: 953.35
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 1000.00 sqm Rs: 953.35
Rate per sqm Rs: 0.95
Rate approved per sqm Rs: 0.95
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 2.a
ITEM: Removing stumps, tree roots, roots of bambooclusters etc., upto 1.50 m girth including
excavation, stacking the materials neatly and levelling the surface etc., complete with initial
lead upto 50 m and all lifts.
DATA:Av. diameter of root cluster for 0.30 to 1.5 m girth : 0.30 m
Consider 0.25 m extra excavation alround and 0.4 to 0.5 m depth for removal of stumps.
1 heavy mazdoor can remove 18 root clusters of girth 0.3 to 1.5 m girth per day @ 4 cum / day.
0.5 heavy and 0.5 light mazdoor can stack the removed material and level the area.
Consider removal of 36 Nos. tree stumps of 0.3 to 1.5 m girth & levelling area for rate analysis.
1. Requirement of materials :No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
Description Quantity Rate
in Rs.
in Rs.
Quantity RateDescription
9
-
8/13/2019 Data Rates-P & M Works 1
10/20
DATA RATES- P AND M WORKS
3. Requirement of workforce :
Maistry : 0.5 No.
Heavy mazdoor : 3 Nos.
Light mazdoor : 1 No.
RATE ANALYSIS UNIT : 36.00 Each
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.000.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 0.50 141.50 70.75
2 Heavy mazdoor Day 3.00 132.00 396.00
3 Light mazdoor Day 1.00 130.50 130.50
Total Rs: 597.25
Add for small Tools and Plants @ 1% Rs: 5.97
Add for Contractor's Profit @ 10% Rs: 59.73
Add for hidden cost on Labour @ 15% Rs: 89.59
Add for Contractor's Overheads @ 5% Rs: 29.86
Total cost of Labour : Rs: 782.40
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 782.40
TOTAL Rs: 782.40
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 36.00 Each Rs: 782.40Rate per Each Rs: 22.00
Rate approved per Each Rs: 22.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 2.b
Perticulars
Description
Description Rate
Quantity Rate
in Rs.
in Rs.
in Rs.
Quantity Rate
Quantity
10
-
8/13/2019 Data Rates-P & M Works 1
11/20
DATA RATES- P AND M WORKS
ITEM: Removing stumps, tree roots, roots of bamboocluster etc., with girth above 1.50 m and
upto 3.0 m including excavation, stacking the materials neatly and levelling the area etc.,
complete with initial lead upto 50 m and all lifts.
DATA:Av. diameter of root cluster for 1.50 to 3.0 m girth : 0.72 m
Consider 0.25 m extra excavation alround and 0.4 to 0.5 m depth for removal of stumps.
1 heavy mazdoor can remove 8 root clusters of girth 1.5 to 3.0 m girth per day @ 4 cum / day.
0.5 heavy and 0.5 light mazdoor can stack the removed material and level the area.
Consider removal of 16 Nos. tree stumps of 1.5 to 3 m girth & levelling area for rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 0.5 No.
Heavy mazdoor : 3 Nos.
Light mazdoor : 1 No.
RATE ANALYSIS UNIT : 16.00 EachA. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 0.50 141.50 70.75
2 Heavy mazdoor Day 3.00 132.00 396.00Contd
C. LABOUR ( Contd ) :
Sl No Unit Amount
Perticulars Quantity Rate
in Rs.
Quantity Rate
in Rs.
Quantity Rate
in Rs.
Description
Description
Description Quantity Rate
11
-
8/13/2019 Data Rates-P & M Works 1
12/20
DATA RATES- P AND M WORKS
in Rs.
Contd
3 Light mazdoor Day 1.00 130.50 130.50
Total Rs: 597.25
Add for small Tools and Plants @ 1% Rs: 5.97
Add for Contractor's Profit @ 10% Rs: 59.73
Add for hidden cost on Labour @ 15% Rs: 89.59
Add for Contractor's Overheads @ 5% Rs: 29.86
Total cost of Labour : Rs: 782.40
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 782.40
TOTAL Rs: 782.40
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 16.00 Each Rs: 782.40
Rate per Each Rs: 49.00
Rate approved per Each Rs: 49.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 2.c
ITEM: Removing stumps, tree roots, roots of bamboocluster etc., with girth above 3.0 m and upto
5.0 m including excavation, stacking the materials neatly and levelling the area etc., complete
with initial lead upto 50 m and all lifts.
