Bill No.-: -Works 1 of 34
Bill No. Description of Work Unit QtyUnit Price
Total PricePrice Curr
(1) CIVIL/BUILDING WORK (GRAVURE)
7 Air Conditioner / Ventilation sum
8 Plumbing sum
9 Water / Drainage System sum
10 Sanitary sum
11 Fire Fighting System sum
AC Works (Ac Units & Pipes, Installs)
Duct Work
Sanitary
Piping, Valve, Fitting (Plumbing, Hydrants)
Bills of Quantities
Bill No.-: -Works 2 of 34
Bill No. Description of Work Unit QtyUnit Price
Total PricePrice Curr
Total of 102
Bills of Quantities
Bill No.-: -Works 3 of 34
Bill No. Description of Work Unit QtyUnit Price
Total PricePrice Curr
7 Air Conditioner / Ventilation
7.1 Air Conditioner
7.1.1 Equipment Work
7.1.1.1 AC-1 Outdoor unit nr(s) 1
7.1.1.2 AC-1-1 Indoor unit nr(s) 2
7.1.1.3 AC-1-2 Indoor unit nr(s) 3
7.1.1.4 AC-1-3 Indoor unit nr(s) 2
7.1.1.4 AC-1-4 Indoor unit nr(s) 2
7.1.1.5 AC-1-5 Indoor unit nr(s) 1
7.1.1.6 AC-2 Outdoor unit nr(s) 1
7.1.1.7 AC-2-1 Indoor unit nr(s) 1
7.1.1.8 AC-2-2 Indoor unit nr(s) 1
7.1.1.9 AC-2-3 Indoor unit nr(s) 1
7.1.1.10 AC-2-4 Indoor unit nr(s) 1
7.1.1.11 AC-2-5 Indoor unit nr(s) 1
7.1.1.12 AC-2-6 Indoor unit nr(s) 2
7.1.1.13 AC-2-7 Indoor unit nr(s) 1
7.1.1.14 AC-2-8 Indoor unit nr(s) 1
7.1.1.15 AC-2-9 Indoor unit nr(s) 1
7.1.1.16 Mobilization Fee Lot 1
7.1.1.17 Installation Fee Lot 1
7.1.1.18 Testing & commissioning Fee Lot 1
7.1.2 Duct Work
7.1.2.1Galvanized steel Rectangular Duct t=0.5mm (G26)
sqm94
7.1.2.2 nr(s) 6
7.1.2.3 nr(s) 5
7.1.2.4 nr(s) 2
7.1.2.5 nr(s) 3
7.1.2.6 nr(s) 1
7.1.2.7 nr(s) 2
7.1.2.8 nr(s) 2
7.1.2.9 nr(s) 4
7.1.2.10 nr(s) 6
7.1.2.11 nr(s) 5
7.1.2.12 nr(s) 2
7.1.2.13 nr(s) 3
7.1.2.14 nr(s) 1
7.1.2.15 nr(s) 2
7.1.2.16Insulation of Rectangular Duct for concealed Duct
sqm94
7.1.2.17 Insulation of Air Diffuser Box sqm 14
7.1.2.18 Insulation of Louver Chamber sqm 10
7.1.2.19 Labor Cost Lot 1
7.1.2.20 Testing & commissioning Fee Lot 1
Supply Air Grill VHS 150×150Supply Air Grill VHS 200×200Supply Air Grill VHS 250×250Supply Air Grill VHS 300×300
Air Volume Damper VD-300×200Air Volume Damper VD-400×200
Canvas Connection-300×200Canvas Connection-400×200
Air Diffuser Box-300x300x300HAir Diffuser Box-350x350x350HAir Diffuser Box-400x400x400HAir Diffuser Box-450x450x400H
Louver Chamber-1200x500x400HLouver Chamber-1200x700x400H
Bills of Quantities
Bill No.-: -Works 4 of 34
Bill No. Description of Work Unit QtyUnit Price
Total PricePrice Curr
7.1.3 Piping Work
7.1.3.1Insulated Copper pipe(for AC) φ9.5 (General)
m87
7.1.3.2Insulated Copper pipe(for AC) φ12.7(General)
m14
7.1.3.3Insulated Copper pipe(for AC) φ15.9(General)
m75
7.1.3.4Insulated Copper pipe(for AC) φ19.1(General)
m40
7.1.3.5Insulated Copper pipe(for AC) φ28.6(General)
m24
7.1.3.6Insulated Copper pipe(for AC) φ34.9(General)
m28
7.1.3.7Insulated Copper pipe(for AC) φ41.3(General)
m9
7.1.3.8Insulated Copper pipe(for AC) φ19.1(Outside)
m14
7.1.3.9Insulated Copper pipe(for AC) φ34.9(Outside)
m5
7.1.3.10Insulated Copper pipe(for AC) φ41.3(Outside)
m9
7.1.3.11 PVC Drainage pipe φ25(General) m 66
7.1.3.12 PVC Drainage pipe φ50(General) m 74
7.1.3.13 PVC Drainage pipe φ50(Outside) m 3
7.1.3.14 PVC Drainage pipe φ65(Outside) m 16
7.1.3.15 Insulation of Drainage Pipeφ25(General) m 66
7.1.3.16 Insulation of Drainage Pipeφ50(General) m 74
7.1.3.17 Labor Cost Lot 1
7.1.3.18 Testing & commissioning Fee Lot 1
7.2 Ventilation
7.2.1 Equipment Work
7.2.1.1 FE-101 Exhaust Fan nr(s) 1
7.2.1.2 FE-102 Exhaust Fan nr(s) 1
7.2.1.3 FE-103 Exhaust Fan nr(s) 1
7.2.1.4 FE-104 Exhaust Fan nr(s) 6
7.2.1.5 FE-105 Exhaust Fan nr(s) 2
7.2.1.6 FE-201 Exhaust Fan nr(s) 1
7.2.1.7 FE-202 Exhaust Fan nr(s) 1
7.2.1.8 FE-203 Exhaust Fan nr(s) 1
