Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Directorate of Economics and Statistics
Planning Department, Government of Maharashtra
Limited tender for conducting evaluation study of
Rashtriya Krishi Vikas Yojna implemented by Agriculture Department,
GoM
Tender Notification No. EVL/1117/RKVY/502
Refer to RFP No. 1. OAP/1116/EVL/277 dated 09th May 2016
2. OAP/1116/EVL/679 dated 23rd December 2016
Issued By
The Director
Directorate of Economics & Statistics
Administrative Bldg., 8th floor, Govt. Colony,
Bandra (E), Mumbai 400 051
Ph. No. 022-26400053 / 26400178
Fax No. 022-26559492
E-Mail: [email protected]
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 1 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Table of Contents
PART I
Part I ........................................................................................................................................................................................ 4
Glossary ................................................................................................................................................................................... 4
Invitation for Proposal ............................................................................................................................................................. 5
Important Information ............................................................................................................................................................. 6
Scope of work .......................................................................................................................................................................... 7
Expected broad procedure to be followed by successful bidder and expected deliverables .................................................... 9
1. Purpose of Bid Document .................................................................................................................................................................. 11
2. Cost of Bid Document .................................................................................................................................................................. 11
3. Completeness of Bid Document ................................................................................................................................................... 11
4. Proposal Preparation Cost ............................................................................................................................................................ 11
5. Period of Validity of Bids ............................................................................................................................................................. 11
6. Pre-Bid Meeting ........................................................................................................................................................................... 11
7. Amendments to Bid Document .................................................................................................................................................... 12
8. Rights to Terminate the Process ................................................................................................................................................... 12
9. Site Visit/Field visit ...................................................................................................................................................................... 12
10. Language of Bid ........................................................................................................................................................................... 13
11. Bid Submission Format ................................................................................................................................................................ 13
12. Documents Comprising of Bid ..................................................................................................................................................... 13
13. Earnest Money Deposit (EMD) and refund for Group I – Category A1 ....................................................................................... 14
14. Submissions of Bid ....................................................................................................................................................................... 14
15. Opening of Bid ............................................................................................................................................................................. 15
16. Opening of Commercial Bid ......................................................................................................................................................... 15
17. Evaluation Process ....................................................................................................................................................................... 15
18. Award Criteria .............................................................................................................................................................................. 18
19. Clarification of Bid ....................................................................................................................................................................... 20
20. Non-Material Non-Conformities .................................................................................................................................................. 20
21. Stamp Duty ................................................................................................................................................................................... 20
22. Signing of Contract ...................................................................................................................................................................... 20
Terms and Conditions of contract ......................................................................................................................................... 20
1. Eligibility ........................................................................................................................................................................................... 20
2. Terms and Conditions ........................................................................................................................................................................ 21
3. Performance Bank Guarantee ............................................................................................................................................................. 21
4. Payment Terms .................................................................................................................................................................................. 21
5. Penalty (Please see Expected broad procedure (ii))............................................................................................................................ 22
6. Indemnity ........................................................................................................................................................................................... 22
7. Force Majeure .................................................................................................................................................................................... 22
8. Termination of contract ...................................................................................................................................................................... 22
9. Rights to Accept/Reject any or all proposals ...................................................................................................................................... 23
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 2 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
10. Fraud and Corruption ....................................................................................................................................................................... 23
Part II – Annexures ................................................................................................................................................................ 25
Annexure A: Bid Cover Letter ............................................................................................................................................................... 25
Annexure B: Format to share Bidder’s particulars and contact person’s details .................................................................................... 27
Annexure C: Authorisation letter for attending pre-bid meeting ............................................................................................................ 28
Annexure D: Format for CV of 3 key staff members proposed ............................................................................................................. 29
Annexure E: Draft Format for activity wise work plan .......................................................................................................................... 30
Annexure F: Brief understanding of Rashtriya Krishi Vikas Yojna ....................................................................................................... 31
Annexure G: Proposed methodology for evaluation study of Rashtriya Krishi Vikas Yojna ................................................................. 31
Annexure H: Format for Price Schedule ................................................................................................................................................ 32
Annexure I: Performance Bank Guarantee ............................................................................................................................................. 33
Annexure J: A. Draft Contract Form (CF) with Group I Category A1 empanelled agencies on Stamp Paper of `100 .......................... 36
Annexure K: Check-list for the documents to be included ..................................................................................................................... 42
Annexure L: Organisation Structure, Government Resolution ............................................................................................................... 43
Annexure M: Scheme Related Information ............................................................................................................................................ 52
Annexure N: Projects/schemes details ................................................................................................................................................... 54
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 3 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Part I
Glossary
Term Meaning
BG Bank Guarantee
EDP Electronic Data Processing
EMD Earnest Money Deposit
GoM Government of Maharashtra
LoI Letter of Intent
NDA Non-Disclosure Agreement
PBG Performance Bank Guarantee
RFP Request for Proposal
ISO International Organization for Standardization
PQ Pre-Qualification
Government Government of India or GoM
GoI Government of India
DES Directorate of Economics and Statistics, Planning Department, GoM
Bidder Entity which will respond to this limited bid
Government
Agencies
Government entities which will assign actual work to empanelled
vendors
Empanelled
Vendors
Agency/organisation which has been empanelled in the respective
categories mentioned in the Government resolution of Planning Dept.,
GoM, dated 22/07/2016 and 26thSeptember, 2017.
Raw data Raw data is a primary data collected from survey and data entered in
electronic format for all field
Final data
Final data (in electronic format) is a primary data collected from
survey, which is scrutinised, validated and cleaned by removing
outliers, data entry errors, etc. and ready to use for further data
processing & tabulation
Contract
Value
Price payable to the successful bidder under the contract for the full
and satisfactory performance of the contractual obligation
Committee Tender Evaluation Committee
RKVY Rashtriya Krishi Vikas Yojna
Approach
Note
A brief note about
i. Scheme: Introduction, Objectives, Nature, Criteria, Scope,
Implementing agencies and targets & achievements (physical
& financial) of the scheme.
ii. Evaluation of scheme: Objectives of evaluation of the scheme,
sample size, methodology & for whom schedules are to be
designed.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 4 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Invitation for Proposal
Limited Tender Notice
LIMITED TENDER NOTICE
Directorate of Economics & Statistics
Planning Department
Government of Maharashtra, Mumbai
The Directorate of Economics & Statistics, Planning Department, GoM invites Limited tender for
conducting evaluation study of Rashtriya Krishi Vikas Yojna implemented by Agriculture
Department, GoM through e-tender from Group I-category A1 & Group II-category A2
organisations/institutions empanelled vide Planning Department’s, Government Resolution, dated 22nd
July, 2016,26th September, 2017 and 27th September, 2017. The e-tender document is available from 9th
July , 2018 on website https://mahatenders.gov.in. (Tender reference No. EVL/1117/RKVY/502 ). Last
date of online submission of this tender is 23rd July, 2018 up to 16.30 Hrs..
-Sd-
Dated : 5th July, 2018 Director
Directorate of Economics & Statistics,
Govt. of Maharashtra, Mumbai
Bidders are advised to study this limited tender document carefully before submitting their proposals
in response to the Limited Tender Notice. Submission of a proposal in response to this notice shall be
deemed to have been done after careful study and examination of this document (and clarification/
corrigendum issued subsequently, if any) with full understanding of its terms, conditions and
implications.
This Tender document is not transferable.
RFP reference No. OAP/1116/EVL/277 for empanelment dated 9th May, 2016 and RFP reference No.
OAP/1116/EVL/679 for empanelment dated 23rd December, 2016 is the base document for this tender
process including all terms, conditions and guidelines set forth.
Bidders are advised to go through the Planning Department-
1. Government Resolution No.वियोम-ू1998/प्र.क्र.6/का-1413, dated30th September, 1998
2. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 22nd July, 2016
3. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 21stNovember, 2016
4. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 26th September, 2017
5. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 27th September, 2017
6. Government Resolution No. मुमाअ1016/प्र.क्र.78/का-1417, dated 4th April,2018
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 5 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Important Information
# Information Details
1. Project Name To conduct evaluation study of Rashtriya Krishi Vikas
Yojna implemented by Agriculture Department, GoM
2. Limited Tender document reference No EVL/1117/RKVY/502
Date : 5th July, 2018
3. Limited Tender Fee (Non-refundable)
INR 1,000/- (Rupees One Thousand only)
To be submitted online at https://mahatenders.gov.in
(Bidders from Group II Category A2 are exempted for submitting Tender fee and EMD)
4. Earnest Money Deposit (Refundable)
INR 10,000/- (Rupees Ten Thousand only)
To be submitted online at https://mahatenders.gov.in
(Bidders from Group II Category A2 are exempted for submitting Tender fee and EMD)
5. Bid Validity Period 180 Days
6. Performance Bank Guarantee 10 % of the Contract Value
7. Performance Security Validity Period 6 months after expiration of all the Contractual Obligations
8. Availability of Tender Document 9th July, 2018 from 11.00 Hrs
9. Last date for submission of queries for
clarifications via email Up to 13th July, 2018 till 13.00 Hrs
10. Date, Time & Place of pre-bid meeting
Date- 16th July, 2018
Time - 14.00 Hrs
Place - Directorate of Economics and Statistics, 4th floor, EDP
Centre, New Admin bldg, Opposite Mantralaya, Madam kama
road, Mumbai-400032, Maharashtra
11. Last date (deadline) for uploading the bid
on e-Tendering website
Up to 23rd July, 2018 till 16.30 Hrs
at https://mahatenders.gov.in
12.
Date of online opening of Technical
Proposals received in response to the
Limited Tender Notice
On 25th July, 2018 at 14.00 Hrs.
13.
Place, Time and Date of opening of
Commercial proposals received in
response to the Limited Tender Notice
To be informed later to the shortlisted bidders
14. Contact person for queries
Mr. Vijay Aher
Additional Director (Evaluation)
Ph.: 022 22797006/09/00, 22021614
15. Email ID, Phone No: Email Id: [email protected]
Ph.: 022 22797006/09/00, 22021614
16. Submission Type e-tendering system
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 6 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Scope of work
The Directorate of Economics and Statistics (DES) desires to conduct an evaluation study of
“Rashtriya Krishi Vikas Yojna” implemented by Agriculture Department, GoM. The limited tenders
are called from Group I-category A1 & Group II-category A2 as specified in Planning Department,
GoM Government Resolution No. मुमाअ/1016/प्र.क्र. 78/का-1417, dated 22ndJuly, 2016, 26th September,
2017, 27th September, 2017 and 4th April, 2018.
At least one project per year (from 2012-13 to 2016-17) from infrastructure & Production
growth of each department/ Implementing agency as applicable is to be selected which should not be
repeated for another year with adequate number of beneficiaries. Summary of Department / Year wise
project under RKVY is attached herewith in Annexure M which will help in selection of projects for
evaluation.
The beneficiary sample should be representative and balanced. Block, district level and State
level concerned functionaries should also be contacted/interviewed.
Overview of the Scheme:-
Rashtriya Krishi Vikas Yojna is a special Additional Central Assistance Scheme which was
launched in August, 2007 to orient agricultural development strategies, to reaffirm its commitment to
achieve 4 per cent annual growth in the agricultural sector during the 11th plan. The scheme was
launched to incentivize the States to provide additional resources in their State Plans over and above
their baseline expenditure to bridge critical gaps.
The RKVY covers all sectors such as Crop Cultivation, Horticulture, Animal Husbandry and
Fisheries, Dairy Development, Agricultural Research and Education, Plantation and Agricultural
Marketing, Food Storage and Warehousing, Soil and Water Conservation, other Agricultural
Programmes and Cooperation.
The scheme requires the States to prepare District and State Agriculture Plans. States will be
eligible for receiving RKVY funds only if the baseline share of expenditure of the Agriculture and
allied sectors in its total State Plan (excluding RKVY fund) is at least maintained and the District
Agriculture Plan and State Agriculture Plan have been formulated by the State Government.
Objectives of RKVY
The main objectives of the RKVY Scheme are as follows.
To incentivize the states so as to increase public investment in agriculture and allied
sectors.
To provide flexibility and autonomy to states in the process of planning and executing
agriculture and allied sector schemes.
To ensure the preparation of agriculture plans for the districts and the states based on agro
climatic conditions, availability of technology and natural resources.
To ensure that the local needs/crops/priorities are better reflected in the agricultural plans
of the states.
To achieve the goal of reducing the yield gaps in important crops, through focused
interventions.
To maximize returns to the farmers in agriculture and allied sectors.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 7 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
To bring about quantifiable changes in the production and productivity of various
components of agriculture and allied sectors by addressing them in a holistic manner.
Area of focus under RKVY
Production Growth
a. Integrated development of major food crops such as wheat, paddy, coarse cereals, minor
millets, pulses, oilseeds
b. Agriculture mechanization
c. Activities related to enhancement of soil health.
d. Development of rain fed farming systems in and outside watershed areas
e. Integrated Pest Management
f. Promoting extension services
g. Activities relating to enhancement of horticultural production
h. Animal husbandry and fisheries development activities
i. Study tours of farmers
j. Organic and bio-fertilizers
k. Sericulture
Infrastructure & Assets
a. Horticulture (Nurseries, Plastic/RCC lining etc.)
b. Natural Resources Management (Soil & Water conservation activities, Reclamation of
problems Soils etc.)
c. Pest Management & Pesticide quality control (State Pesticide Testing Labs, Bio-pesticide
Testing Labs etc.)
d. Soil Nutrient Management, Fertilizers, Bio Fertilizers/Organic Farming (Setting up of new soil
testing laboratories, Setting up of new fertilizer Quality Control laboratories, Bio fertilizer
production units etc.)
e. Animal Husbandry, Dairy, Fisheries (Breeding farms, Strengthening /expansion of cold storage
facility for milk and milk product, cold storage& Ice Plants etc.)
f. Marketing and Post-Harvest (Fruits & Vegetable Markets/Distribution Centres, packing etc.)
g. Seeds (Seed Testing Labs, Storage Godowns etc.)
h. Agriculture Mechanization (Agriculture Machines Testing Centers)
i. Agricultural Extension (Kissan Call Centres, Knowledge /Technology Resources Centres etc.)
j. Agriculture Research (Research Infrastructure)
k. Minor/Micro Irrigation (Shallow Well & Dug Wells, Farm Ponds etc.)
Objectives of evaluation Study
It is essential to evaluate and measure the extent to which the programme and approach has
stood up to the expectations. The study enlightens the policy makers to incorporate necessary
corrections to make the programme more effective and successful. The study intends to achieve the
following specific evaluation objectives listed below:
1. To study the socio-economic profile of farmers participated/benefited in RKVY.
2. Analysis of direct and indirect impact on project beneficiaries and on increasing Production
and Productivity.
3. To assess the impact of RKVY on input use, production, income and employment among the
beneficiary including farmers in Maharashtra.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 8 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
4. To identify factors influencing the adoption of major interventions/ initiative under RKVY.
5. To identify the constraints hindering the performance of this scheme in Maharashtra.
6. To study scheme designs for consistency, feasibility, effectiveness and adequacy with respect
to the goals and objectives.
7. To evaluate physical and financial progress of the scheme since last five years.
8. To evaluate whether works carried under various developmental schemes are according to
Government policy and also to evaluate whether various items/equipments, implements,
medicines and seeds/various livestock provided under personal benefit schemes are according
to projects.
9. To find out the problems and difficulties in implementing the scheme.
10. To evaluate periodically monitoring & review of the scheme at all concerned offices from
Mantralaya to root level.
11. To find out whether scheme is implemented in accordance with guidelines of RKVY.
12. To find out whether any reforms/measures/initiatives for better implementation and fulfilment
of the purpose of scheme for which it has been initiated are being taken from time to time by
respective department for similar projects.
13. To study whether any policy which has been adopted by the department after successful
implementation of any project.
14. Contribution of private partner in financial and personal terms.
15. To study whether the project is continued after completion.
These are minimum objectives of this evaluation study to be accomplished. The successful
bidder may extend the scope beyond these objectives which will be appreciated by DES.
The results of the study will provide useful insights on the impacts of the RKVY on farming
communities and can suggest policy recommendations for improving the efficacy of the program. It is
also expected that this study will provide valuable insights into various factors influencing the decision
of the farmers on adoption of recommended package of good agricultural practices for increasing
production and productivity of selected crops. This may help the policy planning authorities to
consider making suitable changes in the development and implementation of policy on promotion of
agriculture sector in general and the identified crops in particular, in the Maharashtra.
Expected broad procedure to be followed by successful bidder and expected deliverables
The successful bidder would be required to carry out the evaluation study of Rashtriya Krishi
Vikas Yojna in the State, covering following components: -
(i) To formulate evaluation study implementation procedure
(ii) Whenever secondary data is required issue a letter to concerned authorities/officer’s to acquire the
required information/data, by giving specified time period (maximum one month) for this evaluation
study. In case of non-response for getting required information/data of the scheme after one week of
the specified time/period, this fact should be communicated to the officers of the higher authorities
and DES as well at each stage. Or else, ‘Penalty’ clause of this tender document will be applicable.
(iii) To design schedules for conducting evaluation study
(iv) To determine coverage in terms of geography, population frame, etc. for canvassing schedules and
sampling procedure
*(Component (i) to (iii) should be submitted to DES for approval)
(v) To conduct pilot study for schedule testing
(vi) Rectification of schedules on the basis of pilot survey
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 9 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
(vii) To prepare Instruction Manual for conducting field work
(viii) To impart training for conducting field work & schedules briefing which may be attended by DES
representatives. Venue &time schedule of training should be informed well in advance to DES.
(ix) To conduct field work, venue &time schedule of fieldwork should be informed well in advance to
DES so that DES representatives can inspect the same.
(x) To monitor field work & take corrective measures
(xi) To capture data (collection, validation, data entry & compilation in electronic format)
(xii) To validate captured data
(xiii) To tabulate validated data
(xiv) To analyse tabulated data (tabulation plan to be mutually decided by DES with successful bidder)
(xv) To submit questionnaire and final evaluation report (soft copy and 10 Hard copies each) covering
results & recommendations in Marathi language. However, summary & recommendations will have
to be submitted in both Marathi and English language.
(xvi) To submit raw data, final data (in electronic format) and schedules to DES. The schedules which
would be canvassed by successful bidder should be submitted to DES, if canvassed physically.
(xvii) Secondary data needs to be analysed for all Districts. (Secondary data generated through
MIS/Administrative operative system).
(xviii) Fortnight report indicating the progress of evaluation survey should be submitted regularly to DES.
All rights regarding this evaluation survey are reserved to DES.
Kindly refer to the ‘4.4 Scope of work’ for empanelled agencies mentioned in the tender document
OAP/EVL/1116/277, dated 09th May, 2016 and OAP/EVL/1116/679, dated 23rd December, 2016. The
successful bidder will have to adhere to the standard prescribed by United Nations Group of
Evaluation. (Please refer the site http://www.uneval.org/document/detail/22). Further Corrigendum-1
issued to the above mentioned tender document dated 09th May, 2016, wherein it has been made
binding on the empanelled agencies to adhere to the guidelines issued by erstwhile Planning
Commission. These guidelines are available at
http://planningcommission.nic.in/reports/peoreport/peo/guide_consult1902.pdf(pages 1-7). The bidders are
advised to refer to these standards for conducting evaluation studies of various evaluation schemes
conducted by DES available at http://mahades.maharashtra.gov.in/surveyreports.do?repCatId=ES
Expected important activities
The successful bidder will have to ensure that all data is collected, validated and tabulated as per the
specified time schedule. Following are the expected important activities
a. A summary of interaction with various stakeholders like health officials, local bodies,
beneficiaries, etc.
b. Fortnight/Mid progress report to be submitted.
c. Reports on documentation of experiences at the end of the study.
d. Presentations and participations in the discussions, meetings and minutes of meeting.
e. As per the planning department, Government Resolution dated 30th September, 1998 Para
No.9.9.1,& 10, it will be mandatory for successful bidder to present the finalized evaluation
study report/Presentation in front of committee in separate two meetings whenever called one
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 10 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
under the chairman ship of Hon Additional Chief Secretary (planning) and another headed by
Hon Chief Secretary, GoM.
Instructions to Bidder
1. Purpose of Bid Document
This document provides information to enable the bidders to understand the broad requirements to
submit their "Bids".
2. Cost of Bid Document
The Cost of tender document is INR 1,000/- (Rupees One Thousand only) inclusive of GST which shall be
paid online. Bidders from Group II Category A2 are exempted for submitting Tender fee and EMD.