DATA:Av. diameter of root cluster for 3.0 to 5.0 m girth : 1.3 m
Consider 0.25 m extra excavation alround and 0.4 to 0.5 m depth for removal of stumps.
2 heavy mazdoor can remove 5 root clusters of girth 3.0 to 5.0 m girth per day @ 4 cum / day.
1heavy and 1light mazdoor can stack the removed material and level the area.
Consider removal of 10 Nos. tree stumps of 3 to 5 m girth & levelling area for rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 1 No.
Heavy mazdoor : 6 Nos.
Light mazdoor : 2 Nos.
RATE ANALYSIS UNIT : 10.00 Each
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Contd
A. MATERIALS ( Contd ) :
Sl No Unit Amount
in Rs.
Perticulars
Perticulars
in Rs.
Quantity Rate
in Rs.
Quantity Rate
in Rs.
12
-
8/13/2019 Data Rates-P & M Works 1
13/20
DATA RATES- P AND M WORKS
Contd
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 1.00 141.50 141.502 Heavy mazdoor Day 6.00 132.00 792.00
3 Light mazdoor Day 2.00 130.50 261.00
Total Rs: 1194.50
Add for small Tools and Plants @ 1% Rs: 11.95
Add for Contractor's Profit @ 10% Rs: 119.45
Add for hidden cost on Labour @ 15% Rs: 179.18
Add for Contractor's Overheads @ 5% Rs: 59.73
Total cost of Labour : Rs: 1564.80
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1564.80
TOTAL Rs: 1564.80Add for enabling works @ 0.00% Rs: 0.00
Total cost for 10.00 Each Rs: 1564.80
Rate per Each Rs: 156.00
Rate approved per Each Rs: 156.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 2.c
Note:
ITEM: Additional rate for every 0.5 m increase in girth of tree stump / stumps of bamboo cluster
beyond 5 m.
DATA:Diameter of root cluster for 5.0 m girth : 1.59 m
Diameter of root cluster for 5.5 m girth : 1.75 m
Consider 0.25 m extra excavation alround and 0.4 to 0.5 m depth for removal of stumps.
Excavation for removal of 10 stumps of girth 5 m : 15.40 cum
Excavation for removal of 10 stumps of girth 5.5 m : 17.90 cum
Additional excavation involved for 10 Nos : 2.50 cum
Description
Description
Rate
Quantity Rate
Quantity
in Rs.
in Rs.
13
-
8/13/2019 Data Rates-P & M Works 1
14/20
DATA RATES- P AND M WORKS
Consider removal of 10 Nos. tree stumps for 0.5 m extra girth beyond 5 m & levelling area for
rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Increase in labour : Heavy mazdoor ( 2.5 x 1.5 / 4 ) : 0.93 No.
Light mazdoor ( 2.5 x 0.5 / 4 ) : 0.31 No.
Maistry ( 2.5 x 0.25 / 4 ) : 0.16 No.
RATE ANALYSIS UNIT : 10.00 Nos.
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 0.16 141.50 22.64
2 Heavy mazdoor Day 0.93 132.00 122.76
3 Light mazdoor Day 0.31 130.50 40.46
Total Rs: 185.86
Add for small Tools and Plants @ 1% Rs: 1.86
Add for Contractor's Profit @ 10% Rs: 18.59
Add for hidden cost on Labour @ 15% Rs: 27.88
Add for Contractor's Overheads @ 5% Rs: 9.29
Total cost of Labour : Rs: 243.47
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 243.47
TOTAL Rs: 243.47
Perticulars Quantity Rate
in Rs.
in Rs.
Quantity Rate
Rate
in Rs.