7.2.1.9 Mobilization Fee Lot 1
7.2.1.10 Installation Fee Lot 1
7.2.1.11 Testing & commissioning Fee Lot 1
7.2.2 Duct Work
7.2.2.1 Galvanized steel Rectangular Duct t=0.5mm (G26) sqm 118
7.2.2.2 nr(s) 4
7.2.2.3 nr(s) 14
7.2.2.4 nr(s) 2
Exhaust Air Grill HS 150×150Exhaust Air Grill HS 200×200Exhaust Air Grill HS 250×250
Bills of Quantities
Bill No.-: -Works 5 of 34
Bill No. Description of Work Unit QtyUnit Price
Total PricePrice Curr
7.2.2.5 nr(s) 1
7.2.2.6 nr(s) 1
7.2.2.7 nr(s) 1
7.2.2.8 nr(s) 1
7.2.2.9 nr(s) 1
7.2.2.10 nr(s) 1
7.2.2.11 nr(s) 1
7.2.2.12 nr(s) 2
7.2.2.13 nr(s) 2
7.2.2.14 nr(s) 2
7.2.2.15 nr(s) 2
7.2.2.16 nr(s) 4
7.2.2.17 nr(s) 14
7.2.2.18 nr(s) 2
7.2.2.19 nr(s) 1
7.2.2.20 nr(s) 1
7.2.2.21 nr(s) 1
7.2.2.22 nr(s) 1
7.2.2.23 Labor Cost Lot 1
7.2.2.24 Testing & commissioning Fee Lot 1
8 Plumbing
8.1 Piping Work
8.1.1 Carbon steel Water Supply pipe For Piping Ø20(MR,WC) m 154
8.1.2 Carbon steel Water Supply pipe For Piping Ø25(MR,WC) m 101
8.1.3 Carbon steel Water Supply pipe For Piping Ø32(MR,WC) m 10
8.1.4 Carbon steel Water Supply pipe For Piping Ø40(MR,WC) m 11
8.1.5 Carbon steel Water Supply pipe For Piping Ø50(MR,WC) m 25
8.1.6 Carbon steel Water Supply pipe For Piping Ø65(MR,WC) m 32
8.1.7 Carbon steel Water Supply pipe For Piping Ø80(MR,WC) m 5
8.1.8 nr(s) 1
8.1.9 nr(s) 1
8.1.10 Labor Cost Lot 1
8.1.11 Testing & commissioning Fee Lot 1
9 Water / Drainage System
9.1 Piping Work
9.1.1 m 52
9.1.2 m 79
9.1.3 m 7
9.1.4 m 103
9.1.5 m 88
9.1.6 m 107
9.1.7 m 126
9.1.8 m 74
9.1.9 m 10
Air Volume Damper VD-150×150Air Volume Damper VD-200×200Air Volume Damper VD-250×200Air Volume Damper VD-300×200Air Volume Damper VD-400×200
Non-Return Damper CD-150×150Non-Return Damper CD-250×200
Canvas Connection-150×150Canvas Connection-200×200Canvas Connection-250×200Canvas Connection-400×200
Air Diffuser Box-300x300x300HAir Diffuser Box-350x350x350HAir Diffuser Box-400x400x400H
Louver Chamber- 800x500x400HLouver Chamber-1100x500x400HLouver Chamber-1200x500x400HLouver Chamber-1600x500x400H
Gate Valve 80A (10K)
Valve Chamber 80A (10K)
PVC Soil Water pipe φ40(MR,WC)PVC Soil Water pipe φ50(MR,WC)PVC Soil Water pipe φ65(MR,WC)PVC Soil Water pipe φ75(MR,WC)PVC Soil Water pipe φ100(MR,WC)
PVC Vent pipe φ32(MR,WC)PVC Vent pipe φ50(MR,WC)PVC Vent pipe φ65(MR,WC)PVC Vent pipe φ100(MR,WC)
Bills of Quantities
Bill No.-: -Works 6 of 34
Bill No. Description of Work Unit QtyUnit Price
Total PricePrice Curr
9.1.10 nr(s) 3
9.1.11 Floor Drain trap 50A nr(s) 3
9.1.12 nr(s) 1
9.1.13 Soil Chamber 600x600x1000H nr(s) 1
9.1.14 Labor Cost Lot 1
9.1.15 Testing & commissioning Fee Lot 1
10 Sanitary
10.1 Sanitary Equipments
10.1.1 Moslem type Water closet (Flush valve,Paper holder,Hand-shower) nr(s) 8
10.1.2 European type Water closet (Flush valve,Paper holder) nr(s) 3
10.1.3 Urinal (Flush valve) nr(s) 6
10.1.4 Lavatory (Faucet) nr(s) 8
10.1.5 Mirror nr(s) 8
10.1.6 Labor Cost Lot 1
10.1.7 Testing & commissioning Fee Lot 1
11 Fire Fighting System
11.1 Indoor Fire Hydrant System
11.1.1 Piping Work
11.1.1.1 Carbon steel pipe Ø50(MR,WC) m 40
11.1.1.2 Carbon steel pipe Ø65(MR,WC) m 69
11.1.1.3 Carbon steel pipe Ø50(General) m 2
11.1.1.4 Carbon steel pipe Ø65(General) m 18
11.1.1.5 Fire Hydrant Hose Cabinet nr(s) 5
11.1.1.6 Labor Cost Lot 1
11.1.1.7 Testing & commissioning Fee Lot 1
11.2 Sprinkler System
11.2.1 Piping Work
11.2.1.1 Carbon steel pipe Ø25(MR,WC) m 407
11.2.1.3 Carbon steel pipe Ø32(MR,WC) m 55
11.2.1.4 Carbon steel pipe Ø40(MR,WC) m 122
11.2.1.5 Carbon steel pipe Ø50(MR,WC) m 66
11.2.1.6 Carbon steel pipe Ø125(MR,WC) m 125
11.2.1.7 Carbon steel pipe Ø150(MR,WC) m 46
11.2.1.8 Carbon steel pipe Ø25(General) m 344