3. Completeness of Bid Document
Bidders are advised to study all instructions, forms, terms, requirements and other information in the Bid
Documents carefully. Submission of bid shall be deemed to have been done after careful study and examination
of the Bid Document with full understanding of its implications. The response to this Bid Document should be
full and complete in all respects. Failure to furnish all information required, submission of a proposal not
substantially responsive in every respect will be at the bidder's risk and may result in rejection of the bid.
4. Proposal Preparation Cost
The bidder shall be responsible for all costs incurred in connection with participation in this process, including,
but not limited to, costs incurred in conduct of informative and other diligence activities, participation in
meetings/discussions/presentations, preparation of proposal, in providing any additional information required
by DES to facilitate the evaluation process, and in negotiating a definitive Contract or all such activities related
to the bid process. The DES will in no case be responsible or liable for such costs, regardless of the conduct or
outcome of the bidding process.
This Bid Document does not commit DES to award a contract or to engage in negotiations. Further, no
reimbursable cost may be incurred in anticipation of award. All materials submitted by the Bidder shall become
the property of the DES and may be returned at the sole discretion of DES.
5. Period of Validity of Bids
Bids shall remain valid for the period of 180 days after the bid submission deadline date prescribed by DES. A
bid valid for a shorter period shall be rejected by DES as non-responsive.
In exceptional circumstances, prior to the expiration of the bid validity period, the DES may request Bidders to
extend the period of validity of their Bids. The request and the responses shall be made in writing. In this case,
the EMD shall also be extended for Thirty days (30) beyond the deadline of the extended validity period. No
interest will be paid by DES on amount of EMD.
6. Pre-Bid Meeting
DES will host a Pre-Bid Meeting for queries (if any) raised by the prospective bidders. The date, time and place
of the meeting are given in this document. The representatives of the bidders may attend the pre-bid meeting at
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 11 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
their own cost. The purpose of the pre-bid meeting is to provide a forum to the bidders to clarify their doubts /
seek clarification or additional information, necessary for them to submit their bid.
All enquiries from the bidders relating to this Bid Document must be submitted to Deputy Director (Evaluation)
by 16th July, 2018 till 14.00 Hrs. These queries should also be emailed to [email protected]. The
queries should necessarily be submitted in the following format as a Word Document:
Format for raising queries in the bidding:
# Bid Document reference (Section
No., Page No.)
Content of the Bid Document
requiring clarification
Clarification sought
/ queries
1
2
3
Authorisation letter in the name of the person attending pre-bid meeting needs to be submitted on the letterhead
of the Bidder during the pre-bid meeting in the format specified in Annexure C.
Queries submitted post the deadline mentioned or which do not adhere to the above mentioned format may not
be responded to. All the responses to the queries (clarifications/corrigendum) shall be made available at DES
Head office & will be informed to respective vendor accordingly.
7. Amendments to Bid Document
At any time before the deadline for submission of bids, the Directorate, may, for any reason, whether at its own
initiative or in response to a clarification requested by a prospective Bidder, modify the Tender Document by an
amendment. All the amendments made in the document would be issued as a corrigendum to the Tender
Document and shall be made available at http://mahatenders.gov.in.The bidders are advised to visit the website
http://mahatenders.gov.in on regular basis for checking necessary updates. DES also reserves the rights to
amend the dates mentioned in this Tender Document for bid process.
In order to afford prospective Bidders reasonable time in which to take the amendment into account in
preparing their bids, DES may, at its discretion, extend the last date for the receipt of Bids.
8. Rights to Terminate the Process
DES may terminate the Bid Document process at any time and without assigning any reason. DES makes no
commitments, express or implied, that this process will result in a business transaction with anyone.
This Bid Document does not constitute an offer by DES. The bidder's participation in this process may result in
DES selecting the bidder to engage in further discussions and negotiations toward selection. The
commencement of such negotiations does not, however, signify a commitment by DES to execute a contract or
to continue negotiations. DES may terminate negotiations at any time without assigning any reason.
9. Site Visit/Field visit
The Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, Mantralaya, GoM through
Agriculture Commissionerate, Pune in the State. If intending bidder desires to visit field offices, it is requested
that prior appointments of concerned officers be taken (for which accommodation/Transportation charges will
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 12 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
be incurred by successful bidder only). The letter for extending co-operation to the intending bidder shall be
issued by DES to the offices of Agriculture Commissionerate, if demanded. Man-days for field work and
expected duration of field work must be shared with DES. Also convey the visit schedule of survey well in
advance along with name and contact details of surveyor to the respective Deputy Commissioner or District
Statistical officer so that DES representative may visit the same randomly which will also help the agency to
collect information from Government Official if they refuse to do so. Successful bidder must send written
communication to Administrative Department (Agriculture Department) and concerned office for necessary
primary / secondary data for the said evaluation survey within one month of issuing of work order. If concerned
office fails to provide necessary information regarding the scheme within one month of awarding the tender,
successful bidder should communicate to DES, Evaluation Branch with all follow up letters &list of required
information for the study for further necessary action.
10. Language of Bid
The Bids prepared by the Bidder and all correspondence and documents relating to the bids exchanged by the
Bidder and DES, shall be written in English language, provided that any printed literature furnished by the
Bidder in another language shall be accompanied by an English translation in which case, for purposes of
interpretation of the bid, the English translation shall govern.
If any supporting documents submitted are in any language other than English, translation of the same in
English language is to be duly attested by the bidder.
11. Bid Submission Format
The entire proposal shall be strictly as per the format specified in this Bid document. Details of the format are
given in Part-II Annexures of this tender document. Bidder shall ensure that the bid documents are submitted in
the respective folder online.
12. Documents Comprising of Bid
The following table is provided as a guideline for submitting various important documents along with the bid.
# Type of Envelope Documents to be submitted
01 Technical
Proposal Folder
(Envelope A)
Annexure A: Bid Cover Letter
Online payment receipt of EMD of Rs. 10,000/- & Online payment receipt
of Limited Tender Fee of Rs. 1,000/-
Annexure B: Format to share Bidder’s Particulars and contact person’s
details
Annexure C: Authorisation letter for attending pre-bid meeting (To be
provided on the letter head of Bidder)
Annexure D: Format for CV of 3 key staff members proposed for this study
Annexure E: Draft Format for activity wise work plan with subject title
Annexure F: Brief understanding of Rashtriya Krishi Vikas Yojna
Annexure G: Proposed methodology for evaluation study of Rashtriya Krishi
Vikas Yojna
(Complete tender documents with signature & stamp of authorized signatory on each
page with proper subject title)
02 Commercial
Proposal Folder
(Envelope B)
Annexure H: Format for Price schedule
Commercial Bid (in the BoQ format)
(Complete tender documents with signature & stamp of authorized signatory on each
page with proper subject title)
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 13 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Condition: It may be noted that, the activities which can be sub-contracted should be strictly as per the RFP
document OAP/1116/EVL/277 for empanelment dated 9th May, 2016&OAP/1116/EVL/679 dated 23rd
December, 2016.
Tender to be submitted in two separate parts containing Technical and Commercial proposals (online).
Commercial offer must be given in separate envelope. Price Bid should not contradict in Technical proposal in
any manner. Bidder should submit their prices only in price schedule (Annexure H) given in the tender, prices
quoted other than in the bid form shall be liable to be rejected. The bid form must be filled completely, without
any errors, erasures or alterations.
The bidder offer shall contain no interlineations, erasures or overwriting excepts as necessary to correct errors
made by the bidder, in which case such corrections shall be initiated by the person or persons signing offer.
Offers containing erasures or alterations will not be considered. There should be no hand- written material,
corrections or alterations in the offer. Technical details must becompletely filled up. Filling up of the technical
details Form using terms such as “OK”, “accepted”, “noted”, “as given in the brochure/manual” is not
acceptable. The DES may treat offers not adhering to these guidelines as unacceptable.
13. Earnest Money Deposit (EMD) and refund for Group I – Category A1
Bidders are required to submit EMD of Rs.10,000/- (Rupees Ten Thousand only) online on the
https://mahatenders.gov.in portal.
Unsuccessful Bidder’s bid security (EMD) will be discharged/ returned after the expiration of the period of
tender offer validity prescribed by the DES.
The successful Bidder’s bid security (EMD) will be discharged upon the bidder executing the Contract and
furnishing the Security deposit/performance security in the form of performance bank guarantee. The bid
security may be forfeited if a Bidder withdraws its bid during the period of bid validity or in case of a successful
Bidder, if the Bidder fails:
i) To sign the contract in accordance with the terms and conditions
ii) To furnish performance bank guarantee as specified in the terms and conditions
14. Submissions of Bid
Complete bidding process will be online (e-tendering) in two envelope system. All the notifications&
detailed terms and conditions regarding this tender notice hereafter will be published online on web site
https://mahatenders.gov.in.
Bidding documents can be seen, downloaded and submitted in electronic format on the website. The
deadline for submission of bid is specified in this document.
The bidders are required to submit EMD online on web site https://mahatenders.gov.in
Technical Proposal bids will be opened online on website https://mahatenders.gov.in on 25th July,2018
Bidder should submit information & scanned copies in only PDF format in Technical Proposal
Envelope as mentioned in the Bid Document.
Uploaded documents of successful bidder may be verified with the original before signing the
agreement. The successful bidder has to provide the originals to the concerned authority.
No physical documents of Technical Proposaland Commercial Bid envelopes shall be accepted. Only
the soft copies need to be uploaded on e-tendering website.
Time and date of opening of Commercial bids will be informed by email to technically qualified bidder.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 14 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
The guidelines to download the tender documents and online submission of bids and procedure of
tender opening can be downloaded from website http://mahatenders.gov.in.
All documents are mandatory, however, DES reserves right to waive minor infirmity / non-conformity
or call for clarifications / additional documents. The bidder will have to submit additional document /
clarification within 3 working dates from the date of issue of the letter / mail seeking clarification /
additional document. The Director, Directorate of Economics & Statistics, Mumbai, GoM reserves the right to accept or
reject any or all the tenders without assigning any reason.
15. Opening of Bid
Bids shall be opened through e-tender process (online). All the Bids received within the deadline shall be
opened at the date, place and time mentioned in “Important Information” of this tender document.
The technical bids of all bidders will be opened.
The Bidders’ representatives who are present shall be requested to sign the attendance sheet. Authorisation
letter in the name of the person attending bid opening meeting needs to be submitted on the letterhead of the
Bidder during bid opening in the format specified in Annexure C.
Once the bids are opened each bid will be checked for technical criteria.
16. Opening of Commercial Bid
Bids shall be opened through e-tender process (online). The commercial bids of only technically successful
bidders will be opened. DES shall notify the technically qualified bidders about the date of opening the
Commercial Bids.
The commercial bids will be opened and assessed by DES for completeness and accuracy. Arithmetical errors
will be rectified on the following basis -
If there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall
prevail and the total shall be corrected.
If there is a discrepancy between words and figures, the amount in words will prevail unless the amount
expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail
subject to the points above.
The amount stated in the proposal form, adjusted in accordance with the above mentioned procedure,
shall be considered as binding, unless it causes the overall proposal price to rise, in which case the
proposal price shall govern.
If the bidder does not accept the correction of errors, its bid will be rejected and the bid security may be
forfeited.
17. Evaluation Process
DES shall appoint an Evaluation Committee (EC) to scrutinize and evaluate the technical and commercial bids
received. The EC will examine the Bids to determine whether they are complete, responsive and whether the
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 15 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Bid format confirms to the Bid Document requirements. DES may waive any informality or nonconformity in a
Bid which does not constitute a material deviation according to DES.
The evaluation process of the Bid Document proposed to be adopted by DES is indicated under this
clause. The purpose of this clause is only to provide the Bidder an idea of the evaluation process that
DES may adopt. However, the Director, DES reserves the right to modify the evaluation process at
any time during the Tender process, without assigning any reason, whatsoever, and without any
requirement of intimating the Bidder of any such change.
The committee constituted by DES shall evaluate the response to the tender process and all supporting
documents. Criteria for Technical Evaluation of the bids which shall be followed under this procedure are as
follows:
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 16 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
# Technical Bid Criteria Points
1 Understanding of scheme Rashtriya Krishi Vikas Yojna implemented by Agriculture
Department, GoM in detail 25
2 Proposed methodology for Evaluation Study of Rashtriya Krishi Vikas Yojna implemented by
Agriculture Department, GoM (Sampling method, Sample size, etc.) 25
3 Proposed team composition (3 key members)
a. Criteria for assigning marks
i. Total experience of all 3 key members in evaluation/ sample survey.
ii. Experience in conducting evaluation/ sample survey in development sector
especially on Agriculture and allied sector part.
iii. Qualification :- Post Graduate in Economics/ Statistics or Post Graduate Degree
in Agriculture/ Dairy/Civil Engineer/MBA in Agriculture Marketing
iv. Team should be retained throughout the project. If member changes, it should be
done with one month prior notice. In case of substitute replaced candidate
should have similar qualification as mentioned in the bid.
b. Conditions and methodology of assigning marks :
i. None of the key member should be greater than 65 years of age
ii. 3 Mandatory key members should be
a) One key member should be post graduate in Statistics
b) One key member should be post graduate in Economics
c) One key member should be Post Graduate in Agriculture
Project wise optional key members :
d) One key member should be Post Graduate in Veterinary Science
e) One key member should be Civil Engineer (structural)
f) One key member should be Post Graduate in Horticulture
g) One key member should be MBA in Marketing
h) One key member should be Post Graduate in Dairy
with 3 years of experience each
iii. Total experience of all 3 key members in the field of evaluation studies / sample
surveys shall be calculated. The bidder with highest experience will get the
highest marks. The total experience of each other bidder will be compared with
the bidder having highest experience and proportionate marks shall be given to
each of them.
For non-compliance of b. (i) & (ii) conditions, 5 marks each shall be deducted.
30
4 Work plan:
i. Work plan should be feasible and aggressive (maximum 180 days). The
feasibility of the work plan shall be assessed activity wise by Evaluation
Committee. The most aggressive and feasible work plan (in the eyes of
Evaluation Committee) shall be given highest marks.
ii. The bidders proposing work plan for more than 180 days, the deduction of
marks would be done in the proportion of 2 marks for each additional 10 days or
part thereof.
20
Total 100
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 17 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
The Evaluation Committee shall invite each bidder to make a power point presentation as part of the technical
evaluation. Bidder must submit soft copy of power point presentation. Bidder should carry all necessary original
documents at the time of presentation. Presentation marks will be awarded on the basis of quality of content and
the bidder who is found to show case the best quality in particular criteria defined above shall be awarded
maximum marks, other bidders awarded marks on relative basis. In order to qualify technically, Bidder must
secure a minimum of 60% of total marks in technical evaluation after summing up. Only those Bidders
who have a minimum score of 60 % of total marks in technical evaluation will be considered for opening
of their Commercial Bid. Only the Bids qualifying the technical evaluation will be considered for
commercial evaluation.
The Bidder must possess the technical know-how and the financial ability that would be required to
successfully provide the services sought by DES, GoM, Mumbai for the entire period of the contract. The
Bidder’s Bid must be complete in all respects, conform to all the requirements, terms and conditions and
specifications as stipulated in the Bid Document.
There should be no mention of bid prices in any part of the Bid other than the Commercial Bids.
Directorate of Economics and Statistics, GoM, Mumbai reserve rights to negotiate with successful bidder.
18. Award Criteria
The technically qualified bidders will further be selected on the basis of QCBS (Quality and Cost Based
Selection) method. Technical score would be assigned as per technical evaluation and Commercial Score would
be calculated as ((Minimum commercial value of all the bidders/Commercial Value of the concerned bidder) *
100) and Final Score would be calculated as (0.55 * Technical Score) + (0.45 * Commercial Score). The Final
score will be calculated as follows:
Example :
In order to qualify technically, bidders must secure minimum Technical Score of 60.
• The Final Normalized technical score of the Bidder shall be calculated as follows :
Normalized Technical Score of a Bidder = Technical Score of that Bidder X 100
Score of the Bidder with the highest technical score
Bidders Technical Score Calculation Normalized Technical Score :
Sr.No. Bidder Technical
Score
Normalized
Technical Score
Technical
score to be
considered
1 Bidder-1 88 (88/95)*100 93
2 Bidder-2 90 (90/95)*100 95
3 Bidder-3 80 (80/95)*100 85
4 Bidder-4 95 (95/95)*100 100
• Only technically qualified Proposals shall be considered for Financial bid Opening.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 18 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Evaluation of Financial Proposal
a. The Normalized Financial score of the technically qualified bidders will be calculated, while considering
the Financial quote given by each of the Bidders in the Financial Bid as follows :
Normalized Financial Score of a Bidder = Lowest Financial Quote of BidderX 100
Financial Quote of Bidder under consideration
Bidders Financial Quote (In Calculation Normalized Financial lakhs) Score
Sr.No. Bidder Financial
Quote
(` In thousand)
Normalized
Financial Score
Financial Score to
be considered
1 Bidder-1 110 (110/110)*100 100
2 Bidder-2 140 (110/140)*100 79
3 Bidder-3 160 (110/160)*100 69
4 Bidder-4 130 (110/130)*100 85
b. The bid price will include all applicable taxes and shall be in Indian Rupees and mentioned separately.
Final score calculation through QCBS :
a. The final score will be calculated through Quality and Cost selection method based with the following
weight-age:
Technical: 55%
Financial: 45%
Final Score = (0.55*Normalized Technical Score) + (0.45* Normalized Financial Score)
Sr.
No. Bidder
Bidders
Normalized
technical
score
Weighted
Technical
score
{column
(3)*55}/100
Normalized
Financial
Final Score
Weighted
Financial
score
{column
(5)*45}/100
Final Score
column (4)+
column (6)
(1) (2) (3) (4) (5) (6) (7)
1 Bidder-1 93 51 100 45 96
2 Bidder-2 95 52 79 36 88
3 Bidder-3 85 47 69 31 78
4 Bidder-4 100 55 85 38 93
b. The bidder with the highest Final score shall be treated as the Successful bidder. In the above example,
Bidder-1 will be treated as successful bidder.
c. In the event the Final scores are ‘tied’, the bidder securing the highest technical score will be
adjudicated as the Best Value Bidder for award of the project.
The bidder with highest final score would be considered for award of contract. DES shall award the Contract to
the selected bidder by issue of Letter of Award. Prior to the expiration of the period of proposal validity, the
bidders will be notified in writing or by fax or email that their proposal has been accepted.
If the selected bidder does not sign the Contract and does not submit Performance Bank Guarantee within 15
days, the Letter of Award may be cancelled. The deadline may be extended only once on request by successful
bidder.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 19 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
19. Clarification of Bid
To assist in the examination, evaluation, and comparison of the Bids and qualification of the Bidders, DES may,
at its discretion, ask any Bidder for a clarification of its bid. Any clarification submitted by a Bidder that is not
in response to a request by DES shall not be considered, and DES’s request for clarification and the response
shall be in writing. If the Bid includes a financial proposal, no change in the prices or substance of the bid shall
be sought, offered, or permitted, except to confirm the correction of arithmetic errors discovered by DES in the
evaluation of the Bids.
If a Bidder does not provide clarifications of its bid by the date and time set in DES’s request for clarification,
its bid shall be rejected.
20. Non-Material Non-Conformities
Provided that a bid is substantially responsive, DES may waive any non-conformity in the bid that does not
constitute a material deviation, reservation or omission.
DES may request that the Bidder submit the necessary information or documentation, within a reasonable
period of time, to rectify non-material non-conformities in the bid related to documentation requirements.
Requesting information or documentation on such non-conformities shall not be related to any aspect of the
price of the bid. Failure of the Bidder to comply with the request may result in the rejection of its bid.
DES may rectify non-material non-conformities related to the Bid Price. To this effect, the Bid Price shall be
adjusted, for comparison purposes only, to reflect the price of a missing or non-conforming item or component.
21. Stamp Duty
The stamp duty payable for the contract shall be borne by the successful bidder.
22. Signing of Contract
The successful bidder is required to refer to the draft Contract Form (CF)/MoU, attached as Annexure J in this
Bid Document, which will be considered as base document before signing the agreement between DES &
Successful Bidder. Within 15 days of receipt of the letter of intent, the successful Bidders shall sign and date the
Contract and return it to DES. One extension on bidder’s request may be given by DES at its sole discretion.
Successful bidder must sign on each page of all tender document including corrigendum.
