Diaphragm Wall(Strip Piles)Ahmed Osama KhattabAhmed Osama Khattab
Ahmed Hussien MoharramAhmed Hussien MoharramMohamed Hatem ShamsMohamed Hatem ShamsMohamed Osama AminMohamed Osama Amin
Mohamed Yousry MohamedMohamed Yousry Mohamed
![Page 2: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/2.jpg)
ContentsContents• Introduction to the sitesIntroduction to the sites• Problems faced.Problems faced.• Sequence of Construction.Sequence of Construction.– Diaphragm wall construction.Diaphragm wall construction.– Soil injection (plugging).Soil injection (plugging).– Excavation and Dewatering.Excavation and Dewatering.– Slab Construction.Slab Construction.
![Page 3: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/3.jpg)
Introduction to The Sites
![Page 4: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/4.jpg)
The SitesThe two sites we covered are:The two sites we covered are:• The Ventilator in Khalifa El-Maamoun The Ventilator in Khalifa El-Maamoun
Street (Diaphragm Wall work was Street (Diaphragm Wall work was done)done)
• The Station in Marghany Street The Station in Marghany Street (Diaphragm Walls are under (Diaphragm Walls are under construction)construction)
![Page 5: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/5.jpg)
Ventilator Plans
![Page 6: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/6.jpg)
Problems
![Page 7: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/7.jpg)
Problems• Very deep construction (up to 35 m in Very deep construction (up to 35 m in
depth)depth)• High water table (3 m below ground High water table (3 m below ground
level)level)• Connecting the slabs’ reinforcement Connecting the slabs’ reinforcement
to the smooth diaphragm wallsto the smooth diaphragm walls• Slab construction sequence:Slab construction sequence:• Bottom to topBottom to top• Top to bottomTop to bottom
![Page 8: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/8.jpg)
Building Sequence
![Page 9: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/9.jpg)
• Diaphragm wall constructionDiaphragm wall construction• InjectionInjection• Excavation and dewateringExcavation and dewatering• Slab constructionSlab construction
Construction Sequence
![Page 10: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/10.jpg)
Equipment:
Diaphragm Wall Construction
![Page 11: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/11.jpg)
The HydrofraiseThe Hydrofraise• The hydrofraise is used to dig deep The hydrofraise is used to dig deep
rectangular wallsrectangular walls• The Hydrofraise suspends the The Hydrofraise suspends the
excavated soil into the bentonite slurryexcavated soil into the bentonite slurry• The boring is guided by the guide wallsThe boring is guided by the guide walls• Dimensions range from (2.1*0.6) to Dimensions range from (2.1*0.6) to
(2.1*2.1)m(2.1*2.1)m
Diaphragm Wall Construction
![Page 12: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/12.jpg)
The HydrofraiseThe Hydrofraise
Diaphragm Wall Construction
![Page 13: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/13.jpg)
The HydrofraiseThe Hydrofraise
Diaphragm Wall Construction
![Page 14: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/14.jpg)
The De-sanderThe De-sander• The de-sander separates the excavated The de-sander separates the excavated
soil from the bentonite slurry soil from the bentonite slurry• The slurry fit for recirculation is The slurry fit for recirculation is
reused, the polluted slurry is stored in reused, the polluted slurry is stored in the dumping silosthe dumping silos
• Excavation product is separated to be Excavation product is separated to be carried away on dump truckscarried away on dump trucks
Diaphragm Wall Construction
![Page 15: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/15.jpg)
The De-sanderThe De-sander
Diaphragm Wall Construction
![Page 16: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/16.jpg)
The De-sanderThe De-sander
Diaphragm Wall Construction
![Page 17: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/17.jpg)
Diaphragm Wall Construction
![Page 18: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/18.jpg)
Another System:
Diaphragm Wall Construction
![Page 19: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/19.jpg)
The Process:
Diaphragm Wall Construction
![Page 20: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/20.jpg)
• Construction of Guide WallsConstruction of Guide Walls• Bore the primary wallsBore the primary walls• Dropping the Steel CageDropping the Steel Cage• Pouring the Primary WallsPouring the Primary Walls• Repeat with Secondary WallsRepeat with Secondary Walls
Diaphragm Wall Construction
![Page 21: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/21.jpg)
Construction of Guide WallsConstruction of Guide Walls
Diaphragm Wall Construction
![Page 22: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/22.jpg)
Diaphragm Wall Construction
![Page 23: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/23.jpg)
P-7
P-1P-3
P-5
P-9
P-11
P-13
S-8
S-2
S-4
S-6
S-10
S-12
S-14
Diaphragm Wall Construction
![Page 24: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/24.jpg)
P-7
P-1P-3
P-5
P-9P-11
P-13
S-8
S-2S-4
S-6
S-10S-12
S-14
Diaphragm Wall Construction
![Page 25: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/25.jpg)
Injection (Plugging)• To overcome the GWT problem, a To overcome the GWT problem, a
grout/gel plug should be injected to grout/gel plug should be injected to seal the bottom before excavation seal the bottom before excavation and dewatering startsand dewatering starts
• The plug can be permanent (grout)The plug can be permanent (grout)• Or temporary (gel) until the raft level Or temporary (gel) until the raft level
is reached, then a permanent raft is is reached, then a permanent raft is constructedconstructed
![Page 26: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/26.jpg)
Excavation and Dewatering• After the construction domain is After the construction domain is
sealed, excavation can start for the sealed, excavation can start for the remaining activities to proceedremaining activities to proceed
• During the excavation, the water During the excavation, the water must be drainedmust be drained
![Page 27: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/27.jpg)
Injection Excavation and Dewatering
![Page 28: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/28.jpg)
Slabs
• The final stage in finishing the The final stage in finishing the ventilator is casting the slabs.ventilator is casting the slabs.
• Slabs are cast from top to bottom Slabs are cast from top to bottom unlike the usual sequence.unlike the usual sequence.
![Page 29: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/29.jpg)
Slabs• Locations of the slabs are determined Locations of the slabs are determined
before the reinforcement cage is before the reinforcement cage is prepared.prepared.
• Slab reinforcement is placed in the cage Slab reinforcement is placed in the cage and ended with the mechanical spliceand ended with the mechanical splice
• The mechanical splices are protected The mechanical splices are protected from the concrete using foamfrom the concrete using foam
• When casting the slab, the splices are When casting the slab, the splices are located and exposed to be connected to located and exposed to be connected to the diaphragm wall.the diaphragm wall.
![Page 30: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/30.jpg)
Slabs
![Page 31: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/31.jpg)
Slabs
![Page 32: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/32.jpg)
Slabs• And then the steel is connected via And then the steel is connected via
the mechanical splice.the mechanical splice.• Concrete is cast.Concrete is cast.• A vertical shaft is made to allow A vertical shaft is made to allow
working in the lower floorsworking in the lower floors
![Page 33: Diaphragm Wall](https://reader033.vdocument.in/reader033/viewer/2022052202/543d6a89b1af9f390a8b4827/html5/thumbnails/33.jpg)
Slabs• The level under construction is The level under construction is
accessed using the floors cast aboveaccessed using the floors cast above• Pouring and excavation equipment Pouring and excavation equipment
are kept on the ground level.are kept on the ground level.• Access to the floor under Access to the floor under
construction is through the working construction is through the working shaftshaft