11.2.1.9 Carbon steel pipe Ø32(General) m 66
11.2.1.10 Carbon steel pipe Ø125(General) m 72
11.2.1.12 Carbon steel pipe Ø150(General) m 7
11.2.1.13 Sprinkler Head nr(s) 412
Drainage fittings COB100
Vent Cap 100A
Bills of Quantities
Bill No.-: -Works 7 of 34
Bill No. Description of Work Unit QtyUnit Price
Total PricePrice Curr
11.2.1.14 Water Flow Ditecting Device φ125 nr(s) 3
11.2.1.15 Testing Valve φ25 nr(s) 3
11.2.1.16 Labor Cost Lot 1
11.2.1.17 Testing & commissioning Fee Lot 1
Subtotal of (1) sum
Bills of Quantities
Bill No.-: -Works 8 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
(1) CIVIL/BUILDING WORK (OFFSET)
7 Air Conditioner / Ventilation sum
8 Plumbing sum N.A
9 Water / Drainage System sum N.A
10 Sanitary sum N.A
11 Fire Fighting System sum
AC Works (Ac Units & Pipes, Installs)
Duct Work
Sanitary
Piping, Valve, Fitting (Plumbing, Hydrants)
Ventilation-FANs Work
Bills of Quantities
Bill No.-: -Works 9 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Total of 102
Bills of Quantities
Bill No.-: -Works 10 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7 Air Conditioner / Ventilation
7.1 Air Conditioner
7.1.1 Equipment Work
7.1.1.1 AC-1 Outdoor unit nr(s) 1
7.1.1.2 AC-1-1 Indoor unit nr(s) 1
7.1.1.3 AC-1-2 Indoor unit nr(s) 1
7.1.1.4 AC-1-3 Indoor unit nr(s) 1
7.1.1.5 AC-2 Outdoor unit nr(s) 1
7.1.1.6 AC-2-1 Indoor unit nr(s) 3
7.1.1.7 HRV-101 Heat Reclaim Ventilator nr(s) 1
7.1.1.8 HRV-102 Heat Reclaim Ventilator nr(s) 1
7.1.1.9 HRV-201 Heat Reclaim Ventilator nr(s) 1
7.1.1.10 Mobilization Fee Lot 1
7.1.1.11 Installation Fee Lot 1
7.1.1.12 Testing & commissioning Fee Lot 1
7.1.2 Duct Work
7.1.2.1Galvanized steel Rectangular Duct t=0.5mm (G26)
sqm4
7.1.2.2 Galvanized steel Spiral Duct φ150 m 44
7.1.2.3 Galvanized steel Spiral Duct φ200 m 11
7.1.2.4 nr(s) 3
7.1.2.5 nr(s) 1
7.1.2.6 nr(s) 3
7.1.2.7 nr(s) 1
7.1.2.8 nr(s) 4
7.1.2.9 nr(s) 2
7.1.2.10 nr(s) 2
7.1.2.11 nr(s) 6
7.1.2.12 nr(s) 2
7.1.2.13Insulation of Rectangular Duct for concealed Duct
sqm4
7.1.2.14Insulation of Spiral Duct for concealed Duct φ150
m44
7.1.2.15Insulation of Spiral Duct for concealed Duct φ200
m11
7.1.2.16 Insulation of Air Diffuser Box sqm 8
7.1.2.17 Labor Cost Lot 1
7.1.2.18 Testing & commissioning Fee Lot 1
7.1.3 Piping Work
Supply Air Grill VHS 150×150Supply Air Grill VHS 900×200
Return Air Grill HS 150×150Return Air Grill HS 900×200
Vent Cap-φ150Vent Cap-φ200
Canvas Connection-300×200
Air Diffuser Box-300x300x300HAir Diffuser Box-1050x350x350H
Bills of Quantities
Bill No.-: -Works 11 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7.1.3.1Insulated Copper pipe(for AC) φ6.4 (General)
m31
7.1.3.2Insulated Copper pipe(for AC) φ9.5(General)
m22
7.1.3.3Insulated Copper pipe(for AC) φ12.7(General)
m31
7.1.3.4Insulated Copper pipe(for AC) φ15.9(General)
m16
7.1.3.5Insulated Copper pipe(for AC) φ19.1(General)
m6
7.1.3.6Insulated Copper pipe(for AC) φ9.5(Outside)
m14
7.1.3.7Insulated Copper pipe(for AC) φ15.9(Outside)
m5
7.1.3.8Insulated Copper pipe(for AC) φ19.1(Outside)
m9
7.1.3.9 PVC Drainage pipe φ25(General) m 11
7.1.3.10 PVC Drainage pipe φ50(General) m 20
7.1.3.11 PVC Drainage pipe φ50(Outside) m 10
7.1.3.12 Insulation of Drainage Pipeφ25(General) m 11
7.1.3.13 Insulation of Drainage Pipeφ50(General) m 20
7.1.3.14 Labor Cost Lot 1
7.1.3.15 Testing & commissioning Fee Lot 1
7.2 Ventilation
7.2.1 Equipment Work
7.2.1.1 FE-101 Exhaust Fan nr(s) 4
7.2.1.2 FE-102 Exhaust Fan nr(s) 1
7.2.1.3 FE-103 Exhaust Fan nr(s) 2
7.2.1.4 FE-201 Exhaust Fan nr(s) 1
7.2.1.5 Mobilization Fee Lot 1
7.2.1.6 Installation Fee Lot 1
7.2.1.7 Testing & commissioning Fee Lot 1
7.2.2 Duct Work