Quantity
Description
Description
14
-
8/13/2019 Data Rates-P & M Works 1
15/20
DATA RATES- P AND M WORKS
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 0.5 m increase in girth for 10 Nos. Rs: 243.47
Rate per 0.5 m increase in girth per Each Rs: 24.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 3
ITEM: Cutting and stacking bamboos excluding removing stumps and roots etc., complete with
initiallead upto 50 m and all lifts.
DATA:1 heavy mazdoor can cut and stack 30 bamboos per day.
Consider cutting and stacking 150 bamboos for rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 0.5 No.
Heavy mazdoor : 5 Nos.
RATE ANALYSIS UNIT : 150.00 Each
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 0.50 141.50 70.75
2 Heavy mazdoor Day 5.00 132.00 660.00
Total Rs: 730.75
Perticulars
Description
Description
in Rs.
Quantity Rate
Quantity Rate
Quantity Rate
in Rs.
in Rs.
15
-
8/13/2019 Data Rates-P & M Works 1
16/20
DATA RATES- P AND M WORKS
Add for small Tools and Plants @ 1% Rs: 7.31
Add for Contractor's Profit @ 10% Rs: 73.08
Add for hidden cost on Labour @ 15% Rs: 109.61
Add for Contractor's Overheads @ 5% Rs: 36.54
Total cost of Labour : Rs: 957.28
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 957.28
TOTAL Rs: 957.28
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 150.00 Each Rs: 957.28
Rate per Each Rs: 6.00
Rate approved per Each Rs: 6.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 4.a
ITEM: Cutting and removing jauliflorabushes upto 1.5 m girth excluding removal of stumps and
including burning or disposing off the materials as directed with initiallead upto 50 m and all
lifts.
DATA:2 heavy and 1 light mazdoors can clear 100 bushes of girth upto 1.5 m per day.
Consider cutting and stacking 100 jauliflora bushes for rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 0.5 No.
Heavy mazdoor : 2 Nos.
Light mazdoor : 1 No.
RATE ANALYSIS UNIT : 100.00 Each
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Perticulars
Rate
in Rs.
Quantity Rate
in Rs.
QuantityDescription
16
-
8/13/2019 Data Rates-P & M Works 1
17/20
DATA RATES- P AND M WORKS
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 0.50 141.50 70.75
2 Heavy mazdoor Day 2.00 132.00 264.00
3 Light mazdoor Day 1.00 130.50 130.50
Total Rs: 465.25
Add for small Tools and Plants @ 1% Rs: 4.65
Add for Contractor's Profit @ 10% Rs: 46.53
Add for hidden cost on Labour @ 15% Rs: 69.79
Add for Contractor's Overheads @ 5% Rs: 23.26
Total cost of Labour : Rs: 609.48
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 609.48TOTAL Rs: 609.48
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 100.00 Each Rs: 609.48
Rate per Each Rs: 6.00
Rate approved per Each Rs: 6.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 4.b
ITEM: Cutting and removing jauliflorabushes above 1.5 m upto 3.0 m girth excluding removal of
stumps and including burning or disposing off the materials as directed with initial lead upto
50 m and all lifts.
DATA:2 heavy and 1 light mazdoors can clear 50 bushes of girth 1.5 to 3.0 m per day.
Consider cutting and stacking 100 jauliflora bushes for rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 1 No.
Heavy mazdoor : 4 Nos.
Light mazdoor : 2 Nos.
RATE ANALYSIS UNIT : 100.00 Each
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
in Rs.
Quantity Rate
in Rs.
Quantity Rate
Description
Perticulars
17
-
8/13/2019 Data Rates-P & M Works 1
18/20
DATA RATES- P AND M WORKS
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 1.00 141.50 141.50
2 Heavy mazdoor Day 4.00 132.00 528.00
3 Light mazdoor Day 2.00 130.50 261.00Total Rs: 930.50
Add for small Tools and Plants @ 1% Rs: 9.31
Add for Contractor's Profit @ 10% Rs: 93.05
Add for hidden cost on Labour @ 15% Rs: 139.58
Add for Contractor's Overheads @ 5% Rs: 46.53
Total cost of Labour : Rs: 1218.96
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1218.96
TOTAL Rs: 1218.96
Add for enabling works @ 0.00% Rs: 0.00
Total cost for 100.00 Each Rs: 1218.96
Rate per Each Rs: 12.00
Rate approved per Each Rs: 12.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 5.a
ITEM: Cutting treesabove 0.3 m and upto 0.6 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
DATA:Av. Diameter of tree for 0.3 to 0.6 m girth : 0.15 m2 heavy mazdoors can cut 14 trees of girth 0.3 to 0.6 m per day.