Terms and Conditions of contract
1. Eligibility
All bidders in Group 1- category A1 & Group II-category A2, who are currently empanelled & have completed
all the necessary formalities mentioned in the Government Resolution dated 22nd July, 2016, 26th September,
2017, 27th September, 2017 and 4th April, 2018 are eligible to apply for this tender. Bidders who have not
complied all terms & conditions of RFP Ref. OAP/1116/EVL/277 dated 09th May, 2016 and
OAP/1116/EVL/679 dated 23rd December, 2016 of empanelment before closing date of this RFP are not eligible
to apply.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 20 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
2. Terms and Conditions
All terms & conditions mentioned in the DES empanelment tender document no. OAP/1116/EVL/277 dated
09th May, 2016 and 23rd December, 2016for empanelment as well as in this contract agreement shall be valid
throughout the term of this contract agreement. In case of any friction between the terms & conditions
mentioned in the tender document and contract agreement, the terms and conditions mentioned in the tender
document shall prevail. All the commitments made by the bidder through correspondences for the completion
of the tender process as well as during the presentation shall be applicable as part of this contract.
3. Performance Bank Guarantee
The successful bidder shall at his own expense, deposit with DES, within 15 days from the date of issuance of
LoI the notification of award of the contract or prior to signing of the contract, whichever is earlier, an
unconditional and irrevocable Performance Bank Guarantee (PBG) from any Scheduled or Nationalised bank as
per the format given in this Bid Document, payable on demand, for the due performance and fulfilment of the
contract by the bidder.
This Performance Bank Guarantee will be for an amount equivalent to 10% of contract value and shall be valid
for 12 months. All charges whatsoever such as premium, commission, etc. with respect to the Performance
Bank Guarantee shall be borne by the bidder.
The Performance Bank Guarantee format can be found in the Annexure I section of this document.
The Performance Bank Guarantee may be discharged/ returned by DES upon being satisfied that there has been
due performance of the obligations of the Bidder under the contract. However, no interest shall be payable on
the Performance Bank Guarantee. Bidders from Group II Category A2 are exempted for submitting
Performance Bank Guarantee.
4. Payment Terms
Group I – Category A1 agencies: No advance payment will be made at any stage. TDS will be deducted as
applicable at source. Payment shall be made within 45 days from the date of submission of invoice. The
payment shall be made as follows:
Payment terms
# Stages of Payment Delivery wise payments percentage
(including taxes)
1 On submission of raw data in electronic format along with canvassed
filled in interviewed schedules- 1st instalment 10 per cent of contract value including taxes.
2 On submission of final data, tables and acceptance of the same by
DES– 2nd instalment 20 per cent of contract value including taxes.
3 On submission of draft evaluation report covering detailed analysis,
findings and recommendations - 3rd instalment 20 per cent of contract value including taxes.
4 On acceptance of final report by the committee constituted – Last
instalment 50 per cent of contract value including taxes.
For Group II – Category A2 agencies stages of payment will be decided mutually before signing of MOU.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 21 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
5. Penalty (Please see Expected broad procedure (ii))
The successful bidder should adhere to the work plan strictly. Delay beyond 180 days shall attract penalty of `
2000/- per week or part thereof (Period of 180 days will be calculated from the date of work order. No
communication will be entertained in this regard). DES reserves the right to waive off penalty considering
prevailing circumstances and the reasons for delay for which successful bidder is not responsible. If the final
report of the study is not submitted as per the agreed condition and within the stipulated timelines, where the
delay is on account of the successful bidder then the DES will withhold the last instalment. All penalties shall
be deducted subject to a cap of 25 per cent of contract value.
6. Indemnity
The successful bidder agrees to indemnify and hold harmless DES, its officers, employees and agents (each a
“Indemnified Party”) promptly upon demand at any time and from time to time, from and against any and all
losses, claims, damages, liabilities, costs (including reasonable attorney’s fees and disbursements) and expenses
(collectively, “Losses”) to which the Indemnified Party may become subject, in so far as such losses directly
arise out of, in any way relate to, or result from any misstatement or any breach of any representation or
warranty made by the successful bidder.
7. Force Majeure
The successful bidder shall not be liable for forfeiture of its Performance Guarantee, imposition of liquidated
damages or termination for default, if and to the extent that it’s delay in performance or other failure to perform
its obligations under the contract is the result of an event of Force Majeure. For purposes of this Clause, “Force
Majeure” means an event beyond the “reasonable” control of the successful bidder, not involving the successful
bidder’s fault or negligence and not foreseeable. Such events may include Acts of God & acts of Government of
India in their sovereign capacity.
For the successful bidder to take benefit of this clause it is a condition precedent that the successful Bidder must
promptly notify DES, in writing of such conditions and the cause thereof within 5 calendar days of the Force
Majeure event arising. DES or the evaluation committee appointed by DES shall study the submission of the
successful bidder and inform whether the situation can be qualified one of Force Majeure. Unless otherwise
directed by DES in writing, the successful bidder shall continue to perform its obligations as far as it is
reasonably practical, and shall seek all reasonable alternative means for performance of services not prevented
by the existence of a Force Majeure event.
In the event of delay in performance attributable to the presence of a force majeure event, the time for
performance shall be extended by a period(s) equivalent to the duration of such delay. If the duration of delay
continues beyond a period of 15 days, DES and the successful bidder shall hold consultations with each other in
an endeavor to find a solution to the problem.
Notwithstanding anything to the contrary mentioned above, the decision of DES shall be final and binding on
the successful bidder.
8. Termination of contract
DES may, without prejudice to any other remedy under this Contract and applicable law, reserves the right to
terminate for breach of contract by providing a written notice of 15 days stating the reason for default to the
successful bidder and as it deems fit, terminate the contract either in whole or in part:
If the successful bidder fails to deliver any or all of the requirements of this evaluation study (more
particularly described elsewhere in this tender document); or
If there is more than 25 percent delay in the time frame as per activity chart proposed by bidder and
accepted by DES; or
If the successful bidder fails to perform any other obligation(s) under the contract.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 22 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Prior to providing a notice of termination to the successful bidder, DES shall provide the successful bidder with
a written notice of 15 days instructing the successful bidder to cure any breach/ default of the Contract, if DES
is of the view that the breach may be rectified.
On failure of the successful bidder to rectify such breach within 15 days, DES may terminate the contract by
providing a written notice of 15 days to the successful bidder, provided that such termination will not prejudice
or affect any right of action or remedy which has accrued or will accrue thereafter to DES. In such an event the
successful bidder shall be liable for penalty/liquidated damages imposed by DES.
In the event of termination of this contract for any reason whatsoever, DES is entitled to impose any such
obligations and conditions and issue any clarifications as may be necessary to ensure an efficient transition and
effective continuity of the services which the successful bidder shall be obliged to comply with and take all
available steps to minimize the loss resulting from that termination/ breach, and further allow and provide all
such assistance to DES and/ or succeeding bidder, as may be required, to take over the obligations of the
successful bidder in relation to the execution/ continued execution of the requirements of this contract.
9. Rights to Accept/Reject any or all proposals
Director, DES reserves the right to accept or reject any proposal and to annul the bidding process and reject all
Bids at any time prior to award of Contract, without thereby incurring any liability to the affected Bidder or
Bidders or any obligation to inform the affected bidder or bidders of the grounds for DES's action.
10. Fraud and Corruption
DES requires that Bidder must observe the highest standards of ethics during the execution of the contract. In
pursuance of this policy, DES defines, for the purpose of this provision, the terms set forth as follows:
(i) “corrupt practice” is the offering, giving, receiving or soliciting, directly or indirectly, of anything
of value to influence improperly the actions of another party;
(ii) “fraudulent practice” is any act or omission, including a misrepresentation, that knowingly or
recklessly misleads, or attempts to mislead, a party to obtain a financial or other benefit or to avoid an
obligation;
(iii) “collusive practice” is an arrangement between two or more parties designed to achieve an improper
purpose, including to influence improperly the actions of another party;
(iv) “coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly,
any party or the property of the party to influence improperly the actions of a party;
(v) “obstructive practice” is
i. deliberately destroying, falsifying, altering or concealing of evidence material to the
investigation or making false statements to investigators in order to materially impede a DES
investigation into allegations of a corrupt, fraudulent, coercive or collusive practice; and/or
threatening, harassing or intimidating any party to prevent it from disclosing its knowledge of
matters relevant to the investigation or from pursuing the investigation, or
ii. Acts intended to materially impede the exercise of DES’s inspection and audit rights.
If it is noticed that the Bidder has indulged into the Corrupt / Fraudulent / Unfair / Coercive practices,
a) It will be a sufficient ground for DES to terminate the contract and initiate black-listing of the vendor.
b) It will reject a proposal for award if it determines that the bidder recommended for award has, directly
or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive practices in
competing for the contract;
c) It will sanction a firm or individual, including declaring ineligible, either indefinitely or for a stated
period of time, to be awarded a DES-financed contract if it at any time determines that the firm has,
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 23 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
directly or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive
practices in competing for, or in executing, a DES-financed contract; and
d) It will have the right to require that a provision be included in bidding documents and in contracts
financed by DES, a provision be included requiring bidders, suppliers and contractors to permit DES
to inspect their accounts and records and other documents relating to the bid submission and contract
performance and to have them audited by auditors appointed by DES.
In the event of the successful bidder being unable to service the contract for whatever reason, DES would evoke
the PBG. Notwithstanding and without prejudice to any rights whatsoever of DES under the Contract in the
matter, the proceeds of the PBG shall be payable to DES as compensation for any loss resulting from the
Bidder’s failure to complete its obligations under the Contract. DES shall notify the successful bidder in writing
of the exercise of its right to receive such compensation within 14 days, indicating the contractual obligation(s)
for which the Bidder is in default.
DES shall also be entitled to make recoveries from the successful bidder’s bills, performance bank guarantee, or
from any other amount due to him, the equivalent value of any payment made to him due to inadvertence, error,
collusion, misconstruction or misstatement.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 24 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Part II – Annexures
Annexure A: Bid Cover Letter
Date: dd/mm/yyyy
To,
The Director,
Directorate of Economics & Statistics, Government of Maharashtra,
New Administrative Bldg., 7th floor, Opposite Mantralaya, Mumbai 400 032
Sub : Selection of bidder to conduct evaluation study of Rashtriya Krishi Vikas Yojna implemented
by Agriculture Department, GoM
Ref : Tender No: EVL/1117/RKVY/502, Dated 5th July, 2018.
Dear Sir,
Having examined the Bid Document (and the clarification / corrigendum issued thereafter, if any), the
receipt of which is hereby duly acknowledged, we, the undersigned, offer to conduct evaluation study
of “Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM”.
We attach hereto our responses to Technical requirements & commercial proposals as required by the
Bid Document. We confirm that the information contained in these responses or any part thereof,
including the exhibits, and other documents and instruments delivered or to be delivered to Directorate
of Economics and Statistics, is true, accurate, verifiable and complete. This response includes all
information necessary to ensure that the statements therein do not in whole or in part mislead the DES
in its short-listing process.
We fully understand and agree to comply that on verification, if any of the information provided here
is found to be misleading the selection process, we are liable to be dismissed from the selection
process or termination of the contract during the project, if selected to do so.
We agree for unconditional acceptance of all the terms and conditions set out in the Bid Document (&
subsequent clarification / corrigendum, if any) and also agree to abide by this tender response for a
period of 180 days from the date fixed for bid opening. We hereby declare that in case the contract is
awarded to us, we shall submit the Performance Bank Guarantee and sign the contract in the form
prescribed in the Bid Document.
We agree that you are not bound to accept any tender response you may receive. We also agree that
you reserve the right in absolute sense to reject all or any of the products/ services specified in the
tender response.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 25 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
It is hereby confirmed that I/We are entitled to act on behalf of our company/ corporation/ firm/
organisation and empowered to sign this document as well as such other documents, which may be
required in this connection.
_____________________________________
Signature of Authorized Signatory (with official seal)
Name :
Designation :
Address :
Telephone & Fax :
E-mail address :
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 26 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure B: Format to share Bidder’s particulars and contact person’s details
# Description Details (to be filled by the responder
to the Bid Document)
Organisation/Institution Details:
1. Name of the Organisation/Institution
2. Official address & contact details
3. Phone No. and Fax No.
4. Service Tax Registration No.
5. Permanent Account Number (PAN) of the agency
Authorised signatory:
1. Name
2. Title
3. Organisation/Institution address
4. Phone No.
5. Mobile No.
6. Fax
7. e-mail
Secondary contact:
1. Name
2. Title
3. Phone No.
4. Mobile No.
5. Fax
6. e-mail
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 27 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure C: Authorisation letter for attending pre-bid meeting
(To be provided on the letter head of Bidder)
No………………………………….… Date………………….
To,
The Director,
Directorate of Economics & Statistics,
Mumbai
Sub: Bid No………….…………………………………… due date………………..
Sir,
We hereby authorize Dr./Mr./Ms.……………………………………….as our authorized
representative, to represent us on the following occasion:
i. Pre-bid Meeting to be held on……………..at……………a.m./p.m.
Kindly permit him/her to attend the same.
Yours faithfully,
Signature:
Name of signatory:
Designation:
Rubber Stamp
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 28 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure D: Format for CV of 3 key staff members proposed
Please submit CV of 3 key staff members with supportive documents for all the details mentioned.
1 Name of the Staff
2
Current designation in
the organisation / or on
hire basis
3 Age as tender issuing
date
4 Proposed role in the
evaluation study
5
Educational
Qualification (in
chronological order with
subject)
6 Language proficiency
Language Reading Writing Speaking
English
Marathi
Hindi
7 Total no. of years of
work experience
8
Total no. of years of
relevant experience in
evaluation/sample
surveys
9
Total no. of years of
relevant experience in
Agriculture and allied
sector
Note:
1. Third key staff members may or may not be full-time employee of the bidder. However, whenever
his/her services are required, this key member should be available.
2. Supportive documents must be attached.
3. Bidder should carry all necessary original documents at the time of presentation.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 29 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure E: Draft Format for activity wise work plan
# Activity Timelines Total
No. of
weeks <Month_1> <Month_....>
<week_1> <week_2> <week_3> <week_4> <week_..> <week_..> <week_..>
1 Schedule
Designing &
Pilot survey
along with
final
Approach
Note
2 Schedule
finalisation
3 To collect all
necessary
secondary
data
regarding
the scheme
from all
concerned
offices.
4 Instruction
set design
and training
to the field
staff
5 Actual field
work (man
days)
6 Inspection
7 Schedules
Scrutiny
8 Data entry in
electronic
form and
Validations
9 Tabulation
and data
analysis
10 Draft report
11 Final report
Note:
For an activity, please mention name of month and put tick in concern week.
Work plan (maximum up to 180 days) with timelines covering
Details of activities which shall be subcontracted (if any) and the names & address of sub contracted parties.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 30 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure F: Brief understanding of Rashtriya Krishi Vikas Yojna
(To be submitted by Bidder)
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
__________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
__________________________________________________________________________
Annexure G: Proposed methodology for evaluation study of Rashtriya Krishi Vikas Yojna
(To be submitted by Bidder) __________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 31 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure H: Format for Price Schedule
The Bidders have to fill the details for price schedule for conducting evaluation study of Rashtriya Krishi Vikas
Yojna implemented by Agriculture Department, GoM in below format.
This annexure should be submitted strictly on the letter head duly filled in, signed and stamped. (Signature &
stamp of authorized signatory on each page is mandatory).
Item Description Total Cost in Rs.
1
Submission of raw data (in electronic form) along with canvassed filled in
interviewed schedules
2 Submission of final data and all final tables as per tabulations plan
3 Submission of draft evaluation report
4 Final report and recommendations
5 Total Costs (Item 1 to 4)
6 Local taxes (as applicable)
7 Grand Total
Commercial proposal instructions:
The Bidder has to fill the details for price bid only in the BoQ format provided in the
https://mahatender.gov.in portal.
Note:
i. All the prices are to be entered in Indian Rupees (INR) ONLY.
ii. The Bidder needs to account for all Out of Pocket expenses due to Boarding, Lodging and other related items.
iii. Prices indicated in the schedules shall be including of all taxes, Levies, duties etc. It is mandatory to provide breakup of all type of
applicable Taxes, Duties & Levies wherever asked for at the time of raising invoice. During the payment stage, DES reserves the
right to ask the Bidder to submit proof of payment against any of the taxes, duties, levies etc.
iv. For the purpose of evaluation of Commercial Bids, DES shall make appropriate assumptions to arrive at a common bid price for
all the Bidders. This however shall have no co-relation with the Contract value or actual payment to be made to the Bidder.
v. The Contract Price shall be a firm lump sum not subject to any alteration.
vi. The successful bidder shall be deemed to have satisfied itself as to the correctness and sufficiency of the contract price, which
shall, except as otherwise provided for in the contract, cover all its obligations under the contract.
vii. DES would make payments to the successful bidder as delivery. The payment would be done within 45 days from the date of
submission of invoices.
viii. Director, DES reserves the rights to waive aforementioned penalty considering prevailing circumstances.
ix. In case there is a discrepancy between the amount specified in figures and words, the amount specified in words would prevail.
x. No advance payment will be made at any stage.
xi. TDS will be deducted as applicable at source.
TAN of DES : MUMD08726E
GSTIN of DES : 27MUMD08726EIDH
____________________________________
Signature of Authorized Signatory (with official seal)
Name :
Designation :
Address :
Telephone & Fax :
E-mail address :
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 32 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure I: Performance Bank Guarantee
(For a sum of 10% of the value of the contract value)
Ref. No. :
Date :
Bank Guarantee No. :
To,
The Accounts Officer,
Directorate of Economics & Statistics,
8th Floor, Administrative Building,
Government Colony, Bandra (East),
Mumbai-400 051
Against Letter of Intent number _________ dated _________ relating to Tender No.
EVL/1117/RKVY/502 Conduct evaluation study of “conducting evaluation study of Rashtriya
Krishi Vikas Yojna implemented by Agriculture Department, GoM” (hereinafter called the 'LoI’)
and the contract to be entered into between the Directorate of Economics & statistics,
Govt. of Maharashtra, (hereinafter called "DES") and _________________ (hereinafter called the
Bidder), this is to certify that at the request of the Bidder we ______________________ Bank, are
holding in trust in favour of --------------------, the amount of Rs. ___________________________
(write the sum here in words) to indemnify and keep indemnified the DES against any loss or damage
that may be caused to or suffered by the -------------------- by reason of any breach by the Bidder of any
of the terms and conditions of the contract that will be entered subsequently (within 15 days) and/or in
the performance thereof. We agree that the decision of --------------------, whether any breach of any of
the terms and conditions of the contract and/or in the performance thereof has been committed by the
Bidder and the amount of loss or damage that has been caused or suffered by -------------------- shall be
final and binding on us and the amount of the said loss or damage shall be paid by us forthwith on
demand and without demur to --------------------.
We __________________________________ Bank, further agree that the guarantee herein contained
shall remain in full force and effect during the period that would be taken for satisfactory performance
and fulfilment in all respects of the contract by the Bidder i.e. till _______________ (hereinafter
called the said date) and that if any claim accrues or arises against us _____________________ Bank,
by virtue of this guarantee before the said date, the same shall be enforceable against us
________________________ Bank, notwithstanding the fact that the notice of any such claim is given
to us __________________________ Bank, by -------------------- either before the said date or within
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 33 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
the enforcement period of six months thereafter. Payment under this letter of guarantee shall be made
promptly, within one month of our receipt of notice to that effect from -------------------.
It is fully understood that this guarantee is effective from the date of the said LoI and that we
_________________________ Bank, undertake not to revoke this guarantee during its currency
without the consent in writing of --------------------.
We undertake to pay to -------------------- any money so demanded notwithstanding any dispute or
disputes raised by the Bidder in any suit or proceeding pending before any court or Tribunal relating
thereto our liability under this present guarantee being absolute and unequivocal. The payment so
made by us under this guarantee shall be a valid discharge of our liability for payment there under.
We _____________________________ Bank, further agree that -------------------- shall have the
fullest liberty, without affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said contract or to extend time of performance by the Bidder from time to time or to
postpone for any time or from time to time any of the powers exercisable by -------------------- against
the said Bidder and to forebear or enforce any of the terms and conditions relating to the said contract
and we, ________________________ Bank, shall not be released from our liability under this
guarantee by reason of any such variation or extension being granted to the said Bidder or for any
forbearance by -------------------- to the said Bidder or for any forbearance and or omission on the part
of -------------------- or any other matter or thing whatsoever, which under the law relating to sureties,
would, but for this provision have the effect of so releasing us from our liability under this guarantee.
This guarantee will not be discharged due to the change in the constitution of the Bank or the Bidder.
Our liability under this Bank Guarantee shall not exceed and is restricted to Rs._______________
(Rupees _________________ only).