7.2.2.1 Galvanized steel Rectangular Duct t=0.5mm (G26) sqm 6
7.2.2.2 nr(s) 2
7.2.2.3 nr(s) 1
7.2.2.4 nr(s) 2
7.2.2.5 nr(s) 2
7.2.2.6 nr(s) 1
7.2.2.7 Labor Cost Lot 1
7.2.2.8 Testing & commissioning Fee Lot 1
Exhaust Air Grill HS 200×200
Air Volume Damper VD-200×200
Canvas Connection-200×200
Air Diffuser Box-350x350x350H
Louver Chamber- 700x500x400H
Bills of Quantities
Bill No.-: -Works 12 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
11 Fire Fighting System
11.1 Indoor Fire Hydrant System
11.1.1 Piping Work
11.1.1.1 Carbon steel pipe Ø50(MR,WC) m 17
11.1.1.2 Carbon steel pipe Ø65(MR,WC) m 48
11.1.1.3 Carbon steel pipe Ø50(General) m 2
11.1.1.4 Carbon steel pipe Ø65(General) m 17
11.1.1.5 Fire Hydrant Hose Cabinet nr(s) 4
11.1.1.6 Labor Cost Lot 1
11.1.1.7 Testing & commissioning Fee Lot 1
11.2.1.1 Carbon steel pipe Ø25(MR,WC) m 317
11.2.1.2 Carbon steel pipe Ø32(MR,WC) m 90
11.2.1.3 Carbon steel pipe Ø40(MR,WC) m 179
11.2.1.4 Carbon steel pipe Ø50(MR,WC) m 46
11.2.1.5 Carbon steel pipe Ø125(MR,WC) m 119
11.2.1.6 Carbon steel pipe Ø150(MR,WC) m 3
11.2.1.7 Sprinkler Head nr(s) 252
11.2.1.8 Water Flow Ditecting Device φ125 nr(s) 2
11.2.1.9 Testing Valve φ25 nr(s) 2
11.2.1.10 Labor Cost Lot 1
11.2.1.11 Testing & commissioning Fee Lot 1
Bills of Quantities
Bill No.-: -Works 13 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Subtotal of (1) sum
Bills of Quantities
Bill No.-: -Works 14 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
(1) CIVIL/BUILDING WORK (WAREHOUSE)
7 Air Conditioner / Ventilation sum
8 Plumbing sum NA
9 Water / Drainage System sum NA
10 Sanitary sum NA
11 Fire Fighting System sum
Ventilation-FANs Work
Piping, Valve, Fitting (Plumbing, Hydrants)
Bills of Quantities
Bill No.-: -Works 15 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Total of 102
Bills of Quantities
Bill No.-: -Works 16 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7 Air Conditioner / Ventilation
7.1 Ventilation
7.1.1 Equipment Work
7.1.1.1 FE-101 Exhaust Fan nr(s) 6
7.1.1.2 FE-102 Exhaust Fan nr(s) 6
7.1.1.27 Mobilization Fee Lot 1
7.1.1.28 Installation Fee Lot 1
7.1.1.29 Testing & commissioning Fee Lot 1
11 Fire Fighting System
11.1 Indoor Fire Hydrant System
11.1.1 Piping Work
11.1.1.1 Carbon steel pipe Ø50(General) m 58
11.1.1.2 Carbon steel pipe Ø65(General) m 206
11.1.1.3 Fire Hydrant Hose Cabinet nr(s) 8
11.1.1.4 Labor Cost Lot 1
11.1.1.5 Testing & commissioning Fee Lot 1
11.2 Sprinkler System
11.2.1 Piping Work
11.2.1.1 Carbon steel pipe Ø25(General) m 713
11.2.1.2 Carbon steel pipe Ø32(General) m 198
Carbon steel pipe Ø40(General) m 396
Carbon steel pipe Ø50(General) m 495
11.2.1.3 Carbon steel pipe Ø125(General) m 198
11.2.1.4 Carbon steel pipe Ø150(General) m 3
11.2.1.5 Sprinkler Head nr(s) 576
11.2.1.6 Water Flow Ditecting Device φ125 nr(s) 2
11.2.1.7 Testing Valve φ25 nr(s) 2
11.2.1.8 Labor Cost Lot 1
11.2.1.9 Testing & commissioning Fee Lot 1
Bills of Quantities
Bill No.-: -Works17 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
(1) CIVIL/BUILDING WORK (OFFICE)
7 Air Conditioner / Ventilation sum
8 Plumbing sum
9 Water / Drainage System sum
10 Sanitary sum
11 Fire Fighting System sum
AC Works (Ac Units & Pipes, Installs)
Duct Work
Sanitary
Piping, Valve, Fitting (Plumbing, Hydrants)
Bills of Quantities
Bill No.-: -Works18 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Total of 102
Bills of Quantities
Bill No.-: -Works19 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7 Air Conditioner / Ventilation
7.1 Air Conditioner
7.1.1 Equipment Work
7.1.1.1 AC-1 Outdoor unit nr(s) 1
7.1.1.2 AC-1-1 Indoor unit nr(s) 6
7.1.1.3 AC-1-2 Indoor unit nr(s) 1
