Development Requirement/Tools Brown Bag Luncheon Series
Site Due Diligence
Jarrod Likar and Tim McDonough
![Page 2: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/2.jpg)
SITE SELECTION
• Terrain/Location• Roads • Drainage• Water/
Wastewater• Private Utilities
![Page 3: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/3.jpg)
TERRAIN/LOCATION
• Environmental Clearance
• Specific Area Plans • Arroyos/LEE Lines
![Page 4: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/4.jpg)
Environmental Site Assessment
Defined by 3 Phases• Phase 1 – Site and Document Review (Arch – Bio)• Phase 2 – Site Investigation
(Testing)• Phase 3 – Remediation
![Page 5: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/5.jpg)
Environmental Clearance
![Page 6: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/6.jpg)
Specific Area Plan
![Page 7: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/7.jpg)
Arroyos/LEE Lines
![Page 8: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/8.jpg)
ROADS• Survey the area• Long Range Plan
– MRCOG/MPO• Adequate for intended use?
– Volume / Size / Access Control• Owner
– City, County, NMDOT• TIA (Traffic Impact Analysis)
![Page 9: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/9.jpg)
Specific Area Plan
![Page 10: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/10.jpg)
ROADS• Survey the area• Long Range Plan
– MRCOG/MPO• Adequate for intended use?
– Volume / Size / Access Control• Owner
– City, County, NMDOT• TIA (Traffic Impact Analysis)
![Page 11: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/11.jpg)
TRAFFIC IMPACT ANALYSIS
• Always required by the City• Estimates volumes and timing of
new traffic• Recommends improvements to meet
traffic conditions– Signals, Additional lanes, Access
limitations • Based on existing projections and
intended future use
![Page 12: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/12.jpg)
![Page 13: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/13.jpg)
DRAINAGE
• Historic vs. Developed• On-Site vs. Off-Site• A significant issue for most large
sites• Must allow off-site flows through site• Often limited to Historic Flows• Based on 100 year event (1%)
![Page 14: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/14.jpg)
DRAINAGE
• Storm Sewers??• Arroyos??
– COE 404 Permit– CLOMR/LOMR
• On-Site Ponding/Regional– Detention / Retention
• Percolation/Evaporation/Transpiration
![Page 15: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/15.jpg)
![Page 16: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/16.jpg)
![Page 17: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/17.jpg)
DRAINAGE
• Watershed Management Plans
• Facility Plans • Drainage Management Plans• Individual Grading and
Drainage Plans
![Page 18: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/18.jpg)
WATERSHED MANAGEMENT PLANS
• Venada WMP• Montoyas WMP
– Lomitas Negras WMP
• La Barranca WMP• Black WMP• Calabacillas WMP (Pending)
![Page 19: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/19.jpg)
![Page 20: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/20.jpg)
FACILITY PLANS
![Page 21: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/21.jpg)
DRAINAGE MANAGEMENT PLAN
![Page 22: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/22.jpg)
INDIVIDUAL GRADING AND DRAINAGE PLAN
![Page 23: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/23.jpg)
WATER
• Flow / Pressure /Volume– Flow – Pipe Size– Pressure – Elevation– Volume – Storage/Production
• Fire Protection
• Statement of W & WW Availability– Hydraulic model
• Off-Site Improvements
![Page 24: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/24.jpg)
WASTEWATER
• Collection & Treatment– Collection – Pipe Size– Treatment – Capacity of Treatment
Facility
• Pretreatment Requirements• Off-site Improvements
![Page 25: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/25.jpg)
ELECTRICITY - PNM• Where is access?
– Transmission / Distribution
• Requirements– Voltage / Phase / KVA
• Required Upgrades– Transformers / Substation – Offsite access & Easements
• All Distribution Lines Underground
![Page 26: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/26.jpg)
NATURAL GAS - NMGCo
• Where is access?– Transmission / Distribution
• Requirements– Volume
• Required Upgrades– Pressure Reducing Station – Offsite access & Easements
![Page 27: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/27.jpg)
COMMUNICATIONSQWEST – CABLE ONE
• Where is access?• Requirements• Required Upgrades• Options
![Page 28: Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough](https://reader036.vdocument.in/reader036/viewer/2022062806/56649eb45503460f94bbc4d7/html5/thumbnails/28.jpg)
REQUEST A DESIGN REVIEW COMMITTEE MEETING
• All Departments / Utilities are represented