_____________________________________
Signature of Authorized Signatory (with official seal)
Date :
Place :
Name :
Designation :
Address :
Telephone & Fax :
E-mail address :
________________ ________________
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 34 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Signature of Witness 1 Signature of Witness 2
Name: __________________ Name: _____________________
(Bank's common seal)
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 35 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure J: A. Draft Contract Form (CF) with Group I Category A1 empanelled agencies on
Stamp Paper of `100
AGREEMENT MADE this _________ day______________ of 2018 at Directorate of Economics & Statistics,
Government of Maharashtra, 8th Floor, Administrative Building, Government Colony, Bandra (E), Mumbai-
400051
Between
The Director, Directorate of Economics & Statistics (DES), Planning Department, Government of Maharashtra,
hereinafter referred to as FIRST PARTY (which term or expression, unless excluded by or repugnant to the
subject or context, shall mean and include its successors-in office and assigns) of the First Part
AND
M/s _________________, an organization registered under ________________ act in India and having its
registered office at ___________________________________________________ hereinafter referred to as
SECOND PARTY” (which term or expression, unless excluded by or repugnant to the subject or context, shall
mean and include its successors and permitted assigns) of the Second Part
NOW IT IS HEREBY AGREED between the parties hereto as follows:
And Whereas FIRST PARTY intends to conduct evaluation study of “conducting evaluation study of
Rashtriya Krishi Vikas Yojna implemented by Agriculture Department, GoM”
The SECOND PARTY has accepted the contract on the terms and conditions set out in the tender document
________ dated ______ as well in the acceptance of tender no.____ dated_________, which will hold good
during period of this agreement.
Upon breach by the SECOND PARTY of any of the conditions of the agreement, the DES may issue a
notice in writing, determine and put an end to this agreement without prejudice to the right of the Government
to claim damages for antecedent breaches thereof on the part of the SECOND PARTY and also to reasonable
compensation for the loss occasioned by the failure of the SECOND PARTY to fulfil the agreement as certified
in writing by the DES which certificate shall be conclusive evidence of the amount of such compensation
payable by the SECOND PARTY to the Government.
This agreement shall remain in force until final presentation as per expected important activity (e) has
been proceed the contract unless and until the party decides to cancel the contract at any time upon giving 15
days’ notice in writing to the other party.
In witness whereof the said____________ hath set his hand hereto and the DES has on behalf of the
Government of Maharashtra affixed his hand and seal thereto the day and year first above written.
Notice in connection with the contract may be given by DES, or any gazetted officer authorised by the
DES.
In consideration of the payments to be made by the DES to the SECOND PARTY as hereinafter
mentioned the SECOND PARTY hereby covenants with the DES to provide the Services and to remedy defects
therein conformity in all respects with the provisions of the Contract.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 36 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
The Contract value will become payable by DES to the SECOND PARTY under the provisions of the
contract at the times and in the manner prescribed by the contract.
If subject to circumstances beyond control (Force Majeure) the contract fails to deliver the services in
accordance with the conditions mentioned in the contract, the First Party shall at his option be entitled either.
SECOND PARTY should adhere to the work plan strictly. Delay beyond 180 days shall attract penalty of Rs.
2000/- per week or part thereof. As per penalty clause and expected procedure (ii) condition should have been
followed. DES reserves the right to waive off penalty considering prevailing circumstances and the reasons for
delay for which SECOND PARTY is not responsible. If the final report of the study is not submitted as per the
agreed condition and within the stipulated timelines, where the delay is on account of the SECOND PARTY
then the DES will withhold the last instalment. All penalties shall be deducted subject to a cap of 10% of
contract value.
If the DES has not received requisite evaluation report because of the delay caused by the Second Party,
the performance Bank Guarantee shall be forfeited and no payments shall be effected full or part thereof to the
Second Party.
Signed, sealed and delivered
By-------------------------
------------------------------
For and on behalf of Directorate of Economics & Statistics, Planning Department, Government of
Maharashtra
Signed, sealed and delivered
By-----------------------------
For and on behalf of the “<SECOND PARTY>”,
----------------------------------------------
Witnesses: (Name, Designation, Contact No. & Signature)
(1)
(2)
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 37 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
B. Draft MoU Form with Group II Category A2 empanelled agencieson Stamp Paper of`
100
MEMORANDUM OF UNDERSTANDING (MoU)
For
Evaluation study of Rashtriya Krishi Vikas Yojna
Between
Directorate of Economics & Statistics, Planning Department, Government of Maharashtra,
Mumbai 400051.
and
< Name of the empanelled agency >
This MoU is entered into on this _________ day______________ of at Directorate of Economics & Statistics,
Government of Maharashtra, 8th Floor, Administrative Building, Government Colony, Bandra (E), Mumbai-
400051
Between
The Director, Directorate of Economics & Statistics (DES), Planning Department, Government of Maharashtra,
hereinafter referred to as FIRST PARTY (which term or expression, unless excluded by or repugnant to the
subject or context, shall mean and include its successors-in office and assigns) of the First Part
AND
<Name of the Empanelled Organisation>hereinafter referred to as SECOND PARTY” situated at <Address of
Empanelled Organisation>
The FIRST PARTY & SECOND PARTY are hereinafter collectively referred to as PARTIES.
And whereas:
The FIRST PARTY desires to carryout detailed evaluation study of Rashtriya Krishi Vikas Yojna
implemented by the Agriculture Department, GoM.
1. In response to the Tender of FIRST PARTY, SECOND PARTY agreed to carry out evaluation
study as mentioned in the tender document & bid submitted by theSECOND PARTY.
2. The SECOND PARTY agreed on to undertake the evaluation study for
Rs. /- (Rs. in words only excluding all prevailing taxes and duties). The total contract value
including prevailing taxes and duties is Rs./- (Rs. in words only AT CURRENT TAXES.) This
may change at the time of billing as per govt. norms and regulations).
NOW IT IS HEREBY AGREED between the parties hereto as follows:
1. Objective, Methodology, Coverage, Sampling etc. of the study:
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 38 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
The Agency has already spelled out the various details of the study the proposal RFP reference No.
OAP/1116/EVL/277 dated 09thMay, 2016& OAP/1116/EVL/679 dated 23rd December, 2016 submitted to DES.
These details are objectives, methodology, coverage, sampling, research tools, secondary data collection, and
work schedule.
The Tender document is also a part of this MoU. The assignment will be completed in 180 days from
the date of signing, barring any unusual circumstance or delay owing to circumstances not within our
control.
2. Output:
The SECOND PARTY will submit report covering results & recommendations in English language.
However, summary & recommendations will be submitted in both Marathi & English Language.
The Agency will present the draft report in stages, or one consolidated report for all projects together,
depending on the total no. of the projects/sites, spread up of the project sites etc. The report will cover
various aspects including Training, etc.
The agency will also submit a monthly report on the progress of the study on the last day of the
calendar month.
The Agency will make available three hard copies of the report. A soft copy of the report will also be
made available on CD.
3. Duration of MoU:
This MoU, has continued validity unless terminated by either PARTY.
4. Terms and conditions:
RFP reference No. OAP/1116/EVL/277 dated 09thMay, 2016&OAP/1116/EVL/679 dated 23rd December,
2016are the base document for this DES Tender including all terms, conditions and guidelines set forth. Agency
is advised to go through the Planning Department-Government Resolution No ममुाअ1016/प्र.क्र.78/का-1417,
dated 22ndJuly, 2016 and Government Corrigendum No. ममुाअ1016/प्र.क्र.78/का-1417, dated 26th September,
2017 as well.
5. Force Majeure:
It will not be treated as default in performance of the obligations under this agreement, if such
performance is prevented or delayed by events such as, but not limited to war, hostilities,
revolutions, riots, civil commotion, strikes, lockouts, conflagration, epidemics, accidents, fire,
wind, floods, droughts, earthquake or because of any other cause beyond the reasonable control
of the parties affected, provided notice in writing of any such cause with necessary evidence
that the obligations under the agreement is hereby affected or prevented or delayed is given
within 30 days from the happening for the event and in case it is not possible to serve the
notice within the said 30 days period, then within the shortest possible period without delay.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 39 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
As soon as the cause for Force Majeure is removed, the party whose ability to perform its
obligation has been affected will notify the other of such cessation of the actual delay incurred
thereof. From the date of occurrence of a case of force majeure, obligations of the party
affected shall be suspended during the continuance of any liability so caused, until the cause
itself and the liability resulting there have been removed and the agreed time of completion of
the respective obligations under this contract shall stand extended by a period equal to period
of delay occasioned by such evevnts.
Should one or both parties be prevented from fulfilling the contractual obligations by a state of
force mejeure lasting for a period of six months or more, then the two parties shall consult each
other and decide regarding the future execution of this contract.
6. Termination of Services :
The DESreserves the right to terminate this Agreement with one month’s prior notice. In such
case, fees/amount payable to consultant shall be determind on the basis of completed work. No
other claims from the Agency will be entertained by the DES and the decision of the DESon
the consultation fees shall be final and binding on consultant.
7. Arbitration :
In case of any dispute in execution of the work, or interpritation of any conditions of the
agreement, the parties can mutually decide to appoint an Arbitrator under the provisions of
Arbitration & Concilation Act 1996, and the decision of the Arbitrator shall be final and
binding on both the parties.
8. Property of the DES:
All documents and reports prepared and delivered to the DES under this agreement while
rendering the services shall become the property of the DES. The Agency will in no way be
liable to any defect, damage or loss thereof, once the same has been delivered to the DES by
the Agency.
9. Confidentiality:
a. The FIRST PARTY and the SECOND PARTY agree to hold in confidence all
information/data designed by the SECOND PARTY as being confidential which is
obtained from FIRST PARTY or Government Agency, created during the performance of
the MOU and will not disclose the same to any third party without written consent of the
FIRST PARTY or Government Agency.
b. The above confidential clause under this MoU excludes the information/data possessed by
SECOND PARTY before entering into this MoU or independently developed and/or
information already available through public domain.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 40 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
10. Amendments to Agreement:
Any amendment to extension of this Agreement, in order to be valid, will be in writing and
signed by all parties hereto.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and
year first hereinabove mentioned.
For and Behalf of:
The Director, Directorate of Economics
&Statistics, Govt. of Maharashtra, Mumbai.
<Agency>.
Signature : Signature :
Name : Name :
Designation: Additional Director, Evaluation,
DES, Mumbai.
Designation:,
WITNESS (Name, Designation, Contact No. & Signature)
1.
2.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 41 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure K: Check-list for the documents to be included
# Documents to be submitted Submitted
(Y/N)
Technical Proposal - Envelope A
1. Annexure A: Bid Cover Letter
2. Online payment receipt of E.M.D. of Rs. 10,000/- &
Online payment receipt of Tender Fee of Rs. 1,000/-
3. Annexure B: Format to share Bidder’s Particulars and contact person’s details
4. Annexure C: Authorisation letter for attending pre-bid meeting (To be
provided on the letter head of Bidder)
5. Annexure D: Format for CV of 3 key staff members proposed
6. Annexure E: Draft Format for activity wise work plan
7. Annexure F: Brief Understanding of conducting evaluation study of Rashtriya
Krishi Vikas Yojna
8. Annexure G: Proposed methodology for evaluation study of conducting
evaluation study of Rashtriya Krishi Vikas Yojna
Commercial Proposal - Envelope B
9. Annexure H: Format for Price schedule
Complete tender document with signature on each page
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 42 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure L: Organisation Structure, Government Resolution
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 43 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 44 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 45 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 46 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 47 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 48 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 49 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 50 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
List of Government Resolution for further reference:
1. शासन ननर्णय क्र.सनिती 2007/प्र.क्र.1/राकृनियो कक्ष, नि. 20/09/2007 https://www.maharashtra.gov.in/Site/Upload/Government%20Resolutions/Marathi/200709201519160
01.pdf
2. शासन ननर्णय क्र. सनिती -2008/प्र.क्र.62/राकृनियो कक्ष, नि. 23/07/2008https://www.maharashtra.gov.in/Site/Upload/Government%20Resolutions/Marathi/2008
0722170446001.pdf
3.शासन ननर्णय क्र. राकृनि -2010/प्र.क्र.39/राकृनियो कक्ष, नि. 15/04/2010 https://www.maharashtra.gov.in/Site/Upload/Government%20Resolutions/Marathi/201004161253090
01.pdf
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 51 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure M: Scheme Related Information
Department/Agencywise and yearwise Projects/Schemes implemented under RKVY
Year Name of Agency Projects/
Schemes
Categeory
Infrastructure Production Special
2012-13 Dir. Extension 12 9 3
Dir. Hoticulture 3 1 2
National Horticulture Mission 5 5
MKV Prabhani 1 1
Soil Conservation 4 3 1
Minor Irrigaton 1 1
Marketing 1 1
Animal Husbandry 3 1 1 1
Dairy development 2 2
Total 32 6 16 10
2013-14 Dir. Extension 13 1 9 3
Dir. QC 9 7 2
Dir. Hoticulture 6 2 2 2
Dir. ATMA 1 1
Dir. Hoticulture 8 8
National Horticulture Mission 5 2 3
MSSCL, Mahabeej Akola 1 1
PDKV, Akola 2 2
Dir. Soil Conservation 5 4 1
Minor irgiation 1 1
Animal Husbandry 6 5 1
Dairy development 1 1
Fisheries 1 1
Sericulture 3 2 1
Total 62 21 31 10
2014-15 Dir. Extension 21 19 2
Dir. QC 2 2
Dir. Hoticulture 6 4 2
Dir. ATMA 1 1
Dir. Hoticulture 25 3 21 1
National Horticulture Mission 4 3 1
Mahabeej, Akola 1 1
PDKV, Akola 9 1 8
BSSKKV, Dapoli 4 2 2
Soil Conservation 5 4 1
MSWC 9 7 2
Animal Husbandry 6 3 3
Dairy development 4 3 1
Fisheries 1 1
Sericulture 2 1 1
Total 100 34 58 8
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 52 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Year Name of Agency Projects/
Schemes
Categeory
Infrastructure Production Special
2015-16 Dir. Extension 16 1 15
Dir. QC 1 1
Dir. Hoticulture 27 26 1
Dir. ATMA 1 1
National Horticulture Mission 3 3
Mahabeej, Akola 2 1 1
MPKV, Rahuri 3 1 2
PDKV, Akola 1 1
MKV, Prabhani 1 1
BSSKKV, Dapoli 2 2
Minor Irrigaton 4 2 2
MSWC 1 1
Animal Husbandry 3 2 1
Sericulture 2 1 1
Total 67 14 50 3
2016-17 Dir. Extension 3 3
Dir. QC 3 2 1
Dir. Hoticulture 2 2
National Horticulture Mission 6 6
Dir. Hoticulture 1 1
Managing Dir. Sugar 1 1
Animal Husbandry 8 7 1
comm. Dairy 7 7
Comm.Fisheries 1 1
Sericulture 2 2
Total 34 29 5 0
2017-18 Dir. Extension 4 4
Dir. QC 6 6
Dir. Hoticulture 4 3 1
NAFED 1 1
National Horticulture Mission 4 3 1
Mahabeej, Akola 1 1
MPKV, Rahuri 1 1
MKV, Prabhani 1 1
BSSKKV, Dapoli 1 1
Marketing Board 4 4
Sugarcane Development 1 1
MSWC 7 7
Animal Husbandry 6 5 1
Dairy development 2 2
Fishery 9 2 7
Total 52 35 17 0
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 53 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
The information regarding projects /schemes of RKVY is attached with it.
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 54 of 104
Sr. No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategeoryStatus of
ProjectBeneficiaries Districts
1 2012-13 2012-13
INTEGRATED
PEST
MANAGEMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
10.73 Production Completed
All Cotton, Soyabean,
Pigeonpea, Paddy and
Chickpea growers of
the State
All Districts
2Project based Agriculture Extension-
Awareness Campaign 2012-13 2012-13 EXTENSION
PROMOTION OF
AGRICULTURE
MECHANISATION
2.00 Production Completed 352 All Districts
3 2012-13 2012-13CROP
DEVELOPMENT
ACTIVITIES
RELATED TO
ENHANCEMENT OF
SOIL HEALTH
60.25 Special Completed 1223Ahmednagar, Beed, Chandrapur,
Hingoli, Nandurbar
4 2012-13 2012-13 CROP
DEVELOPMENT
ACTIVITIES
RELATED TO
ENHANCEMENT OF
SOIL HEALTH
29.77 Special CompletedFarmers selected from
all 33 districtsAll Districts
5 Special Fodder Production Programme 2012-13 2012-13CROP
DEVELOPMENT5.93 Production Completed 24000 All Districts
6Supply of Fodder Crop Seed for
distribution2012-13 2012-13 SEED
PROMOTION OF
AGRICULTURE
MECHANISATION
9.26 Production Completed 96000 All Districts
7 2012-13 2012-13 EXTENSION
ACTIVITIES
RELATED TO
ENHANCEMENT OF
SOIL HEALTH
25.00 Special Completed 6200 All Districts
8 Maize Project 2012-13 2012-13CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
1.93 Production Completed
9 Soybean Project 2012-13 2012-13CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
0.67 Production Completed
10 Pulses Development 2012-13 2012-13CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
13.13 Production Completed 17000 All Districts
11 Sugarcane development Project 2012-13 2012-13CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
0.60 Production desanction 1200 All Districts
12 Cotton Nujeewoodu seeds Project 2012-13 2012-13CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
3.88 Production Completed 2000 All Districts
Dir Extention
Rain fed Area Development
Programmers (RADP)
Initiative for Nutritional Security
through Intensive Millets Promotion
(INSIMP)
Accelerated Fodder Development
Programme
Projectwise information of projects implemented during 2012-13 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
Surveillance and Monitoring of Pest on
Cotton and Soyabean
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 55 of 104
Sr. No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategeoryStatus of
ProjectBeneficiaries Districts
Projectwise information of projects implemented during 2012-13 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
13Special Programme on Oil Palm Area
Expansion (OPAE)2012-13 2012-13 HORTICULTURE
ACTIVITIES
RELATING TO
ENHANCEMENT OF
HORTICULTURAL
PRODUCTION AND
PROMOTION OF
MICRO IRRIGATION
SYSTEMS
1.51 Special Completed 250 All Districts
14 2012-13
INTEGRATED
PEST
MANAGEMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
37.70 Production Completed 2000 All Districts
15 2012-13 2012-13
NATURAL
RESOURCE
MANAGEMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD
CROPS
117.00 Special Completed All Districts
Dir Horticulture
16 Grape Project 2012-13 2012-13 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
0.70 Production Completed 1000 All Districts
17E-content development for specified
cropes. Project 2012-13 2012-13
INFORMATION
TECHNOLOGY
PROMOTION OF
AGRICULTURE
MECHANISATION
0.29 Production Completed 250000 All Districts
18 Onion Project 2012-13 2012-13 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
0.48 Production Completed 1000 5 Districts
19 2012-13 2012-13 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD
CROPS
1.11 Production Completed 2000 Nashik, Ahmednagar, Pune
20 Potato Project (Pepsico) 2012-13 2012-13 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
1.54 Production Completed 1800
National Horticulture Mission
21Development Irrigation potential for
Seed production at MKV Parbhani2012-13 2012-13 10.12
Completed Aurangabad, Jalna, Beed, Latur,
Osmanabad, Nanded, Parbhani, Hingoli
22 Mahatma PhuleJal Bhumi Abhiyan 2012-13 2012-13
NATURAL
RESOURCE
MANAGEMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD
CROPS
45.00 Infrastructure Completed All 33 Districts
23 2012-13MICRO/MINOR
IRRIGATION
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD
CROPS
25.00 Infrastructure Completed 2100 All DistrictsConstruction of Check Dams 2012-13
MKV Parbhani Infrastructure
Tomato Project ( HUL)
Intregated Management of control of
Leaf Blight Diseace(Sigatoka) of Banana2012-13
Vidharbh intensified irrigation
development programme (Hort)
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 56 of 104
Sr. No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategeoryStatus of
ProjectBeneficiaries Districts
Projectwise information of projects implemented during 2012-13 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
24 2012-13
INNOVATIVE
PROGRAMMES/
TRAINING/
CAPACITY
BUILDING/
OTHERS
ACTIVITIES
RELATED TO
ENHANCEMENT OF
SOIL HEALTH 10.61 Infrastructure Completed 5600 All Dsitricts
25 2012-13 2012-13MICRO/MINOR
IRRIGATION
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD
CROPS
135.00 Special Completed
Protctive Irrigation By
Check dam on 30800
ha,70000 ha by Farm
Pond
All Districts
Soil Conservation
26 2012-13 2012-13MICRO/MINOR
IRRIGATION
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD
CROPS
48.00 Special Completed
Minor Irrigation
27 2012-13 Marketing 58.30 Infrastructure Yet not started 100 APMC's All Districts
Marketing
28Goat Development Scheme under 2012-
13 2012-13 2012-13
ANIMAL
HUSBANDRYANIMAL HEALTH 5.10 Special Completed 200 All Districts
29Procurment &distribution of fodder seed
/ sets 2012-13 2012-13
ANIMAL
HUSBANDRY
PROMOTION OF
AGRICULTURE
MECHANISATION
5.00 production Completed Marathwada, Nashik, Pune Region
30 2012-13ANIMAL
HUSBANDRY
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD
CROPS
9.98 Infrastructure Completed 950 Drought prone Districts of the State
Animal Husbundary
31
Advance milk processing infrastructure
development project by MRSDMM
under (NMPS) 2012-13
2012-13 2012-13 Dairy 13.67 Special CompletedFarmer members of
Milk UnionMumbai
32National Mission for protein Supplement
(NMPS) dairy 2012-132012-13 2012-13 Dairy 9.18 Special Completed
Dairy development
Establishment of Silage Making Unit in
Drought affected districts under RKVY
as Drought Mitigation Measures
2012-13
Computerized Auction System and office
Automation for APMC's in the State2012-13
Vidharbh intensified irrigation
development programme (MI)
Foundation Traning Programme on S.C.