7.1.1.4 AC-1-3 Indoor unit nr(s) 1
7.1.1.5 AC-1-4 Indoor unit nr(s) 1
7.1.1.6 AC-1-5 Indoor unit nr(s) 1
7.1.1.7 AC-2 Outdoor unit nr(s) 1
7.1.1.8 AC-2-1 Indoor unit nr(s) 4
7.1.1.9 AC-2-2 Indoor unit nr(s) 1
7.1.1.10 AC-2-3 Indoor unit nr(s) 1
7.1.1.11 AC-2-4 Indoor unit nr(s) 1
7.1.1.12 AC-2-5 Indoor unit nr(s) 1
7.1.1.13 AC-2-6 Indoor unit nr(s) 1
7.1.1.14 AC-2-7 Indoor unit nr(s) 2
7.1.1.15 AC-3 Outdoor unit nr(s) 1
7.1.1.16 AC-3-1 Indoor unit nr(s) 8
7.1.1.17 AC-3-2 Indoor unit nr(s) 3
7.1.1.18 AC-4 Outdoor unit nr(s) 1
7.1.1.19 AC-4-1 Indoor unit nr(s) 2
7.1.1.20 AC-4-2 Indoor unit nr(s) 2
7.1.1.21 AC-4-3 Indoor unit nr(s) 2
7.1.1.22 AC-4-4 Indoor unit nr(s) 1
7.1.1.23 HRV-201 Heat Reclaim Ventilator nr(s) 1
7.1.1.24 HRV-202 Heat Reclaim Ventilator nr(s) 1
7.1.1.25 HRV-203 Heat Reclaim Ventilator nr(s) 1
7.1.1.26 HRV-204 Heat Reclaim Ventilator nr(s) 1
7.1.1.27 Mobilization Fee Lot 1
7.1.1.28 Installation Fee Lot 1
7.1.1.29 Testing & commissioning Fee Lot 1
7.1.2 Duct Work
7.1.2.1Galvanized steel Rectangular Duct t=0.5mm (G26)
sqm124
7.1.2.2 Galvanized steel Spiral Duct φ150 m 19
7.1.2.3 Galvanized steel Spiral Duct φ200 m 50
7.1.2.4 nr(s) 4
7.1.2.5 nr(s) 10
7.1.2.6 nr(s) 4
7.1.2.7 nr(s) 9
7.1.2.8 nr(s) 1
7.1.2.9 nr(s) 2
7.1.2.10 nr(s) 2
7.1.2.11 nr(s) 1
7.1.2.12 nr(s) 3
7.1.2.13 nr(s) 3
Supply Air Grill VHS 150×150Supply Air Grill VHS 200×200Supply Air Grill VHS 250×250Supply Air Grill VHS 350×350Supply Air Grill VHS 900×200
Return Air Grill HS 200×200Return Air Grill HS 250×250Return Air Grill HS 900×200
Air Volume Damper VD-400×200Air Volume Damper VD-400×250
Bills of Quantities
Bill No.-: -Works20 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7.1.2.14 nr(s) 2
7.1.2.15 nr(s) 6
7.1.2.16 nr(s) 6
7.1.2.17 nr(s) 6
7.1.2.18 nr(s) 4
7.1.2.19 nr(s) 12
7.1.2.20 nr(s) 6
7.1.2.21 nr(s) 9
7.1.2.22 nr(s) 2
7.1.2.23 nr(s) 3
7.1.2.24 nr(s) 3
7.1.2.25Insulation of Rectangular Duct for concealed Duct
sqm124
7.1.2.26Insulation of Spiral Duct for concealed Duct φ150
m19
7.1.2.27Insulation of Spiral Duct for concealed Duct φ200
m50
7.1.2.28 Insulation of Air Diffuser Box sqm 37
7.1.2.29 Insulation of Louver Chamber sqm 20
7.1.2.30 Labor Cost Lot 1
7.1.2.31 Testing & commissioning Fee Lot 1
7.1.3 Piping Work
7.1.3.1Insulated Copper pipe(for AC) φ6.4 (General)
m25
Insulated Copper pipe(for AC) φ9.5 (General)m
166
7.1.3.2Insulated Copper pipe(for AC) φ12.7(General)
m66
7.1.3.3Insulated Copper pipe(for AC) φ15.9(General)
m155
7.1.3.4Insulated Copper pipe(for AC) φ19.1(General)
m55
Insulated Copper pipe(for AC) φ22.2 (General)m
44
7.1.3.5Insulated Copper pipe(for AC) φ28.6(General)
m75
7.1.3.6Insulated Copper pipe(for AC) φ34.9(General)
m48
7.1.3.7Insulated Copper pipe(for AC) φ41.3(General)
m8
7.1.3.8Insulated Copper pipe(for AC) φ15.9(Outside)
m10
7.1.3.9Insulated Copper pipe(for AC) φ19.1(Outside)
m19
7.1.3.10Insulated Copper pipe(for AC) φ28.6(Outside)
m10
7.1.3.11Insulated Copper pipe(for AC) φ34.9(Outside)
m10
7.1.3.12Insulated Copper pipe(for AC) φ41.3(Outside)
m9
7.1.3.13 PVC Drainage pipe φ25(General) m 156
7.1.3.14 PVC Drainage pipe φ50(General) m 44
Vent Cap-φ150Vent Cap-φ200
Canvas Connection-400×200Canvas Connection-400×250
Air Diffuser Box-300x300x300HAir Diffuser Box-350x350x350HAir Diffuser Box-400x400x400HAir Diffuser Box-500x500x400HAir Diffuser Box-1050x350x350H
Louver Chamber-1200x500x400HLouver Chamber-1200x700x400H
Bills of Quantities
Bill No.-: -Works21 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7.1.3.15 PVC Drainage pipe φ50(Outside) m 5
7.1.3.16 PVC Drainage pipe φ65(Outside) m 62
7.1.3.17 Insulation of Drainage Pipeφ25(General) m 156
