Deck Jet Model WFJ500 PAK 4
ISWFJ100 REV B
Plumbing Layout
A = B = C = D A ≠ B ≠ C ≠ D
Ball Valve
Valve for flow control
Pool
!
!
!
!
1
2
3
4
Number of Deck Jets in System
Main Feed Pipe Size (inches)
Flow Loop Pipe (inches)
Individual Deck Jet Feeds (inches)
1 - 5
1 - 1/2
1
3/4
6 - 10
2
1 - 1/2
3/4
Recommended Plumbing Size*
*See plumbing layout for example flow loop
Wall Returns, Bypass, other features, etc.
This product should be installed and serviced by a qualified pool professional. Improper installation or operation will void the warranty.
For best results with multiple deck jets, plumb using an equal flow loop or variation thereof. Maintain symmetry and consistency between deck jet feedlines in multiple jet systems. Build feed lines of equal length using the same number of joints and fittings.
The Hayward Deck Jet 500 is designed for a maximum flow rate of 5gpm at 10.7ft of head.
Nozzle adjustment will not shut off flow to Deck Jet. See table for range of adjustment.
1
2
3
4
60
80
3
4
5
3
4
5
2.3
3.1
3.9
2.9
3.9
4.8
4.0
6.4
9.6
1.8
2.4
3.0
2.6
4.0
5.6
1.3
2.3
2.9
3.7
5.2
6.9
4.2
5.8
8.2
3.0
3.9
4.9
3.9
5.3
7.3
4.3
6.3
8.4
4.3
6.3
8.4
4.5
6.8
8.9
4.3
6.4
8.5
Flow Rate(GPM)
X(ft)
Y(ft)
Head Loss(ft of head)
Max Open
Min Open
Max Open
Min Open
Max Open
Min Open
Max Open
Min Open
α(deg)
Remove nozzle and insert sealing ball.
Remove sealing ball and insert nozzle.
Keep cap flush with deck.
WFXJ 500 CPAK4Cover - 4 Pack
WFXJ 500 KITNozzle and retainer kit(Includes winterizing ball)
Twist nozzleto adjust flow.
Pull tabs(inwards)to remove.(6 Places)
Do not blockbottom ofhousing withconcrete.
Finish deck to top ofrubber cap.
TEST
Cut pipe 2 5/8” from deck surface.
3/4” supply pipe<50 PSI MAX<3.5 BAR MAX
Housingdesignedto drainunder deck.
WINTERIZING
Replacement Parts
OPERATION
Align arrows. Rotate 3x’s to adjust cap flush with deck.
PVC Cement on Feed Pipe ONLY
1
4 5 6
7 8 9
10 11 12
2 3