& Watershed Management
2012-13
Vidharbh intensified irrigation
development programme (SC)
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 57 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries Districts
1 2013-14 2013-14AGRICULTURE
MECHANISATION
NTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
30.00 Infrastructure Completed 3663 33 Districts of the State
2Project based Agriculture Extension-Awareness
Campaign 2013-14 2013-14 EXTENSION
PROMOTION OF
AGRICULTURE
MECHANISATION
2.00 Production Completed
The Farmers in the
projected crop
clusters will be
benefitted with the
progrmme
All Districts in the State
3 2013-14 2013-14CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
48.00 Special Completed 1.26 Lakh
Nandurbar, Satara, Beed, Osmanabad,
Nanded, Parbhani, Hingoli, Yeotmal, Wardha,
Nashik, Ahmednagar, Pune, Solapur,
Chandrapur, Thane, Raigad, Ratnagiri
4 Accelerated Fodder Development Programme 2013-14 2013-14 ANIMAL
HUSBANDRY
PROMOTION OF
AGRICULTURE
MECHANISATION
25.00 Special Completed Farmers selected
from all 33 Districts
All Districts in State
5 2013-14 2013-14 EXTENSION
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
22.50 Special CompletedFarmers Selected
from semi- arid & sub-
humid districts
All Districts
6 2013-14 2013-14CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
15.50 Production Completed
Small & Marginal Farmers
26 Sugarcane growing Districts in the State
7 2013-14 2013-14 EXTENSION
PROMOTION OF
AGRICULTURE
MECHANISATION
6.60 Production Completed Small & Marginal
Farmers
All districts
8 Intensive sugarcane productivity project 2013-14 2013-14CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
Production Completed Small & Marginal
Farmers
All districts
9 Maize Project 2013-14 2013-14MARKETING AND
POST HARVEST
MANAGEMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
Production Completed
Aurangabad, Jalna, Buldhana, Dhule,
Nandurbar, Nashik, Jalgaon, Ahmednagar,
Sangli, Solapur, Osmanabad, Pune
10 Soybean Project 2013-14 2013-14CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
Production CompletedLatur, Osmanabad, Nanded, Beed, Parbhani,
Buldhana, Amravati, Yavatmal
11 Pulses Development 2013-14 2013-14CROP
DEVELOPMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
Production CompletedSmall & Marginal
Farmers All districts
12 Cotton Jain Irrigation system Project 2013-14 2013-14CROP
DEVELOPMENT Production Completed Small & Marginal
Farmers
All districts
13 Cotton Nujeewoodu seeds Project 2013-14 2013-14CROP
DEVELOPMENT Production Completed Small & Marginal
Farmers
All districts
Dir Extension
14 Strengthing of Taluka seed farm 2013-14 2013-14 SEED
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
2.40 Infrastructure Completed 194194 Taluka Seed Farm in District of
Maharashtra
15
Strengthening of Soil Testing, Bio Fertilizer
Testing Labs and IPM Labs and Distibution of
Soil Health Cards
2013-14 2013-14INTEGRATED PEST
MANAGEMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
1.53 Infrastructure CompletedFarmers/Exporters/Pu
blic
Dhule, Jalgaon, Aurangabad, Parbhani,
Nanded, Amravati, Yeotmal, Buldhana,
Wardha, Ahmednagar
Rain fed Area Development Programmers
(RADP)
Sugercane productivity improvement
Programme
Coarse Cereal Development Programme
Agriculture Mechanization
Initiative for Nutritional Security through
Intensive Millets Promotion (INSIMP)
Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay
Rs.in Cr.
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 58 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries Districts
Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay
Rs.in Cr.
16Establishment / Strengthening of Pesticides
Residue Testing Laboratory2013-14 2013-14 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
0.57 Infrastructure CompletedFarmers, Exporter,
Pune, Nagpur
17Establishment / Strengthening of Seed Testing
laboratory2013-14 2013-14 SEED
PROMOTION OF
AGRICULTURE
MECHANISATION
1.00 Infrastructure Completed Farmers, Exporter,
Public
Pune, Nagpur, Parbhani
18Strengthening of Ferrtilizers
Testing Laborataries2013-14 2013-14
FERTILISERS AND
INM
PROMOTION OF
AGRICULTURE
MECHANISATION
1.50 Infrastructure Completed Farmers, Exporter,
Public
Pune, Nashik, Aurangabad, Amravati,
Kolhapur
19Strengthening of Insecticide Testing
Laborataries2013-14 2013-14
INTEGRATED PEST
MANAGEMENT
PROMOTION OF
AGRICULTURE
MECHANISATION
1.30 Infrastructure Completed Farmers, Exporter,
Public
Pune, Thane, Aurangabad, Amravati
20Extension support for
Strengthening of Agri Polyclinic2013-14 2013-14 EXTENSION
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
3.25 Infrastructure Completed NA All Districts in all Maharashtra
21 Promotion of Organic Farming 2013-14 2013-14ORGANIC
FARMING / BIO
FERTILISER
PROMOTION OF
AGRICULTURE
MECHANISATION
3.00 Production Completed All Category 33 Districts
22Scheme for Production and Strengthening of
Vermi-compost2013-14 2013-14
ORGANIC
FARMING / BIO
FERTILISER
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
Production Completed
Dir QC
23 2013-14 2013-14MICRO/MINOR
IRRIGATION
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
196.89 Infrastructure Completed 67492 26 Districts
24 Automation in drip irrigation system 2013-14MICRO/MINOR
IRRIGATION
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
2.00 Infrastructure Completed 930 33 Districts
25 2013-14 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
0.76 Special Completed All Categories Kolhapur, Sangli, Sindhudurg
26 2013-14 2013-14NATURAL
RESOURCE
MANAGEMENT
70.00 Special CompletedSmall, marginal,
SC/ST farmaers &
other farmers
Buldhana, Akola, Washim, Amravati,
Yeotmal, Wardha, Nagpur, Chandrapur
27 2013-14 HORTICULTURE
ACTIVITIES
RELATED TO
ENHANCEMENT OF
SOIL HEALTH
0.75 Production Completed Individual Farmers &
their Community
All Districts in the Maharashtra State
28
Creation of facilities for online registration of
Grapes, Pomegranate, Vegetables &
Phytosanitary Certification for Export
2013-14 2013-14 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
0.50 Production Completed
Farmers, Exporter,
Agricultural
Exporters, Grower
Exporters, Trader
Exporters
18 Districts & Cell at Commissionerate Level
Dir. Horticulture
29Strengthening of Agriculture extension
management Training Institutes2013-14 2013-14
INNOVATIVE
PROGRAMMES/
TRAINING/
CAPACITY
BUILDING/ OTHERS
INTEGRATED PEST
MANAGEMENT
SCHEMES
Production Completed
30 2013-14 2013-14 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
0.40 Production Completed 400 Nashik, SangliGrape Project(Deepak Fertilizer &
Petrochemical Ltd.)
Dir. ATMA
Geographical Indication Registration of
Agricultural & Horticultural Crops from
Maharashtra State
2013-14
Special Programme on Oil Palm Area
Expansion (OPAE)
Vidharbh intensified irrigation development
programme (Hort)
2013-14
Micro -Irrigation
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 59 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries Districts
Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay
Rs.in Cr.
31 2013-14 2013-14 HORTICULTURE
INTEGRATED PEST
MANAGEMENT
SCHEMES
0.30 Production Completed 3000 Nashik, Sangli
32
Grape Project(MRDBS Pune)
2013-14 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
2.00 Production Completed 97 Nashik, Solapur, Pune
33 Grape Project(Mahindra Subhlabh) 2013-14 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
0.40 Production Completed 500 Nasik, A. nagar, Sangli, Satara, Solapur,
Osmanabad, Latur
34 2013-14 2013-14 HORTICULTURE
INTEGRATED PEST
MANAGEMENT
SCHEMES
0.23 Production Completed 200 Nashik, Solapur, Pune, Ahmednagar
35 2013-14 2013-14 HORTICULTURE
INTEGRATED PEST
MANAGEMENT
SCHEMES
0.30 Production Completed 250 Solapur, Sangli
36 2013-14 2013-14 HORTICULTURE
INTEGRATED PEST
MANAGEMENT
SCHEMES
0.40 Production Completed 300 Kolhapur, Sangli
37 2013-14 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
0.50 Production Completed 500 Kolhapur, Sangli
Dir Horticulture
38 2013-14 2013-14 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
0.28 Production Completed 3000 Jalgaon, Dhule, Nandurbar, Buldhana
39 2013-14 2013-14 HORTICULTURE
PROMOTION OF
AGRICULTURE
MECHANISATION
1.02 Production Completed 2200 Nashik
40 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
7.32 Production Completed 10000 Pune, Nashik, Ahmednagar
41 2013-14 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
100.00 Infrastructure Completed 16000
Nashik, Djule, Jalgaon, Pune, Ahmednagar,
Pune, Satara, Sangli, Aurangabad, Jalna,
Beed, Latur, Parbhani, Osmanabad, Buldhana
42 2013-14 HORTICULTURE 12.00 Infrastructure Completed
National Horticulture Mission
43 2013-14 SEED
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
12.98 Infrastructure Completed 40000 All Districts
MSSCL Mahabeej Akola
44 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
0.99 Infrastructure Completed
The Farmers of the
region through
Department of
Agriculture
All Districts
DNA fingerprinting in citrus. for
“Identification of galgal, rangpur lime and
jambhery rootstock at the nursery stage at
(PDKV)
2013-14
Construction of seed processing plant & seed
warehouses by MSSCL2013-14
Strengthening of Community tank componant
(MIDH)
Onion Storage Structure 2013-14
Tomato Project ( HUL)
Vegetable Project( Daulat Agro) 2013-14
Pomogranate Project ( Deepak Fertilizer)
Banana Project (Desai Fruits & Vegetable)
Banana Project ( B. G. Ghadage Milk
Processing Private Ltd.)
Banana Project(Sanjeevani Agro Coop Society
Ltd.)
White Onion Project (Jain Irrigation)
Grape Project(Rallies India)
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 60 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries Districts
Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay
Rs.in Cr.
45
Establishment of plant tissue culture laboratory
for production of quality planting
Material.(PDKV)
Infrastructure Completed
The Farmers of the
region through
Department of
Agriculture
The Farmers of the region through
Department of Agriculture
PDKV Akola 2013-14 HORTICULTURE
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
6.00
46 2013-14 2013-14NATURAL
RESOURCE
MANAGEMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
20.00 Infrastructure Completed
Small, marginal,
SC/ST farmaers &
other farmers
All Districts
47 Mahatma PhuleJal Bhumi Abhiyan 2013-14 2013-14NATURAL
RESOURCE
MANAGEMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
26.00 Infrastructure Completed
Small, marginal,
SC/ST farmaers &
other farmers
All Districts
48 2013-14 2013-14NATURAL
RESOURCE
MANAGEMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
40.00 Special Completed
Small, Marginal,
SC/ST farmers &
Other Farmers
Buldhana, Akola, Washim, Amravati,
Yeotmal, Wardha, Nagpur, Chandrapur
49 River Valley Project 2013-14 2013-14NATURAL
RESOURCE
MANAGEMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
5.00 Infrastructure Completed
Small, marginal,
SC/ST farmaers &
other farmers,
members of Self Help
Groups
Solapur, Ahmednagar, Satara, Sangli,
Aurangabad, Jalna, Beed,
50
Development of water resources through
construction of rain-water harvesting structure
& Land treatmentat Kiwal, Dist. Satara
2013-14 2013-14NATURAL
RESOURCE
MANAGEMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
1.58 Infrastructure Completed 1474 Satara
Dir. Soil Conservation
51Vidharbh intensified irrigation development
programme (MI)2013-14 2013-14
MiCRO/IRRIGATIO
N 40.00 Special Completed
Minor Irrigation
52Supply of Mini Hatchery Units to Self help
groups in Gadchiroli2013-14 2013-14
ANIMAL
HUSBANDRY
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
0.20 Production Completed 700 Gadchiroli
53Supply of Medicines to the animal’s in Cattle
Camps of Drought Prone Area.2013-14 2013-14
ANIMAL
HUSBANDRY
PROMOTION OF
AGRICULTURE
MECHANISATION
1.30 Production Completed
54Distribution of 100 units of (30 female and 2
male Goats) size in Gadchiroli2013-14 2013-14
ANIMAL
HUSBANDRY
PROMOTION OF
AGRICULTURE
MECHANISATION
2.64 Production Completed 100 Gadchiroli
55 2013-14ANIMAL
HUSBANDRY
PROMOTION OF
AGRICULTURE
MECHANISATION
22.79 Production Completed 1490 All Districts
56 2013-14ANIMAL
HUSBANDRY
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
22.95 Production Completed 2000 All Districts
57National Mission for protein Supplement 2013-
14 ( AH)2013-14 2013-14
DAIRY
DEVELOPMENT
INTEGRATED
DEVELOPMENT OF
MAJOR FOOD CROPS
2.29 Special CompletedFarmer members of
Primary DCS linked
with milk unions
Animal husbundry
Distribution of 40 female & 2 male goat in
DPAP area2013-14
Establishment of broiler units of 1000 birds
capacity2013-14
Vidharbh intensified irrigation development
programme (SC)
National Watershed Development programme
2013-14
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 61 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries Districts
Projectwise information of projects implemented during 2013-14 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay
Rs.in Cr.