7.1.3.18 Insulation of Drainage Pipeφ50(General) m 44
7.1.3.19 Labor Cost Lot 1
7.1.3.20 Testing & commissioning Fee Lot 1
7.2 Ventilation
7.2.1 Equipment Work
7.2.1.1 FE-101 Exhaust Fan nr(s) 1
7.2.1.2 FE-102 Exhaust Fan nr(s) 1
7.2.1.3 FE-201 Exhaust Fan nr(s) 1
7.2.1.4 FE-202 Exhaust Fan nr(s) 1
7.2.1.5 Mobilization Fee Lot 1
7.2.1.6 Installation Fee Lot 1
7.2.1.7 Testing & commissioning Fee Lot 1
7.2.2 Duct Work
7.2.2.1 Galvanized steel Rectangular Duct t=0.5mm (G26) sqm 109
Galvanized steel Rectangular Duct t=0.6mm (G24) sqm 32
7.2.2.2 nr(s) 5
7.2.2.3 nr(s) 8
7.2.2.4 nr(s) 5
7.2.2.5 nr(s) 2
7.2.2.6 nr(s) 2
7.2.2.7 nr(s) 1
7.2.2.8 nr(s) 1
7.2.2.9 nr(s) 3
7.2.2.10 nr(s) 4
7.2.2.11 nr(s) 2
7.2.2.12 nr(s) 1
7.2.2.13 Stainless Hood 2500x1000x500H nr(s) 3
7.2.2.14 nr(s) 5
7.2.2.15 nr(s) 8
7.2.2.16 nr(s) 5
7.2.2.17 nr(s) 2
7.2.2.18 nr(s) 2
7.2.2.19 nr(s) 1
7.2.2.20 nr(s) 1
7.2.2.21 Fire Rate sqm 44
7.2.2.22 Labor Cost Lot 1
7.2.2.23 Testing & commissioning Fee Lot 1
8 Plumbing
8.1 Piping Work
8.1.1 Carbon steel Water Supply pipe For Piping Ø20(MR,WC) m 139
Exhaust Air Grill HS 150×150Exhaust Air Grill HS 200×200Exhaust Air Grill HS 250×250Exhaust Air Grill HS 300×300
Air Volume Damper VD-250×250Air Volume Damper VD-400×300Air Volume Damper VD-600×350
Fire Damper FD-300×300
Canvas Connection-250×250Canvas Connection-400×300Canvas Connection-600×350
Air Diffuser Box-300x300x300HAir Diffuser Box-350x350x350HAir Diffuser Box-400x400x400HAir Diffuser Box-450x450x400H
Louver Chamber- 650x650x400HLouver Chamber-1450x650x400HLouver Chamber-2650x650x400H
Bills of Quantities
Bill No.-: -Works22 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
8.1.2 Carbon steel Water Supply pipe For Piping Ø25(MR,WC) m 71
8.1.3 Carbon steel Water Supply pipe For Piping Ø32(MR,WC) m 18
8.1.4 Carbon steel Water Supply pipe For Piping Ø40(MR,WC) m 6
8.1.5 Carbon steel Water Supply pipe For Piping Ø50(MR,WC) m 18
8.1.6 Carbon steel Water Supply pipe For Piping Ø65(MR,WC) m 16
8.1.7 Carbon steel Water Supply pipe For Piping Ø80(MR,WC) m 15
8.1.8 nr(s) 1
8.1.9 nr(s) 1
8.1.10 Labor Cost Lot 1
8.1.11 Testing & commissioning Fee Lot 1
9 Water / Drainage System
9.1 Piping Work
9.1.1 m 55
9.1.2 m 41
9.1.3 m 40
9.1.4 m 63
9.1.5 m 89
9.1.6 m 114 m 38
9.1.7 m 58
9.1.8 m 74
9.1.9 m 17
9.1.10 nr(s) 2 nr(s) 2
9.1.11 Floor Drain trap 50A nr(s) 4
9.1.12 nr(s) 1
9.1.13 Soil Chamber 600x600x1000H nr(s) 1
9.1.14 Labor Cost Lot 1
9.1.15 Testing & commissioning Fee Lot 1
10 Sanitary
10.1 Sanitary Equipments
10.1.1 Moslem type Water closet (Flush valve,Paper holder,Hand-shower) nr(s) 6
10.1.2 European type Water closet (Flush valve,Paper holder) nr(s) 2
10.1.3 Urinal (Auto-Flush valve) nr(s) 8
10.1.4 Lavatory (Auto-Faucet) nr(s) 10
10.1.5 Mirror nr(s) 10
10.1.6 Labor Cost Lot 1
10.1.7 Testing & commissioning Fee Lot 1
11 Fire Fighting System
11.1 Indoor Fire Hydrant System
11.1.1 Equipment Work
11.1.1.1 FT-1 Fire Gravity Tank nr(s) 1
Gate Valve 80A (10K)
Valve Chamber 80A (10K)
PVC Soil Water pipe φ40(MR,WC)PVC Soil Water pipe φ50(MR,WC)PVC Soil Water pipe φ65(MR,WC)PVC Soil Water pipe φ75(MR,WC)PVC Soil Water pipe φ100(MR,WC)
PVC Vent pipe φ32(MR,WC)PVC Vent pipe φ40(MR,WC)PVC Vent pipe φ50(MR,WC)PVC Vent pipe φ65(MR,WC)PVC Vent pipe φ100(MR,WC)
Drainage fittings COB65Drainage fittings COB100
Vent Cap 100A
Bills of Quantities
Bill No.-: -Works23 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
11.1.1.2 Mobilization Fee Lot 1
11.1.1.3 Installation Fee Lot 1
11.1.1.4 Testing & commissioning Fee Lot 1
11.1.2 Piping Work
11.1.2.1 Carbon steel pipe Ø50(General) m 23
11.1.2.2 Carbon steel pipe Ø65(General) m 41
11.1.2.3 Fire Hydrant Hose Cabinet nr(s) 4
