Page 1: DCPL Reply-22-9-12-B1. 1x800 Wanakbori TPS Pre-Bid Clarf Unit€¦ · by EPC contactor but safety precaution is necessary so that adjoining structure may not get damaged. (8) As far

ATTACHMENT-1

1X 700 MW BELLARY-3 SUPERCRITICAL TPS – EPC – Pre Bid Clarf_date 9

Page 2: DCPL Reply-22-9-12-B1. 1x800 Wanakbori TPS Pre-Bid Clarf Unit€¦ · by EPC contactor but safety precaution is necessary so that adjoining structure may not get damaged. (8) As far
Page 3: DCPL Reply-22-9-12-B1. 1x800 Wanakbori TPS Pre-Bid Clarf Unit€¦ · by EPC contactor but safety precaution is necessary so that adjoining structure may not get damaged. (8) As far
Page 4: DCPL Reply-22-9-12-B1. 1x800 Wanakbori TPS Pre-Bid Clarf Unit€¦ · by EPC contactor but safety precaution is necessary so that adjoining structure may not get damaged. (8) As far
Page 5: DCPL Reply-22-9-12-B1. 1x800 Wanakbori TPS Pre-Bid Clarf Unit€¦ · by EPC contactor but safety precaution is necessary so that adjoining structure may not get damaged. (8) As far