58 2013-14DAIRY
DEVELOPMENT13.60 Special Completed
Dairy Department
59National Mission for protein Supplement 2013-
14 (FISHERY)2013-14 2013-14 FISHERIES 9.00 Special
Project not
Implemented
Fisheries
60 2013-14 Sericulture 8.40 Production Completed 8500 26 Districts
61Purchase of Cold Storage at Egg Culture
Production Centre Gadhinglaj, Kolhapur2013-14 2013-14 Sericulture 0.27 Infrastructure Completed
Farmer from
Kolhapur District Kolhapur
62 Mud House (Tusser Granage ) 2013-14 2013-14 Sericulture 4.73 Infrastructure Completed400 Gadchiroli, Gondia, Yeotmal
Sericulture
Cultivation of Mulberry for development of
Silk Industry 2013-142013-14
Strethening and Modernization of Milk Union
(NMPS) (Corrected as per 16 SLSC minutes)2013-14
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 62 of 104
Sr.No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY Project
Cost Categeory Status of Project Beneficiaries Districts
1Project based Agriculture Extension-Awareness
Campaign 2014-15 2014-15 Extension 6.00 Special Completed 16 Lakh
Thane, Raigad, Ratnagiri, Sindhudurg, Nashik,
Dhule, Nandurbar, Jalgaon, Anmednagar, Pune,
Solapur, Satara, Sangli, Kolhapur, Aurangabad,
Jalna, Beed, Latur, Osmanabad, Nanded,
Parbhani, Hingoli, Buldhana, Akola, Amravati,
Washim, Yavatmal, Wardha, Nagpur,
Bhandara, Gondia, Chandrapur, Gadchiroli
2 2014-15 2014-15 Extension 24.77 Production Completed 408750.00
Thane, Raigad, Ratnagiri, Sindhudurg, Nashik,
Dhule, Nandurbar, Jalgaon, Anmednagar, Pune,
Solapur, Satara, Sangli, Kolhapur, Aurangabad,
Jalna, Beed, Latur, Osmanabad, Nanded,
Parbhani, Hingoli, Buldhana, Akola, Amravati,
Washim, Yavatmal, Wardha, Nagpur,
Bhandara, Gondia, Chandrapur, Gadchiroli
3
Accelerated Fodder Development Programme
(Draught Mitigation) (Special)
2014-15 2014-15Crop
Development12.50 Special Completed 193750
Raigad, Nashik, Nandurbar, Jalgaon,
Ahmednagar, Pune, Solapur, Kolhapur,
Aurangabad, Jalna, Beed, Latur, Osmanabad,
Nanded, Parbhani, Hingoli, Buldhana, Washim,
Yeotmal, Chandrapur, Gadchiroli,
4
Accelerated Fodder Development Programme
(Draught Mitigation)(General) 2014-15 2014-15Crop
Development12.50 Production Completed
5
High Density Cotton Development Programme
2014-15 2014-15Crop
Development5.96 Production Completed 17500.00
Nashik, Dhule, Nandurbar, Jalgaon,
Ahmednagar, Aurangabad, Jalna, Beed,
osmanabad, Nanded, Parbhani & Hingoli
6 2014-15 2014-15Crop
Development13.32 Production Completed 9275
Nashik, Dhule, Nandurbar, Jalgaon,
Ahmednagar, Aurangabad, Jalna, Beed,
osmanabad, Nanded, Parbhani & Hingoli,
Pune,Satara, Sangli, Kolhapur, Aurangabad,
Wardha, Nagpur, Yavatmal, Gondia
7
Paddy development Programme
2014-15 2014-15Crop
Development23.12 Production Completed 1 lakh
Thane, Raigad, Nashik, Nandurbar,
Osmanabad, Nagpur, Chandrapur, Gadchiroli,
Gondiya, Bhandara
8 2014-15 2014-15Crop
Development1.07 Production Completed 25000.00
Thane, Raigad, Palghar, Nashik, Nandurbar,
Jalgaon, Aurangabad, Jalna, Beed, Latur,
Osmanabad, Nanded, Parbhani, Hingoli,
Buldhana, Akola, Washim, Amravati,
Yavatmal, Wardha, Nagpur, Chandrapur,
Gadchiroli, Gondiya
9 2014-15 2014-15Crop
Development23.96 Production Completed 120000
Thane, Raigad, Ratnagiri, Sindhudurg, Nashik,
Dhule, Nandurbar, Jalgaon, Kolhapur, Jalna,
Latur,Nanded, Parbhani, Buldhana, Akola,
Amravati, Yavatmal,
10
Maize Project
2014-15 2014-15Crop
Development18.26 Production Completed 1 lakh
Aurangabad, Jalna, Beed, Nashik, Jalgaon,
Dhule, Nandurbar, Amravati, Akola, Yeotmal,
Buldhana, Nagpur, Wardha, Sangli, Satara,
Pune, Ahmednagar, Solapur, Latur,
Osmanabad, Nanded, Parbhani
11Soybean Project
2014-15 2014-15Crop
Development1.54 Production Completed 100000
Latur, Akola, Amravati, Buldhana, Washim,
Wardha, Nagpur, Osmanabad, Beed
12Pulses Development
2014-15 2014-15Crop
Development1.57 Production Completed 50000
Latur, Osmanabad, Beed,
13Rice Projects
2014-15 2014-15Crop
Development0.24 Production Completed 1000
Gadchiroli, 12 blocks in the district
14Rice Projects(Saguna baugh,Chaitanya Rice
Mill, Kamani Oil Mill)2014-15 2014-15
Crop
Development0.74 Production Completed 1000
Gadchiroli
Coarse Cereal Development Programme
Sugercane productivity improvement Programme
Promotion of Hybrid Pigion Pea
(ICPH2740)Through Production Programme
Accelerated Fodder Development Programme
Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 63 of 104
Sr.No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY Project
Cost Categeory Status of Project Beneficiaries Districts
Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
15
Cotton Jain Irrigation system Project
2014-15 2014-15Crop
Development5.79 Production Completed
30000 in 1st
Training & 10000 in
2nd Training
Jalgaon, Dhule, Nandurbar, Aurangabad Jalna,
Beed, Parbhani, Nanded, Hingoli, Akola,
Buldhana, Washim, Amravati, Yeotmal,
Nagpur, Wardha, Chandrapur
16
Cotton Nujeewoodu seeds Project
2014-15 2014-15Crop
Development7.50 Production Completed 39640
Aurangabad, Beed, Jalgaon, Akola, Buldhana,
Amravati, Yavatmal, Parbhnai, Wardha,
Nanded,
17Cotton Project ( Kaweri Seeds)
2014-15 2014-15Crop
Development3.29 Production Completed 41500
Akola, Washim, Buldhana, Amravati,
Yavatmal, Wardha, Parbhani, Hingoli, Beed
18Cotton Project (COTAAP)
2014-15 2014-15Crop
Development0.27 Production Completed 600
Jalgaon
19Rice - III -Gomtesh ( 3 Years)
2014-15 2014-15Crop
Development2.46 Production Completed 5000
Kolhapur
20
Research and Development project to limit the
no. of crop cutting experiments through TOPS
Technology CRIDA Hydrabad (2 Years)2014-15 2014-15 Research 3.77 Production Completed 5600
Jalgaon, Jalna, Aurangabad, Yeotmal, Nagpur,
Latur, Amravati, Nashik, Dhule, Ahmednagar,
Pune, Solapur, Osmanabad, Washim, Akola
21Sugarcane Olam Agro India Ltd Hemarus
Industries Ltd ( 2 Years)2014-15 2014-15
Crop
DevelopmentSugarcane 17.37 Production Completed/Desanctioned 12123
Kolhapur
Dir Extension
22
Strengthening of District Soil Survey & Soil
Testing Labs in Maharashtra 2014-15 2014-15 2.70 Infrastructure Completed29 Government Soil
Testing Laboratory
29 Districts
23 2014-15 11.25 Infrastructure Completed NAPune, Thane, Kolhapur, Nashik, Aurangabad,
Amravati, Nagpur
Dir QC
24
Strengthening of existing centrally sponsored
scheme on Micro Irrigation 2014-15 2014-15
HORTICULTUR
E50.00 Infrastructure Completed 25621
Nashik, Dhule, Nandurbar, Jalgaon,
Ahmednagar, Pune, Solapur, Satara, Sangli,
Kolhapur, Aurangabad, Jalna, Beed, Latur,
Osmanabad, Nanded, Hingoli, Parbhani
25
Additional programme for Micro-Irrigation in
drought like situation affected areas 22
districts.( Mitigate Drought Situation)2014-15 2014-15
HORTICULTUR
E50.00 Infrastructure Completed 25621
Nashik, Dhule, Nandurbar, Jalgaon,
Ahmednagar, Pune, Solapur, Satara, Sangli,
Kolhapur, Aurangabad, Jalna, Beed, Latur,
Osmanabad, Nanded, Hingoli, Parbhani
26 2014-15HORTICULTUR
E6.26 Production Completed Approx. 5 lakhs
Thane, Raigad, Ratnagiri, Sindhudurga, Beed,
Osmanabad, Aurangabad, Latur, Jalna, Nashik,
Ahmednagar, Solapur, Sangli, Satara, Dhule,
Jalgaon, Nanded, Parbhani, Hingoli, Amravati,
Yeotmal, Buldhana, Wardha, Nagpur, Akola,
Washim
27
Vidharbh intensified irrigation development
programme (Hort) 2014-15 2014-15HORTICULTUR
E35.64 Infrastructure Completed
Buldhana,Akola, Washim, Amravati, Yeotmal,
Wardha, Nagpur, Chandrapur, Bhandara,
Gondia
28
Additional programme under Vidharbh
intensified irrigation development programme
(Hort) Additional
2014-15 2014-15HORTICULTUR
E50.00 Infrastructure Completed 25000
Yeotmal, Akola, Amravati, Wardha, Buldhana,
Washim, Nagpur, Chadrapur, Bhandara,
Gondia, Gadchiroli
29
Promotion of export through development of
VEGNET, MANGONET,& Strengthening of
GRAPENET, ANARNET & phytosanetery
Authorities.2014-15
HORTICULTUR
E1.00 Production Completed 30000
Thane, Raigad, Ratnagiri, Sindhudurg, Jalna,
Latur, Aurangabad, Nashik, Jalgaon, Beed,
Ahmednagar, Pune, Satara, Sangli, Solapur,
Osmanabad, Buldhana, Amravati, Nanded &
Phytosanitarty Cell at Commisionarate Level
Dir . HorticultureHORTICULTUR
E
30Strengthening of Agriculture extension
management Training Institutes2014-15 2014-15 3.67 Infrastructure Completed NA
33 Districts
Dir ATMA
31 2014-15 2014-15 Horticulture 0.41 Production Completed
32 2014-15 2014-15 Horticulture 4.49 Production Completed 3000 Nashik, Sangli
33 2014-15 2014-15 Horticulture 0.26 Production Completed 200 Nashik, Solapur, Pune, AhmednagarPomogranate Project ( Deepak Fertilizer)
Grape Project(Deepak Fertilizer & Petrochemical
Ltd.)400 Nashik, Sangli
Grape Project(Rallies India)
2014-15
Horticultural Pest Surveillance, Advisory &
Management project (HORT SAP )
2014-15
Strengthening of Quality Control laboratories
@& residue in for increasing analyzing capacity 2014-15
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 64 of 104
Sr.No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY Project
Cost Categeory Status of Project Beneficiaries Districts
Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
34 PomogranateProject ( Rallies India Ltd) 2014-15 2014-15 Horticulture 1.28 Production Completed 2500 Ahmednagar, Solapur, Nashik
35 Orange Project( Rallies India Ltd) 2014-15 2014-15 Horticulture 0.79 Production Completed 1000 Amravati
36 2014-15 2014-15 Horticulture 1.37 Production Completed 250 Solapur, Sangli
37 2014-15 2014-15 Horticulture 1.47 Production Completed 300 Kolhapur, Sangli
38 2014-15 Horticulture 2.64 Production Ongoing 500 Kolhapur, Sangli
39Cashewnut Project( Asseso Interprises Ltd)
2014-15 2014-15 Horticulture 1.62 Production Completed 500Ratnagiri
40 White Onion Project (Jain Irrigation) 2014-15 Horticulture 5.34 Production Ongoing 3000 Jalgaon, Dhule, Nandurbar, Buldhana
41 2014-15 2014-15 Horticulture 1.70 Production Completed 2200 Nashik
42 2014-15 Horticulture 4.06 Production Completed 2000 Osmanabad, Latur,Beed
43 2014-15 Horticulture 0.19 Production Completed 200 Pune
44 2014-15 Horticulture 0.96 Production Completed 740 Pune, Satara
45 2014-15 Horticulture 2.30 Production Completed 500 Pune
46 2014-15 Horticulture 4.99 Production Completed 435Pune, Ahmednagar, Satara, Buldhana, Jalna,
Osmanabad
47 2014-15 Horticulture 9.16 Production Completed 1000Aurangabad, Jalna, Beed, Latur, Osmanabad,
Parbhani, Nanded, Hingoli
48 2014-15 Horticulture 0.73 Production Completed 450 Thane, Palghar, Pune
49 2014-15 Horticulture 3.39 Production Completed 635 Thane, Latur
50Project On Vegetable Initiatives For Urban
Cluster- Aurangabad 2014-15 2014-15 Horticulture 15.00 Special Completed 5000
Aurangabad, Jalna, Beed, Osmanabad, Latur,
Nanded, Parbhani, Hingoli
51 2014-15 2014-15 NHM 50.00 Infrastructure Completed 16000
Nashik, Djule, Jalgaon, Pune, Ahmednagar,
Pune, Satara, Sangli, Aurangabad, Jalna, Beed,
Latur, Parbhani, Osmanabad, Buldhana
52 2014-15 NHM 20.20 Infrastructure Completed 25 lakh All 33 Districts
53
Financial assistance for Cost of planting
material of flowers and vegetables for poly house
/shed net ( 1 Year)
2014-15 2014-15 NHM 5.00 Production Completed 410
All 33 Districts
54Financial assistance for Green House & Shed
( 1 Year)2014-15 2014-15 NHM 15.00 Infrastructure Completed 410
All 33 Districts
55 2014-15 Horticulture 2.31 Production Completed 500 Satara
Dir. Horticulture
56
To Construct Pack House ( 1 Year)
2014-15 2014-15 NHM 10.00 Infrastructure Completed 571
Thane, Ratnagiri, Sindhudurg, Dhule, Jalgaon,
Nandurbar, Ahmednagar, Pune, Solapur, Satara,
Sangli, Kolhapur, Aurangabad, Jalna, Beed,
Latur, Osmanabad, Parbhani, Hingoli,
Buldhana, Nagpur, Chandrapur
57
Project proposal on Low Cost Onion St orage
Structure ( 1 Year)2014-15 2014-15 NHM 10.00 Infrastructure Completed 1193
Nashik, Dhule, Jalgaon, Ahmednagar, Pune,
Solapur, Satara, Sangli, Kolhapur, Aurangabad,
Jalna, Latur, Osmanabad, Buldhana
58 2014-15 NHM 50.00 infrastructure Ongoing 50000 22 Districts
59 2015-16 Horticulture Fruits 9.16 Production 1000Aurangabad, Jalna, Beed, Latur, Osmanabad,
Parbhani, Nanded, Hingoli
National Horticulture Mission
60 2014-15 2.06 Production Completed
Rainfed area farmers
in Vidharbha,
Marathwada &
Khandesh Cotton
growing Belt
Vidharbha, Marathwada, Khandesh
Mahabeej Akola
61 2014-15 5.00 Production Completed 10000 Jurisdiction of MPKV, Rahuri
62 2014-15 1.47 Production Completed 2625 All the Districts in MPKV Jurisdiction
63 2014-15 0.16 Production Completed 4725 Akola, Amravati, BuldhanaIn-Situ conservation of Minor millets crops in 2014-15
Irrigation water requirment advisory service 2014-15
Training & Demonstrationon Balance fertilizer 2014-15
Development of Transgenic BT cotton Hybrid in
public Sector using Monsanto bollgard-2
Technology 2014-15
Pomogranate Project (Export Quality
Production - Natural organic Fruits & 2014-15
Quality production programme of Strawberry 2014-15
Interventions to save perennial orchads in 2014-15
Strengthening of Community tank componant
(MIDH)
Project based Horticulture Development 2014-15
Pomegranate III (Export Quality Production) 2014-15
Vegetables (Ashvina Trading) 2 years 2014-15
Vegetables V (FPOs) 2014-15
Seed Production of Potato ( 3 Years)2014-15
Exportable Vegetable Project( K.B.) 2014-15
Grape - III ( 2 Years)- KVK Baramati 2014-15
Tomato Project ( HUL)
Onion & Potato Projects( Natural Sugar Allied 2014-15
Vegetable Project( Metro Cash & Carry bear) 2014-15
Banana Project (Desai Fruits & Vegetable)
Banana Project ( B. G. Ghadage Milk Processing
Private Ltd.) Banana Project(Sanjeevani Agro Coop Society Ltd.) 2014-15
2014-15
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 65 of 104
Sr.No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY Project
Cost Categeory Status of Project Beneficiaries Districts
Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
64 2014-15 0.34 Production Completed 2880
Akola, Amravati, Buldhana, Washim, Yeotmal,
Wardha, Nagpur, Gondia, Gadchiroli,
Chandrapur, Bhandara
65 2014-15 0.22 Production Completed 11745
Akola, Amravati, Buldhana, Washim, Yeotmal,
Wardha, Nagpur, Gondia, Gadchiroli,
Chandrapur, Bhandara
66 2014-15 0.37 Production Completed 1080
Akola, Amravati, Buldhana, Washim, Yeotmal,
Wardha, Nagpur, Gondia, Gadchiroli,
Chandrapur, Bhandara
67 2014-15 0.57 Production Completed 1000 11 Districts of Vidharbha Region
68 2014-15 0.87 Production Completed Nil
All 11 districts coming under jurisdiation of Dr.
Panjabrao Deshmukh Krishori Vidyapeeth
69 2014-15 4.36 Infrastructure Completed 50000 Thane, Raigad, Ratnagiri, Sindhudurg
PDKV Akola
70 2014-15 3.10 Infrastructure Completed 6000 All District of Kokan Region
71 2014-15 0.82 Infrastructure Completed
The members of 14
fishermen socieites
of 2 districts
Sindhudurg, Ratnagiri
72 2014-15 3.60 Production Completed 1500 nos./ year All Districts of Maharashtra
73 2014-15 2.13 Production Completed
950 beneficiaries
and 475000 Farmers
would be impacted
Sindhudurg, Ratnagiri, Raigad, Thane
BSKKV Dapoli
74
National Watershed Development programme
2014-15 2014-15 6.65 Infrastructure completed
Nashik, Solapur, Satara, Sangli, Kolhapur,
Jalna, Beed, Latur, Hingoli, Akola, Amravati,
Yeotmal
75 2014-15 2014-15 25.00 Infrastructure Completed 3200 All 33 Districts
76
Additional Programme under Mahatma
PhuleJal Bhumi Sandharan Abhiyan in Drought
like situation affected areas of 22 diatricts (
Mitigate Drought Situation)
2014-15 2014-15 50.00 Infrastructure CompletedFarmers impact as
per works done22 Districts
77 2014-15 2014-15 66.14 Special CompletedBeneficiary Farmers
of 11 Districts
Buldhana, Akola, Washim, Amravati, Yeotmal,
Wardha, Nagpur, Chandrapur, Bhandara,
Gondiya, Gadchiroli
78
Additional Programme under Vidharbh
intensified irrigation development programme (
Mitigate Drought Situation) (SC) Additional2014-15 2014-15 40.00 Infrastructure Completed
Smaall, Marginal,
SC/ST farmers
actually benefitted &
Other Farmers
Vidharbha Region
Soil Conservation
79
Vidharbh intensified irrigation development
programme (MI) 2014-15 2014-15 48.22 Special Completed 474
Yavatmal, Akola, Amravati, Wardha, Buldhana,
Washim, Nagpur, Chandrapur, Bhandara,
Gadchiroli and Gondia.
80
Additional programme under Vidharbh
intensified irrigation development programme
(MI) Additional2014-15 2014-15 60.00 special Completed
Small, Marginal
SC/ST Farmers
actually benefitted &
other Farmers
11 Districts in Vidharbha Region
81 2014-15 0.11 Infrastructure OngoingIndirect benefit to
farmers
Ahmednagar (Rahata Tahsil)
82 2014-15 6.03 Infrastructure Ongoing 27000 Amravati
83 2014-15 1.50 Infrastructure Completed 50000 Beed
84 2014-15 5.81 Infrastructure Ongoing100000 farmers
indirectly
Satara (Karad Tahsil)
85 2014-15 0.39 Infrastructure Ongoing 200 Ratnagiri , Sindhudurg
86 2014-15 16.70 Infrastructure Ongoing Approx 15000 p.a. 24 Districts
87 2014-15 4.34 Infrastructure Completed 20000 Satara, Latur, Ahmednagar, Pune
MSWC
Establishment of Cleaning & Grading facility at 2014-15
Establishment of warehouses at 20 Primary 2014-15
Development of Marketing Infrastructure 2014-15
Infrastructure Development at Agricultural
produce Marketing Committee,Karad. 2014-15
To conduct large scale front line demonstration 2014-15
Development of Weekly Bazar at Loni, Tal.