11.1.2.4 Labor Cost Lot 1
11.1.2.5 Testing & commissioning Fee Lot 1
11.2 Sprinkler System
11.2.1 Piping Work
11.2.1.1 Carbon steel pipe Ø25(General) m 515
11.2.1.2 Carbon steel pipe Ø32(General) m 99
11.2.1.3 Carbon steel pipe Ø125(General) m 119
11.2.1.4 Carbon steel pipe Ø150(General) m 3
11.2.1.5 Sprinkler Head nr(s) 216
11.2.1.6 Water Flow Ditecting device φ125 nr(s) 2
11.2.1.7 Testing Valve φ25 nr(s) 2
11.2.1.8 Labor Cost Lot 1
11.2.1.9 Testing & commissioning Fee Lot 1
Subtotal of (1) sum
Bills of Quantities
Bill No.-: -Works 24 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
(1) CIVIL/BUILDING WORK (EXTERNAL)
7 Air Conditioner / Ventilation sum NA
8 Plumbing sum
9 Water / Drainage System sum
10 Sanitary sum NA
11 Fire Fighting System sum
AC Works (Ac Units & Pipes, Installs)
Duct Work
Sanitary
Piping, Valve, Fitting (Plumbing, Hydrants)
Ventilation-FANs Work
Bills of Quantities
Bill No.-: -Works 25 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Total of 102
Bills of Quantities
Bill No.-: -Works 26 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
8 Plumbing
8.1 Equipment Work
8.1.1 WP-1 Booster Pump set nr(s) 1
8.1.2 WT-1 Water Tank nr(s) 1
8.1.3 Mobilization Fee Lot 1
8.1.4 Installation Fee Lot 1
8.1.5 Testing & commissioning Fee Lot 1
8.2 Piping Work
8.2.1 Carbon steel Water Supply pipe For Piping Ø25(Under Ground) m 29
8.2.2 Carbon steel Water Supply pipe For Piping Ø32(Under Ground) m 24
8.2.3 Carbon steel Water Supply pipe For Piping Ø50(Under Ground) m 31
8.2.4 Carbon steel Water Supply pipe For Piping Ø65(Under Ground) m 185
8.2.5 Carbon steel Water Supply pipe For Piping Ø80(Under Ground) m 36
8.2.6 Carbon steel Water Supply pipe For Piping Ø100(Under Ground) m 168
8.2.7 Carbon steel Water Supply pipe For Piping Ø125(Under Ground) m 87
8.2.8 Carbon steel Water Supply pipe For Piping Ø32(Outdoor) m 27
8.2.9 Carbon steel Water Supply pipe For Piping Ø65(Outdoor) m 11
8.2.10 Carbon steel Water Supply pipe For Piping Ø125(Outdoor) m 66
8.2.11 Carbon steel Water Supply pipe For Piping Ø32(MR) m 13
8.2.12 Carbon steel Water Supply pipe For Piping Ø50(MR) m 4
8.2.13 Carbon steel Water Supply pipe For Piping Ø125(MR) m 8
8.2.14 nr(s) 3
8.2.15 nr(s) 2
8.2.16 nr(s) 3
8.2.17 nr(s) 4
8.2.18 nr(s) 3
8.2.19 nr(s) 1
8.2.20 nr(s) 4
8.2.21 nr(s) 1
8.2.22 Float Valve 20A nr(s) 3
8.2.23 Flexible Joint 32A (SUS,500L) nr(s) 1
8.2.24 Flexible Joint 125A (SUS,500L) nr(s) 2
8.2.25 Vibration Isolated Joint 50A (Rubber) nr(s) 3
8.2.26 Vibration Isolated Joint 65A (Rubber) nr(s) 2
8.2.27 Vibration Isolated Joint 125A (Rubber) nr(s) 3
8.2.28 Labor Cost Lot 1
8.2.29 Corrosion Protective Taping Lot 1
8.2.30 Earth Work Lot 1
8.2.31 Testing & commissioning Fee Lot 1
11 Fire Fighting System
Gate Valve 25A (10K)Gate Valve 32A (10K)Gate Valve 50A (10K)Gate Valve 65A (10K)
Valve Chamber 25A (10K)Valve Chamber 32A (10K)
Butterfly Valve 125A (10K)
Level Regulating Valve 65A
Bills of Quantities
Bill No.-: -Works 27 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
11.1 Indoor Fire Hydrant System
11.1.1 Equipment Work
11.1.1.1 FP-1 Indoor Fire Hydrant Pump set nr(s) 1
11.1.1.2 Mobilization Fee Lot 1
11.1.1.3 Installation Fee Lot 1
11.1.1.4 Testing & commissioning Fee Lot 1
11.1.2 Piping Work
11.1.2.1 Carbon steel pipe Ø65(Under Ground) m 255
11.1.2.2 Carbon steel pipe Ø65(Outdoor) m 76
11.1.2.3 Carbon steel pipe Ø65(MR) m 15
11.1.2.4 Flexible Joint 65A (SUS,500L) nr(s) 2
11.1.2.5 Labor Cost Lot 1
11.1.2.6 Corrosion Protective Taping Lot 1
11.1.2.7 Earth Work Lot 1
11.1.2.8 Testing & commissioning Fee Lot 1
11.2 Outdoor Fire Hydrant System
11.2.1 Equipment Work