1 heavy mazdoor for cutting branches, collecting and stacking cut wood.
Consider cutting and stacking 14 trees of girth 0.3 to 0.6 m for rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Description
Description
Quantity
in Rs.
Rate
in Rs.
Quantity Rate
18
-
8/13/2019 Data Rates-P & M Works 1
19/20
DATA RATES- P AND M WORKS
Maistry : 0.25 No.
Heavy mazdoor : 3 Nos.
RATE ANALYSIS UNIT : 14.00 Each
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Use rate of ropes etc LS 0.25 30.00 7.50
0.00 0.00 0.00
Total Rs: 7.50
Add for small Tools and Plants @ 1% Rs: 0.08
Add for Contractor's Profit @ 10% Rs: 0.75
Add for Contractor's Overheads @ 5% Rs: 0.38
Total cost of Materials : Rs: 8.70
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Maistry Day 0.25 141.50 35.38
2 Heavy mazdoor Day 3.00 132.00 396.00
Total Rs: 431.38
Add for small Tools and Plants @ 1% Rs: 4.31
Add for Contractor's Profit @ 10% Rs: 43.14
Add for hidden cost on Labour @ 15% Rs: 64.71
Add for Contractor's Overheads @ 5% Rs: 21.57
Total cost of Labour : Rs: 565.10
ABSTRACT:
A. Cost of Materials Rs: 8.70
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 565.10
TOTAL Rs: 573.80Add for enabling works @ 0.00% Rs: 0.00
Total cost for 14.00 Each Rs: 573.80
Rate per Each Rs: 41.00
Rate approved per Each Rs: 41.00
SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11 ITEM No: 5.b
ITEM: Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps and including
Perticulars
Description
Description
Quantity Rate
in Rs.
Quantity Rate
in Rs.
Quantity Rate
in Rs.
19
-
8/13/2019 Data Rates-P & M Works 1
20/20
DATA RATES- P AND M WORKS
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
DATA:Av. Diameter of tree for 0.6 to 1.2 m girth : 0.3 m
2 heavy mazdoors can cut 4 trees of girth 0.6 to 1.2 m per day.
1 heavy mazdoor for cutting branches, collecting and stacking cut wood.
Consider cutting and stacking 4 trees of girth 0.6 to 1.2 m for rate analysis.
1. Requirement of materials :
No materials required for the work.
2. Requirement of machinery :
No machinery proposed for the work.
3. Requirement of workforce :
Maistry : 0.25 No.
Heavy mazdoor : 3 Nos.
RATE ANALYSIS UNIT : 4.00 Each
A. MATERIALS:
Sl No Unit Amount
in Rs.1 Use rate of ropes etc LS 0.25 30.00 7.50
0.00 0.00 0.00
Total Rs: 7.50
Add for small Tools and Plants @ 1% Rs: 0.08
Add for Contractor's Profit @ 10% Rs: 0.75
Add for Contractor's Overheads @ 5% Rs: 0.38
Total cost of Materials : Rs: 8.70
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.1 Maistry Day 0.25 141.50 35.38
2 Heavy mazdoor Day 3.00 132.00 396.00
Total Rs: 431.38
Add for small Tools and Plants @ 1% Rs: 4.31
Add for Contractor's Profit @ 10% Rs: 43.14
Add for hidden cost on Labour @ 15% Rs: 64.71
Add for Contractor's Overheads @ 5% Rs: 21.57
Total cost of Labour : Rs: 565.10
Perticulars
Description
Description Quantity Rate
in Rs.
in Rs.
in Rs.
Quantity Rate
Quantity Rate