Rahata Dist Ahmednagar2014-15
Establishment of Marketing Infrastructure at 2014-15
Vidharbh intensified irrigation development
programme (SC)
Mahatma Phule Jal Bhumi Abhiyan
Strengthening of Fisheries extension by 2014-15
Production of Konkan Kanyal goat in Konkan
region 2014-15
Innovative Water Resources development for 2014-15
Production of different Bio-fertilizers in BSKKV 2014-15
Establishment of Circular hatchery for Crap
seed production2014-15
Enterpreneuship & skill development through 2014-15
Barcoding of varities & landraces in purview of
protection of plant varities & farmers act2001 2014-15
Seed production training in field &
Horticultural crop to farmers extension workers
& stakeholders in Vidarbh region
2014-15
Crop diversificatin in Vidarbh region under seed
spice crop 2014-15
Quality seed production & promotion of newly
developed varities at Dr. PDKV , Akola 2014-15
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 66 of 104
Sr.No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY Project
Cost Categeory Status of Project Beneficiaries Districts
Projectwise information of projects implemented during 2014-15 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
88 2014-15 10.00 Production Completed 660 all districts
89 2014-15 0.79 Infrastructure Completed 50000 Farmers All Districts of Maharashtra
90 2014-15 2.55 Infrastructure Completed 1000
Nagpur, Akola, Gondia, Wardha, Gadchiroli,
Buldhana, Yeotmal, Amravati, Bhandara,
Chandrapur
91 2014-15 4.31 production CompletedSmall & Marginal
Farmers Pune, Akola
92
Establishment of Stall -fed 40+2 Goat Units in
DPAP area in Maharashtra ( 2 Years) 2014-15 2014-15 17.55 production Ongoing 894 25 Districts to be covered
93 2014-15 1.32 Infrastructure Ongoing 5000 5 Districts Covered
Animal Husbundry
94
Infrastructure Development of Dairy product
manufacturing Unit of Maharashtra State Co-
Op. Milk Fed. LTD. (MRSDMM Mahanand)
Mumbai (NMPS)
2014-15 2014-15 8.00 Special Completed 24 lakh All Districts
95 2014-15 12.33 Infrastructure Completed 50000 Kolhapur
96 2014-15 12.45 Infrastructure Completed 385000 Kolhapur
97 2014-15 5.00 Infrastructure Completed 23000 Sangli
Dairy
98National Mission for protein Supplement
(FISHERY)2014-15 2014-15 0.00 Special Completed
Fishery
99 2014-15 2.76 Infrastructure Completed 8000 23 Districts
100Tasar Development through quality seed
production in Maharashtra2014-15 3.27 Production Completed 6000
6 Districts (not mentioned)
Sericulture
2014-15
Development of Cocoon Market & model 2014-15
Establishment of Milk byproduts byYashwant 2014-15
Establishment of Satellite Dairy milk processing 2014-15
Modernization of Milk processing unit & ETP at 2014-15
Prevention & Therapeutic Management for 2014-15
Establishment of training centre for field 2014-15
Establishment of training & Demonstration
centreon commercial poultry farming under
MAFSU
2014-15
Fodder production at farms of MLDB, Ship &
Goat Dev. Carporation of Maharashtra2014-15
Stall fed 40+2 goat unit by Punyashlok Ahilydevi 2014-15
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 67 of 104
Sr. No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries
Districts
1 2015-16 2015-16 Extension 4.57 Production CompletedAll Farmers of the
StateAll Districts
2015-16 2016-17 ExtensionTRAINING/
STUDY TOUR4.57 Completed
2 2015-16 2015-16 ANHB FEED AND
FODDER 25.00 Production Completed 412500
Nashik, Dhule, Jalgaon, Nandurbar, Ahmednagar,
Pune, Solapur, Satara, Kolhapur, Aurangabad, Jalna,
Beed, Latur, Osmanabad, Nanded, Parbhani, Hingoli,
Buldhana, Akola, Amravati, Washim, Yavatmal,
Wardha, Nagpur, Bhandara, Gondia, Chandrapur and
Gadchiroli
3 2015-16 Crop Development Other 10.00 Infrastructure Completed 16667 All 34 districts
4 2015-16 2015-16 Crop Development Coarse Cereals 2.25 Production Completed 25000
Thane, Raigad, Palghar, Nashik, Nandurbar, Jalgaon,
Aurangabad, Jalna, Beed, Latur, Osmanabad, Nanded,
Parbhani, Hingoli, Buldhana, Akola, Washim,
Amravati, Yavatmal, Wardha, Nagpur, Chandrapur,
Gadchiroli, Gondiya
5
Integrated Paddy Development Programme
2015-16 2015-16 Crop Development Paddy 7.35 Production Completed 1177500
Thane, Raigad, Nashik, Sindhudurg, Nandurbar,Pune,
Nagpur, Bhandara, Osmanabad, Chandrapur,
Kolhapur, Gondia, Gadchiroli
6
Promotion of Pulses through Inter- cropping
2015-16 2015-16 Crop Development Oilseed & Pulses 5.50 Production Completed 312500
Thane, Raigad, Palghar, Nashik, Sindhudurg,
Nandurbar, Jalgaon, Aurangabad, Jalna, Beed, Latur,
Osmanabad, Nanded, Parbhani, Hingoli, Buldhana,
Akola, Washim, Amravati, Yavatmal, Wardha,
Nagpur, Chandrapur
7 2015-16 Crop Development Cotton 4.55 Production Completed 12500
Nashik, Dhule, Nandurbar, Jalgaon, Ahmednagar,
Aurangabad, Jalna, Beed, osmanabad, Nanded,
Parbhani & Hingoli
8An operational piolet project in Maharashtra
(CGIAR - CCAFS) 2015-16 2015-16 ReserchAgri. Research
Project0.57 Production Completed
Research project
hence no direct
beneficiaries
Osmanabad, Yeotmal
9
Incresing farmers satisfaction with crop insurance
in Maharashtra,developing novel science &
technology base scheme (CGIAR)
2015-16 2015-16 ReserchAgri. Research
Project1.35
Production and
growthCompleted
Research project
hence no direct
beneficiaries
All Districts of Maharashtra
10
Historical & operational satelite derived
information for crop insurance contract in
Maharashtra (E mausam)
2015-16 2015-16 ReserchAgri. Research
Project1.34
Production and
growthCompleted 25000
Aurangabad
11
Villege level crop insurance piolet project using
satelite remote sencing & unmaned arial vehical
(Drone) technology (Skymet)
2015-16 2015-16 ReserchAgri. Research
Project0.63
Production and
growthCompleted
Osmanabad, Yeotmal, Aurangabad, Akola
12Inspection of piolet villege level index insurance
(Swissray)2015-16 2015-16 Reserch
Agri. Research
Project0.21
Production and
growthCompleted 45000-50000
Yavatmal, Aurangabad, Osmanabad, Akola
13Rice (VST Tillers)
2015-16 2015-16 Crop Development Paddy 0.93Production and
growthCompleted 2000
Bhandara, Gondia, Gadchiroli, Chandrapur, Nagpur,
Thane
14Rice (Saguna Bagh - Karjat)
2015-16 2015-16 Crop Development Paddy 2.02Production and
growthCompleted 2000
Raigad, Palghar, Thane, Ratnagiri, Sindhudurg,
Kolhapur, Satara, Sangli, Pune, Nashik
15Cotton - I (COTTAP)
2015-16 2015-16 Crop Development Cotton 0.34Production and
growthCompleted 1500
Jalgaon
16Cotton -II (Bayer Crop Sciences)
2015-16 2015-16 Crop Development Cotton 0.81Production and
growthCompleted 2500 to 3500
Akola, Wardha, Yeotmal, Jalna, Nanded
Dir Extension
Cotton HDPS
2015-16
Accelerated Fodder Development Programme
Installation of infrasture units of hydrophonix
technology of low cost green fodder production
2015-16
Promotion of Hybrid Pigion Pea
(ICPH2740)Through Production Programme
Project based Agriculture Extension-Awareness
Campaign
Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 68 of 104
Sr. No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries
Districts
Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
17
Construction of Building for Insecticide & Bio-
Pesticide Testing Laboratory, Thane 2015-16 2015-16 IPMT
PROMOTION OF
BIO-
FERTILISERS
1.11 Infrastructure Completed
Seven Districts have
been directly and
indirectly benefited
Mumbai Sub Urban, Thane, Palghar, Raigad,
Ratnagiri, Nashik, Dhule, Nandurbar,
Dir. Q.C
18
Vidharbh intensified irrigation development
programme (Hort)2015-16 2015-16
Minor/ Micro
Irigation
DEVELOPMENT
OF
HORTICULTUR
E FARMS/
FACILITIES
50.00 Special Completed
No. of beneficiary
farmers (11
Districts)
Amravati, Yeotmal, Wardha, Nagpur, Chandrapur,
Bhandara, Gondiya, Gadchiroli, Akola, Washim,
Buldhana
19 2015-16 Horticulture
DEVELOPMENT
OF
HORTICULTUR
E FARMS/
FACILITIES
13.38 Production Completed Approx. 5 lakhs
Thane, Raigad, Ratnagiri, Sindhudurg, Solapur,
Ahmednagar, Sangli, Satara, Nashik,
20 2015-16 Crop DevelopmentCOARSE
CEREALS4.74 Production Completed 7000 Aurangabad
21 2015-16 Crop Development Oilseed & Pulses 0.74 Production Completed 700 Latur, Osmanabad, Beed
22 2015-16 Crop Development Oilseed & Pulses 1.49 Production Completed 100000Latur, Akola, Amravati, Buldhana, Washim, Wardha,
Nagpur, Osmanabad, Beed
23 2015-16 Horticulture Vegetable 0.45 Production Completed 179 Farmers Yearly Gevarai, Lambkanwadi
24 2015-16 Horticulture Vegetable 2.99 Production Completed 550 Farmers Yearly Buldhana and Jalna
25 2015-16 Horticulture Vegetable 6.14 Production Completed 2000 Aurangabad, Jalna, Jalgaon
26 2015-16 Crop Development Vegetable 1.57 Production Completed 3500 Ahmednagar, Buldhana
27 2015-16 Other #REF! 6.60 Production Completed 1251 Satara, Sangli
28 2015-16 Horticulture Fruits 2.47Production &
growthCompleted 1200
Jalgaon
29 2015-16 Crop Development Cotton 0.42 Production Completed 14000 Yavatmal
30Collaborative Project for Cotton Mechanization
for state of Maharashtra (John Deere)2015-16 2015-16 Crop Development Cotton 0.01 Production Completed 1500
Akola
31 2015-16 1.35 Production CompletedNo direct
beneficiary
All districts of Maharashtra
32
Historical & operational satelite derived
information for crop insurance contract in
Maharashtra
2015-16 2015-16 1.34 Production Completed 25000
Aurangabad
33 2015-16 0.63 Production CompletedNo individual
beneficiariesOsmanabad, Yavatmal
34 Inspection of pilot village leve index insurance 2015-16 2015-16 0.21 Production Completed 45000 Aurangabad,Osmanabad, Akola,Yavatmal
35 2015-16 0.93 Production Completed 2000Bhandara, Gondia, Gadchiroli, Chandrapur, Nagpur,
Thane
36 2015-16 2.02 Production Completed 2000Raigad, Palghar, Thane, Ratnagiri, Sindhudurg,
Kolhapur, Satara, Sangli, Pune, Nashik
37 2015-16 Horticulture Vegetable 0.67 Production Completed 500 Pune
38 2015-16 Horticulture Vegetable 4.10 Production Completed 1250 Kolhapur
39 2015-16 Horticulture Vegetable 1.96 Production Completed 500 Pune
40 2015-16 Horticulture Vegetable 0.16 Production Completed 2000 Jalgaon, Dhule, Nandurbar, Buldhana
41 2015-16 Horticulture Fruits 14.41 Production Completed 200 Nasik, Sangli, Solapur, Pune
42 Cotton - I (COTTAP) 2015-16 2015-16 0.34 Production Completed 1500 Jalgaon
43 2015-16 0.81 Production Completed 2500 to 3500 Akola, Wardha, Yeotmal, Jalna, NandedCotton -II (Bayer Crop Sciences) 2015-16
Vegetable (Kay bee Exports) 2015-16
White Onion Project (Jain Irrigation) 2015-16
Financial Assistance hiring of machinery for
viticulture management (MRDBS) - Grapes
2015-16
Rice (Saguna Bagh - Karjat)2015-16
Tomato (Krushi Jeevan Agro Farmer producer
Com. Narayangaon)
2015-16
Potato, Baraphawala Agro Processors,
Gadhhinglaj
2015-16
Increasing farmers satisfaction with crop
insurance in Maharashtra,developing novel
science & technology base scheme
2015-16
Village level crop insurance piolet project using
satelite remote sencing & unmaned arial vehical 2015-16
Rice (VST Tillers)2015-16
Jaggery (Shrikant Agro Industries) 2015-16
Processing of Banana Pseudo -stem into value
added products in Jalgaon (Tapti Valley Banana 2015-16
Improving lives of Cotton Growing farmers in
Vidarbha, (AFPRO, BCI)
2015-16
Vegetable Seed Production (East West Seed
India)
2015-16
Vegetable (Akash Agri Solutions) 2015-16
Green peas (Trimurti Foodtech & Advanta Ltd.) 2015-16
Pulses Productivity Improvement & Value Chain
(Rallis India Limited)2015-16
Value Chain Development in Soybean (ADM
Agro industries India Pvt Ltd)2015-16
Onion Seed Production (East West Seed India) 2015-16
Integrated Development of Horticulture/
Agriculture American Sweet Corn-Kernels, 2015-16
Horticulture Crop Pest Surveillance, Advisory and
Management Project (HORTSAP)2015-16
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 69 of 104
Sr. No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries
Districts
Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
44Processing of Banana Pesudo -stem into value
added products in Jalgaon Dist .2015-16 2015-16 2.47 Production Completed 1200
Jalgaon
Dir Horticulture
45
Training & Capacity Building Programme for
field Functionaries & ATMA Committee at
VANAMATI & RAMETI
#REF! 2015-16 #REF! #REF! #REF! Infrastructure Completed 403
All 33 Districts
Director ATMA
46 2015-16 NHM Farm ponds 25.00 Infrastructure Completed 3000
Akola, Amravati, Washim, Yeotmal, Buldhana,
Wardha, Aurangabad, Nagpur, Chandrapur,
Gadchiroli, Gondiya, Bhandara, Jalna, Beed, Latur,
Nanded, Parbhani, Hingoli, Osmanabad
47Financial assistance for Protected Cultivation
Project2015-16 2015-16 Horticulture
NURSERIES
AND GREEN
HOUSES
25.00 Infrastructure Completed 700All Districts
48 Low Cost Storage Structure for Onion. 2015-16 2015-16Marketing & Post
HarvestPOST HARVEST 25.00 Infrastructure Completed 2857 10 Districts of Maharashtra
NHM
49 2015-16 Seed Seed Distribution 20.38 Production Completed 220000
Akola, Amravati, Washim, Yeotmal, Buldhana,
Wardha, Aurangabad, Nagpur, Chandrapur,
Gadchiroli, Gondiya, Bhandara, Jalna, Beed, Latur,
Nanded, Parbhani, Hingoli, Osmanabad, Raigad,
Thane, Kolhapur, Satara, Sangli, Dhule, Jalgaon,
Nashik, Ahmednagar, Pune, Solapur
50
Construction of Solar Power operated multi
chamber Air Conditioned and dehumidified seed
storage 1,000 MT capacity2015-16 2015-16 Seed
SEED
PROCESSING
CENTERS AND
STORAGE
1.80 Infrastructure Completed 100000
Akola, Amravati, Washim, Yeotmal, Buldhana,
Wardha, Aurangabad, Nagpur, Chandrapur,
Gadchiroli, Gondiya, Bhandara, Jalna, Beed, Latur,
Nanded, Parbhani, Hingoli, Osmanabad, Raigad,
Thane, Kolhapur, Satara, Sangli, Dhule, Jalgaon,
Nashik, Ahmednagar, Pune, Solapur
Mahabeej Akola
51 2015-16 Extension
KVKs /
KNOWLEDGE
CENTRES /
DISSEMINATIO
N
5.90 Production Ongoing 5550
Ahmednagar, Satara, Sangli, Kolhapur, Nashik, Pune,
Solapur, Dhule, Nandurbar, Jalgaon
52 2015-16 NRM
CONSERVATIO
N STRUCTURES
AND
WATERSHED
DEV
1.19 Infrastructure Completed 460
Khed, Maval, Ambegaon in Pune District
53 2015-16 NRMLAND
RECLAMATION1.39 Production Completed
200 farmers willl be
directly impacted &
about 10000 farmers
will be indirectly
benefiitted
10 Districts of Western Maharashtra
Rain-Runoff Water Harvesting Storage Tanks for
Smallholder Farming Systems2015-16
Enhancement of ground water recharge through
open and bore wells2015-16
Farmer FIRST
2015-16
Production growth Stream project "Foundation
and Certified Seed Production & Distribution of
new Varieties of Pulses, Oil seeds, Cereals,
Vegetables seeds" 2015-16
Strengthening of existing component of new
community tank (MIDH)under the RKVY 2015-
16 in vidharbha & Marathwada region2015-16
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 70 of 104
Sr. No Name of AgencySLSC Sanction
YearReport Year Sector Sub sector
RKVY
Project
Cost
CategoryStatus of
ProjectBeneficiaries
Districts
Projectwise information of projects implemented during 2015-16 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay, Mumbai
Rs.in Cr.
MPKV Rahuri
54 2015-16 Extension
NEW
APPROACHES
TO EXTENSION
9.01 Production Ongoing 5550
Aurangabad, Jalna, Beed, Latur, Osmanabad, Parbhani,
Nanded, Hingoli
PDKV Akola
55 2015-16
KVKs /
KNOWLEDGE
CENTRES /
DISSEMINATION
New 4.60 Production Ongoing 5550
Aurangabad, Jalna, Beed, Latur, Osmanabad, Parbhani,
Nanded, Hingoli
MKV Parbhani
56 2015-16 Crop Development
NEW
APPROACHES
TO EXTENSION
1.12 Production Ongoing 4950
Ratnagiri and Sindhudurg
57 2015-16 Horticulture Area Expansion 0.53 Production Completed 520 Ratnagiri and Sindhudurg
BSSKV Dapoli
Mahatma PhuleJal Bhumi Abhiyan
2015-16 NRM
WATER
CONSERVATIO
N STRUCTURES
AND
WATERSHED
DEV
75.00 Infrastructure CompletedFarmers impact as
per works done
All Districts
2011-12MICRO/MINOR
IRRIGATION
INNOVATIVE
SCHEMES25.00 Infrastructure Completed
59 2015-16 2015-16 NRM
WATER
CONSERVATIO
N STRUCTURES
AND
WATERSHED
DEV
37.50 Special Completed
No. of beneficiary
farmers (11
Districts)
Amravati, Yeotmal, Wardha, Nagpur, Chandrapur,
Bhandara, Gondiya, Gadchiroli, Akola, Washim,
Buldhana
60 2015-16 2015-16
PERCOLATION
TANKS/ MINOR
IRRIGATION
TANKS
New 37.50 Special Completed
No. of beneficiary
farmers (11
Districts)
Amravati, Yeotmal, Wardha, Nagpur, Chandrapur,
Bhandara, Gondiya, Gadchiroli, Akola, Washim,
Buldhana
Minor Irrigation
61 2015-16 Marketing & PHM
settting
up/strengthening
of Market
infrastructure
10.22 Infrastructure completed 12000
Nagpur, Wardha, Amravati, Akola, Yavatmal
MSWC
62 2015-16 ANHBBreed
Development146.00 Production Ongoing
26.29 lakh farmers
would be impactdAll Maharashtra
63
Expansion and modernization of main dairy and
establishment of chilling center at Bhavan Tal-
Sillod Dist- Aurangabad
2015-16 2015-16 Dairy Milk Processing 10.27 Infrastructure Completed 60000
Aurangabad
64 2015-16 Dairy Milk Processing 11.52 Infrastructure Completed 15000 Kolhapur
Animal Husbundry
65 2015-16 SericultureCocoon
Production8.36 Production Completed 7000 All Districts
66 2015-16 Sericulture Other 0.42 Infrastructure Ongoing 100 All Districts
Sericulture
Project for increasing Mulberry Plan-tation for
development of Silk Industry In Maharashtra2015-16
Project for distribution of Handloom to Farmers
for development of Sericulture In Maharashtra
2015-16
Establishment of Milk Processing Plant (Satellite
Dairy) at Gadhinglaj Shree Warana Sahakari
2015-16
Improving A. I. Delivery System 2015-16
Establishment of Warehousing Infra-structure,
Online Trading & pledge loan Facility of
Backward & Suicide Prone district of the
2015-16
Vidharbh intensified irrigation development
programme (MI)
Vidharbh intensified irrigation development
programme (SC)
582015-16
Construction of Check Dams 2011-12
Transfer of integrated crop manage-ment and
technologies developed by BSKKV Dapoli 2015-16
Capacity Building for Farmers of Konkan for
Commercial Cultivation of Manga Bamboo
2015-16
Transfer of integrated crop management
technologies developed by MKV2015-16
Transfer of integrated crop management and
technologies developed by PDKV Akola 2015-16
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 71 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report Year Sector Sub sector
RKVY
Project
Cost
Category Status Beneficiaries Districts
1 2015-16
Crop
Developm
ent
Coarse Cereals 3.24 Production Ongoing 16667
Nasik, Dhule, Nandurbar, Jalgaon, Ahanednagar,
Aurangabad, Jalne, Beed, Osmanabad, Nanded,
Parbhani, Hingoli,
2 2015-16
Crop
Developm
ent
Paddy 9.00 Production Ongoing
89155
Nasik, Dhule, Nandurbar, Jalgaon, Ahanednagar, Pune,
Sangli, Aurangabad, Jalne, Beed, Latur, Osmanabad, Nanded,
Parbhani, Hingoli, Buldhana, Akola, Washim, Amravati,
Yavatmal, Wardha, Nagpur, Bhandara, Gondia, Chandrapur,
Gadchiroli
3
To set up training center at KVK
Gadchiroli for Rice mechanization in
PPP-IAD with V.S.T. Tillers
2016-17 2016-17
Crop
Developm
ent
Paddy Production Ongoing 1876 Gadchiroli
Dir Extension
4 Upgradation of District Soil Survey, Soil
Testing Lab. in Maharashtra State.
2016-17 2015-16 IPMTSoil Testing
Lab7.60 Infrastructure Ongoing
29 Government
Soil Testing
Laboratory
29 Districts
5 2015-16
Crop
Developm
ent
Cotton 0.50 Production Ongoing NA
Ahamednagar, Aurangabad, Jalgaon, Dhule,
Parbhani, Nanded, Buldhana, Amravati ,Yavatmal,
Wardha
6 2016-17 Lab 9.45 Infrastructure Ongoing
The Farmers of
all districts will
be benefitted
indirectly
Thane, Nasik, Kolhapur, Pune, Aurangabad,
Parbhani, Nagpur, Amravati
Dir Quality Control
7
Vidharbh intensified irrigation deve-
lopment programme (Horticulture -
Micro Irigation)2016-17 2015-16
Minor/
Micro
Irigation
DEVELOPME
NT OF
HORTICULT
URE FARMS/
FACILITIES
50.00 Infrastructure Ongoing 23336Buldhana, Akola, Washim, Amravati, Yeotmal,
Wardha, Gondiya, Gadchiroli, Bhandara
8 2015-16
Minor/
Micro
Irigation
#REF! 50.00 Infrastructure Ongoing 22678 Beed, Aurangabad, Jalna, Osmanabad, Nanded,
Hingoli, Latur, Parbhani,
Dir Horticulture
9
Training & Capacity Building
Programme for field Functionaries &
ATMA Committee at VANAMATI &
RAMETI
2016-17 2016-17 ExtensionTRAINING/
STUDY TOUR5.99 Infrastructure Ongoing
total 6335 officers
and other staff
trained , toal number
of trainings
conducted is 219
All District
10 2015-16Horticultur
e
NURSERIES
AND GREEN
HOUSES
50.00 Infrastructure Ongoing 520 All districts
11Protected Cultivation Project
(Committed liabilities)2016-17 2016-17 11.90 Infrastructure Ongoing
167Kolhapur
Projectwise information of projects implemented during 2016-17 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Financial assistance for Protected
Cultivation Project2016-17
Mirco Irrigation Programme for
Marathwada Region 2016-17
Strengthening of state Bio control & Bio
fertilizer Laboratories2016-17
Field trials of straight varieties of cotton
(BG-1) 2016-17
Promotion of Hybrid Pigion Pea
(ICPH2740)Through Production
Programme
2016-17
Integrated Paddy Development
Programme2016-17
Rs.in Cr.
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 72 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report Year Sector Sub sector
RKVY
Project
Cost
Category Status Beneficiaries Districts
Projectwise information of projects implemented during 2016-17 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Rs.in Cr.
12 2015-16
Marketing
& Post
Harvest
Storage Facility 25.00 Infrastructure Ongoing 2857
Nashik, Dhule, Jalgaon, Nandurbar, Pune,
Ahmednagar, Solapur, Satara, Sangli, Aurangabad,
Jalna, Beed, Latur, Parbhani, Osmanabad, Akola,
Buldhana
13
Plastic linning to farm ponds
2016-17 2016-17
Crop
Developm
ent
35.00 Infrastructure Ongoing
4620
All 34 Districts of Maharashtra
14 2015-16 Infrastructure Ongoing 3300 All 34 Districts of Maharashtra
National Horticulture Mission 2016-17 2016-17
15 2016-17 Infrastructure Ongoing All Districts of Maharashtra
Director Horticulture
16 2016-17 2016-17 AMEC
Machine &
equipment
assistance
8.00 Infrastructure Ongoing
22
Excluding Kokan division all district
Managing Dir Sugar
17 2015-16 ANHB Poultry 22.83 Infrastructure Ongoing 6089 14 Districts of Vidharbha and Marathwada
18Distribution of electrified Chaff Cutter
2016-17 2015-16 ANHBFEED AND
FODDER24.11 Infrastructure Ongoing
3110834 Districts of State
19 2016-17 ANHB 3.75 Infrastructure Ongoing
Entire
communities
involved in
rearing of small
ruminants.
All District
20 2016-17 ANHB 1.01 Infrastructure Ongoing 200 Aurangabad, Jalgaon, Amaravati and Solapur
21 2016-17 ANHB 4.63 Infrastructure Ongoing
All farmers
having Livestock
& poultry of the
Maharashtra state
& other states All Districts
22 2016-17 ANHB 4.13 Production Ongoing 1000 All Districts
23 2016-17 ANHB 70.00 Infrastructure Ongoing
All farmers
having Livestock
& poultry of the
Maharashtra state
& other states All Districts
24 2016-17 ANHB 16.51Infrastructure
Ongoing 8000 Parbhani, Hingoli, Nanded, Beed, Jalna, Aurangabad
Animal Husbundry
25 2015-16 Dairy 12.35 Infrastructure OngoingAll over Jalgaon
district Jalgaon
Modernization and Capacity
enhancement of dairy unit of Jalgaon 2016-17
Creation of BSL-III Laboratory for Avian
Influenza and other Zoontic pathogens at
Disease Investigation Section,
Aundh,Pune 7 (DIS) 2016-17
Strengthening & Modernization of
Teaching Veterinary Clinical Complex. 2016-17
Establishment of Ram & Buck rearing
centers
2016-17
Establishment a National Referance
Testing Laboratory for Veterinary
Biological in Institute of Veterinary
Biological Products, Aundh, Pune 7
(IVBP)
2016-17
Cultivation of Perennial Fodder Crops &
Silage Production
2016-17
Providing Backward & Forward Linkage
for Encouraging Poultry
2016-17
Strengthening of Sheep & Goat breeding
farms (Padegaon (Aurangabad), Bilakhed
(Jalgaon), Dahiwadi (Satara), Ambejogai
(Beed), Mahud (Solapur))
2016-17
Mechanization Harvesting in Sugarcane
25.00
25.003880Assistance for Mechanization in
Horticulture under RKVY
2016-17
Low Cost Storage Structure for Onion
2016-17
Financial assistance for indivisual farm
pond linning
2016-17
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 73 of 104
Sr.No Name of Agency
SLSC
Sanction
Year
Report Year Sector Sub sector
RKVY
Project
Cost
Category Status Beneficiaries Districts
Projectwise information of projects implemented during 2016-17 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Rs.in Cr.
26 2015-16 Dairy 12.13 Infrastructure OngoingAll over Jalgaon
district Jalgaon
27 2015-16 Dairy 8.70 Infrastructure Ongoing 80000 Mumbai
28 2015-16 Dairy 8.80 Infrastructure Ongoing 20000
Aurangabad, Jalna, Beed, Latur, Osmanabad,
Nanded, Parbhani, Hingoli, Buldhana, Amravati,
Yavatmal, Wardha, Nagpur, Bhandara, Gondia,
Chandrapur, Gadchiroli, Washim, Akola
29 2015-16 Dairy 3.30 Infrastructure Ongoing 10000 Sangli
30 2015-16 Dairy 1.03 Infrastructure OngoingAll over
Kolhapur district Kolhapur
31 2015-16 Dairy 0.77 Infrastructure OngoingAll overKolhapur
district Kolhapur
Comm Dairy
32 2016-17 Dairy
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
107.00 Infrastructure Ongoing 3253 Mumbai subburban
Comm Fisheries
33 2015-16 Sericulture 10.98 Infrastructure Ongoing 58000 All districts
34Development of Cocoon Market at Jalna
2016-17 2016-17 Sericulture other 6.20 Infrastructure Ongoing6670
All Districts
Sericulture
Establishment of Rearing Houses For
Development of Silk Production in
2016-17
Providing infrastructure & post
harwesting facility to fishermen at 6 fish
landing centers2016-17
Financial Assistance for Expansion &
Modernization of existing Dairy at
2016-17
Capital investment subsidy for
reprocessing of skim milk mpowder to
improve it's self life (Warna Sahakari
Dudh Utpadak Sangh,Kolhapur)
2016-17
Capital investment subsidy for
reprocessing of skim milk mpowder to
improve it's self life (Kolhapur Dist
Sahakari Dudh Utpadak Sangh,Kolhapur)
2016-17
Modernization and Capacity
enhancement of the milk processing and 2016-17
Establishment of new dairy plant and
milk byproduct unit at Nerul, Navi
2016-17
Project for strengthening of dairy sector
in 11 districts of Vidharbha &
Marathwada region 2016-17
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 74 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
1
Agriculture Awareness programme under
USSS Campaign2017-18 2017-18 Extension
TRAINING/
STUDY TOUR3.09 All Farmers of the State Ongoing Production All 34 Districts in the State
2
Enhancing Pigeon Pea Productivity and
Stability in Maharashtra State through
introduction of improved pigeon pea
production technologies
2017-18 2017-18 ExtensionTRAINING/
STUDY TOUR0.00 25000 Ongoing Production
Amravati, Wardha, Parbhani, Latur, Osmanabad,
Ahmednagar, Pune
3
Establishment of single eye bud nursery for
Sugarcane2017-18 2017-18
Crop
DevelopmentOther 15.15
1200 nurserymen &
20000 FarmersOngoing Production
Nashik, Dhule, Nandurbar, Jalgaon, Ahmednagar,
Pune, Solapur, Satara, Sangli, Kolhapur,
Aurangabad, Jalna, Beed, Latur, Osmanabad,
Nanded, Parbhani, Hingoli, Bhandara
4
Paddy Seed Chain Development and
Mechanization Programme2017-18 2017-18
Crop
DevelopmentPaddy 13.22 123115 Ongoing Production
Thane, Palghar, Raigad, Ratnagiri, Sindhudurg,
Nandurbar, Ahmednagar, Sangli, Kolhapur
Dir. Extension
5 2017-18 2016-17 200.00 12000 Ongoing Infrastructure All Districts (Except Mumbai urban and sub urban)
6
Mechanization Project under 'Unnat Sheti -
Samrudha Shetkari' Campaign (Additionl
project) 2017-18 2017-18
Agriculture
mechanizatio
n
Machine &
equipment
assistance
200.00 More than 12000 Farmers Ongoing Infrastructure All 34 Districts
7
Strengthening and modernization of Soil
Testing Laboratory at Nagpur & Wardha2017-18 2017-18
Agriculture
mechanizatio
n
Machine &
equipment
assistance
0.25No fo farmers in Nagpur
District 2,68,265
Ongoing Infrastructure Nagpur & Wardha
8
Strengthening of Quality Control & Residue
testing laboratories in Maharashtra State &
to obtain the membership of international
organizations of Seed testing (ISTA) &
maintaining NABL accreditation
2017-18 2017-18Crop
DevelopmentCotton 4.35
The Farmers of all
districts will be directly
benefitted
Ongoing All Districts
Mechanization Project under 'Unnat
Sheti - Samrudha Shetkari' Campaign
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 75 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
9
Establishment of Biological Control
Laboratory for mass production of bio-agents
against sugarcane insect pests and diseases
and dissemination of technology for
enhanced cane and sugar productivity in
2017-18 2017-18 Lab #REF! 5.00 4800 Ongoing Ahmednagar, Solapur, Pune and Satara
10
Development of demonstration cum
seed/planting material production areas of
forage crops at government fields/TSF in
different agro-climatic conditions of
Maharashtra
2017-18 2017-18 Lab Fertilizer Lab 6.22 5000 OngoingInfrastructure and
assets32 Districts
Dir. Q.C
11
Strengthening of Government Nurseries
2017-18 2017-18 Horticulture Nuseries 5.36Farmers will be
benefitted indirectlyOngoing
Infrastructure and
assets
The project is proposed for all 119 Govt Nurseries
in 34 districts of
the Maharashtra state It will help in.
strengthening of infrastructures, which will improve
the quality
12
Turmeric mechanization and post -harvest
management project2017-18 2017-18 Horticulture Nuseries 10.01 415 Ongoing
Infrastructure and
assets(Satara, Sangli and Kolhapur
13
Development of high-tech Horticulture
Government Nursery2017-18 2017-18 Horticulture Nuseries 19.97
Farmers will be
benefitted indirectlyOngoing
Infrastructure and
assets
Palghar, Ratnagiri, Railgad, Sindhudurg, Nashik,
Jalgaon, Ahmednagar, Solapur, Sangli,
Aurangabad, Beed, Latur, Parbhani, Hingoli,
Nanded, Amravati, Washim, Yeotmal, Wardha,
Bhandara, Gondia, Gadchiroli
14
Strengthening of Hortinet Treceability
System for export of Fresh Fruit &
Vegetables 2017-18 2017-18 Horticulture Nuseries 2.00 50000 OngoingProduction and
growth
All Districts
Dir. Horticulture
15
Development of multi chamber and multi
commodity cold storage with export assisting
infrastructure and processing unit at
Vashi,Navi Mumbai.(NAFED)
2017-18 2017-18 Other 10.92 5000 OngoingInfrastructure and
assetsThane, Palghar, Raigad, Pune, Nashik
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 76 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
NAFED
16
Financial assistance for protected cultivation
2017-18 2017-18 NHMProtected
cultivation50.00 2050 No (Adequate no. of
SC/ST farmers will be
selected)
OngoingInfrastructure and
assetsAll Districts of the State
17
Low cost Onion Storage Structure
2017-18 2017-18 NHM #REF! 50.00 5657 OngoingInfrastructure and
assets26 Districts of Maharashtra
18
Plantation of Medicinal plants - Aayush
Programme2017-18 2017-18 NHM #REF! 3.56 650 Not implemented
Production and
growth
Sindhudurg, Ratnagiri, Pune, Ahmednagar, Solapur,
Satara, Jalgaon, Nandurbar, Jalna, Beed, Latur,
Osmanabad, Parbhani, Nanded, Amravati, Akola,
Buldhana, Washim, Yeotmal, Nagpur, Wardha,
Bhandara Gondia, Chandrapur
19
Peri-urban Horticulture Development for
Smart City- Pune (Sub-Scheme RKVY)2017-18 2017-18 NHM #REF! 0.00 Ongoing
Infrsructure and
assetsPune
National Horticulture Mission
20
Distribution of Pulses & Oil seeds Certified
Seed 2017-18 2016-17 2.47 334666 Ongoing
Production and
growth
Akola, Amravati, Buldhana, Washim, Yeotmal,
Aurangabad, Beed, Jalna, Raigad, Thane, Palghar,
Ratnagiri, Sindhudurg, Kolhapur, Sangli, Satara,
Hingoli, Latur, Nanded, Osmanabad, Parbhani,
Bhandara, Gondiya, Chandrapur,Gadchiroli, Mahabeej Akola
21
Establishment of lift irrigation scheme for
optimization of sustainable seed production
programme at the university campus of
MPKV, Rahuri.
2017-18 2017-18 ExtensionTRAINING/
STUDY TOUR15.22 110173 Ongoing
Procduction and
growthTotal 34 Districts
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 77 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
MPKV Rahuri
22
Silkworm hybrid cocoon production &
transfer of Sericulture technology in
Marathwada Region 2017-18 2017-18 NHM 0.36 1600 OngoingProduction and
growtg
Parbhani, Beed, Nanded, Hingoli, Latur,
Osmanabad,
MKV Parbhani
23
Strengthening of Laboratory at Khar Land
Research Station, Panvel and capacity
building of farmers in soil health and fish
production.
2017-18 2017-18 Horticulture
Machine &
equipment
assistance
4.19 2000 OngoingInfrastructure and
assets
(Palghar, Thane, Raigad, Ratnagiri and Sindhudurg)
of Konkan region
BSKKV Dapoli
24
Infrastructure Development in APMC Karjat
2017-18 2017-18 Marketing #REF! 0.62 75000 OngoingInfrastructure and
assetsAhmednagar
25
Infrastructure Development in APMC
Jamkhed2017-18 2017-18 Marketing #REF! 0.81 46174 Ongoing
Infrastructure and
assetsAhmednagar
26
Construction of godowns in 108 APMCs for
implementing agriculture produce pledge
loan scheme in the State 2017-18 2017-18 Marketing #REF! 0.00 100000 OngoingInfrastructure and
assets33 Districts
27
Setting up of grain cleaning unit in 31
APMCs including Civil work, Machinery &
Electrical works 2017-18 2017-18 Marketing #REF! 0.00 50000 OngoingInfrastructure and
assets17 Districts
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 78 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
Marketing Board
28
Mechanization harvesting in sugarcane
2017-18 2017-18 AMEC
Machine &
equipment
assistance
15.00 15000 OngoingInfrastructure and
assetsMaharashtra State Sugar cane growing districts.
Sugarcane Development
29
Development of multi chamber cold storage
with PHM infrastructure & processing unit at
8 centers in MSWC 2017-18 2017-18 Marketing
settting
up/strengthening
of Market
infrastructure
22.50 3400 OngoingInfrastructure and
assets
Nagpur, Amrawati, Buldhana, Wardha, Akola,
Pune, Thane
30
Development of storage facility by
establishment of warehousing infrastructure,
online trading facility and easy finance
through mortgage of warehouse receipt at 10
centers
2017-18 2017-18 Marketing
settting
up/strengthening
of Market
infrastructure
12.32 5000 OngoingInfrastructure and
assets
Pune, Ratnagiri, Raigad, Yavatmal, Sangli,
Aurangabad, Palghar
31
Strengthening of storage facility in
Vidharbha and Marathwada region at 10
centers in Maharashtra 2017-18 2017-18 Marketing
settting
up/strengthening
of Market
infrastructure
10.18 7000 OngoingInfrastructure and
assets
Latur, Amravati, Aurangabad, Buldhana,
Osmanabad, Parbhani, Hingoli
32
Development Of Warehousing /Cold Storage
Facility along Proposed Mumbai-Nagpur
Corridor 2017-18 2017-18 Marketing
settting
up/strengthening
of Market
infrastructure
24.60 40000 OngoingInfrastructure and
assets
Wardha,Washim,Aurangabad,Ahmednagar,Amrava
ti,Nagpur
33
A Perishable Complex for Import/ Export, At
Dronagiri node JNPT, Mumbai2017-18 2017-18 Marketing
settting
up/strengthening
of Market
infrastructure
5.0010000 farmers to be
impactedOngoing
Infrastructure and
assetsMumbai
34
Upgradation of Warehousing Infrastructure
with replacement of AC sheet roofing by
Galvalume sheet roofing & warehousing
infrastructure for direct Marketing.
2017-18 2017-18 Marketing
settting
up/strengthening
of Market
infrastructure
22.2010000 farmers to be
impactedOngoing
Infrastructure and
assetsAll districts
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 79 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
35
Up gradation of flooring of warehousing
infrastructure at various centers all over
Maharashtra & concrete roads in W H
complexes in districts of Gadchiroli,
Bhandara, Gondia & Chandrapur.
2017-18 2017-18 Marketing
settting
up/strengthening
of Market
infrastructure
23.99 200000 OngoingInfrastructure and
assetsGadchiroli, Bhandara, Gondia & Chandrapur.
MSWC
36 2017-18 2016-17 3.42 150-200 OngoingInfrastructure and
assets Kolhapur & All Maharashtra
37
Dairy development programme in Vidharbha
& Maratwada Region2017-18 2017-18 ANHB #REF! 340.00 90000 Ongoing
Production and
growth
10 Districts of Vidharbha & Marathwada
RegionAkola, Amravati, Buldhana, Wardha,
Nagpur, Chandrapur, Latur, Osmanabad, Nanded,
Jalna
38
Establishment of incinerator facility for
upgradation of QC at IVBP, Pune.2017-18 2017-18 ANHB #REF! 0.50 All Livestock & poultry
population of State of
Maharashtra
Ongoing Pune
39
Establishment of dedicated fermenter facility
for production of anaerobic bacterial vaccine
(BQ, ET) at IVBP, Pune 2017-18 2017-18 ANHB #REF! 10.00
All farmers having
Livestock of the
Maharashtra state & other
states
Ongoing
Infrastructure and
assetsAll Districts
40
Strengthening of TVCC and diagnostic lab at
Post Graduate Institute of Veterinary and
Animal Science, Akola. 2017-18 2017-18 ANHB #REF! 4.50
1. Livestock farmers
2. Field Veterinarians
3. UG/Post Graduate
students
Ongoing
Infrastructure and
assets
Akola, Washim, Buldana, Yeotmal and Amravati
41
Establishment of commercial small animal
breeding centre under GMP norms at
IVBP,Pune 2017-18 2017-18 ANHB #REF! 10.00
All farmers having
Livestock of the
Maharashtra state & other
states
Ongoing
Infrastructure and
assetsAll Districts
Animal Husbundary
42
Establishment of 10 MTPD skim milk
powder Plant and expansion &
modernization of 50 TLPD milk processing
plant to 1 LLPD of Lokmangal Multistate Co-
op. Society Ltd., at Bibi Darphal, North
2017-18 2017-18 Dairy 12.40
3 lakhs milk producers
from 270 farmers club
established by Lokmangal
Society & 1.5 lakh
another non members
Ongoing
Infrastructure and
assetsSolapur, Latur, Sangli, Osmanabad, Beed
Centre of excellance for Genetic
improvement for KVK
Baramati(Baramati,Indapur, Daund)
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 80 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
43
Expansion & modernization of 50 TLPD
milk processing plant to 1 LLPD and to set
up 2 milk chilling centers of 10 TLPD of
Sampatrao Deshmukh Co-op. Milk union,
Kadepur, Sangli
2017-18 2017-18 Dairy 7.73 10000 Ongoing
Infrastructure and
assetsSangli
Dairy development
44 2016-17 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
3.44 150-200 Ongoing Infrastructure Kolhapur & All Maharashtra
45
Renovation of Fish seed Production Centre
2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
6.25 10000 Ongoing Infrastructure Bhandara
46
Establishment of Brood Bank for quality Fish
Seed Production in Maharashtra2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
20.00 All over Maharashtra Ongoing ProductionAmravati, Solapur, Sangli, Aurangabad, Latur,
Nagpur
47
Assistance to the Fishermen Seed Production
Centre & Portable Hatcheries.2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
2.52 All over Maharashtra. Ongoing Production All districts of Maharashtra
48
Assistance to land Fish farmer for Fingerling
Rearing2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
1.26 Ongoing Production 36 Districts of Maharashtra
49
Mesh Size Regulation at Cod and for
Sustainable Fishing in Marine Sector2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
1.794259 Fishermen & 07
coastal districtOngoing Production all 7 coastal districts of Maharashtra
50
Bivalve (Mussel) / Oyster Culture in Sea
Water(name change)2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
2.57 5145000 Ongoing Production
49 creeks in Palghar, Thane, Mumbai City,
Mumbai Suburban, Raigad, Ratnagiri, Sindhudurg
51
Assistance to the Fishermen of Coastal
Districts for Crab Culture2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
0.99 350 Ongoing ProductionPalghar, Thane, Mumbai City, Mumbai Suburban,
Raigad, Ratnagiri, Sindhudurg
Pilot Project of Fish Feed Mill Plant in
Maharashtra2017-18
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 81 of 104
Sr.No
Name of AgencySLSC
Sanction
Year
Report
YearSector Sub sector
RKVY
Project
Cost
Beneficiaries Status Category Districts
Projectwise information of projects implemented during 2017-18 by Agriculture & Allied Sectors under RKVY for Evaluation conducted by Economics & Statistics Sanchalanlay,
Mumbai
Rs.in Cr.
52
Establishment Multi Species (Crab, & Sea
bass) Seed Production Centre (Hatchery)
Vagheshwar - Sindhudurg 2017-18 2017-18 Fisheries
INFRASTRUCT
URE/PONDS OF
FISHRIES/DEPT/
AGENCY
15.80 490 Ongoing ProductionPalghar, Thane, Mumbai City, Mumbai Suburban,
Raigad, Ratnagiri, Sindhudurg
Fishery
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 82 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 83 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 84 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 85 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 86 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 87 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 88 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 89 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 90 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 91 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 92 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 93 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 94 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 95 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 96 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 97 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 98 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 99 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 100 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 101 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 102 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM
Page 103 of 104
Limited tender for conducting evaluation study of Rashtriya Krishi Vikas Yojna through empanelled agencies
Annexure N: Projects/schemes details
Issued by Directorate of Economics & Statistics, Mumbai, GoM