11.2.1.1 FP-2 Outdoor Fire Hydrant Pump set nr(s) 1
11.2.1.2 Mobilization Fee Lot 1
11.2.1.3 Installation Fee Lot 1
11.2.1.4 Testing & commissioning Fee Lot 1
11.2.2 Piping Work
11.2.2.1 Carbon steel pipe Ø65 (Under Ground) m 85
11.2.2.2 Carbon steel pipe Ø100(Under Ground) m 429
11.2.2.3 Carbon steel pipe Ø65 (Outdoor) m 14
11.2.2.4 Carbon steel pipe Ø100(Outdoor) m 79
11.2.2.5 Carbon steel pipe Ø100(MR) m 13
11.2.2.6 Fire Hydrant Hose Cabinet nr(s) 9
11.2.2.7 nr(s) 2
11.2.2.8 nr(s) 2
11.2.2.9 Flexible Joint 100A (SUS,500L) nr(s) 1
11.2.2.10 Labor Cost Lot 1
11.2.2.11 Corrosion Protective Taping Lot 1
11.2.2.12 Earth Work Lot 1
11.2.2.13 Testing & commissioning Fee Lot 1
11.3 Sprinkler System
11.3.1 Equipment Work
Gate Valve 100A (10K)
Valve Chamber 100A (10K)
Bills of Quantities
Bill No.-: -Works 28 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
11.3.1.1 FP-3 Sprinkler Pump set nr(s) 1
11.3.1.2 FP-4 Jockey Pump set nr(s) 1
11.3.1.3 Mobilization Fee Lot 1
11.3.1.4 Installation Fee Lot 1
11.3.1.5 Testing & commissioning Fee Lot 1
11.3.2 Piping Work
11.3.2.1 Carbon steel pipe Ø150(Under Ground) m 249
11.3.2.2 Carbon steel pipe Ø150(Outdoor) m 75
11.3.2.3 Carbon steel pipe Ø150(MR) m 10
11.3.2.4 Flexible Joint 150A (SUS,500L) nr(s) 2
11.3.2.5 Labor Cost Lot 1
11.3.2.6 Corrosion Protective Taping Lot 1
11.3.2.7 Earth Work Lot 1
11.3.2.8 Testing & commissioning Fee Lot 1
Bills of Quantities
Bill No.-: -Works 29 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Subtotal of (1) sum
Bills of Quantities
Bill No.-: -Works 30 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
(1) CIVIL/BUILDING WORK (OTHERS)
7 Air Conditioner / Ventilation sum
8 Plumbing sum
9 Water / Drainage System sum
10 Sanitary sum
11 Fire Fighting System sum
AC Works (Ac Units & Pipes, Installs)
Duct Work
Sanitary
Piping, Valve, Fitting (Plumbing, Hydrants)
Bills of Quantities
Bill No.-: -Works 31 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Total of 102
Bills of Quantities
Bill No.-: -Works 32 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7 Air Conditioner / Ventilation
7.1 Air Conditioner
7.1.1 Equipment Work
7.1.1.1 AC-1 Outdoor unit nr(s) 1
7.1.1.2 AC-1-1 Indoor unit nr(s) 2
7.1.1.3 Mobilization Fee Lot 1
7.1.1.4 Installation Fee Lot 1
7.1.1.5 Testing & commissioning Fee Lot 1
7.1.2 Piping Work
7.1.2.1Insulated Copper pipe(for AC) φ6.4 (General)
m7
7.1.2.2Insulated Copper pipe(for AC) φ9.5 (General)
m3
7.1.2.3Insulated Copper pipe(for AC) φ12.7(General)
m7
7.1.2.4Insulated Copper pipe(for AC) φ15.9(General)
m3
7.1.2.5Insulated Copper pipe(for AC) φ9.5 (Outside)
m5
7.1.2.6Insulated Copper pipe(for AC) φ15.9(Outside)
m5
7.1.2.7PVC Drainage pipe φ25(General)
m3
7.1.2.8PVC Drainage pipe φ50(General)
m7
7.1.2.9 PVC Drainage pipe φ50(Outside) m 5
7.1.2.10 Insulation of Drainage Pipeφ25(General) m 3
7.1.2.11 Insulation of Drainage Pipeφ50(General) m 7
7.1.2.12 Labor Cost Lot 1
7.1.2.13 Testing & commissioning Fee Lot 1
7.2 Ventilation
7.2.1 Equipment Work
7.2.1.1 FE-101 Exhaust Fan nr(s) 1
7.2.1.2 Mobilization Fee Lot 1
7.2.1.3 Installation Fee Lot 1
7.2.1.4 Testing & commissioning Fee Lot 1
7.2.2 Duct Work
7.2.2.1 Galvanized steel Rectangular Duct t=0.5mm (G26) sqm 5
7.2.2.2 nr(s) 2 Exhaust Air Grill HS 150×150
Bills of Quantities
Bill No.-: -Works 33 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
7.2.2.3 nr(s) 1
7.2.2.4 nr(s) 2
7.2.2.5 nr(s) 2
7.2.2.6 nr(s) 1
7.2.2.7 Labor Cost Lot 1
7.2.2.8 Testing & commissioning Fee Lot 1
8 Plumbing
8.1 Piping Work
8.1.1 Carbon steel Water Supply pipe For Piping Ø20(MR,WC) m 7
8.1.2 Carbon steel Water Supply pipe For Piping Ø25(MR,WC) m 2
8.1.3 Carbon steel Water Supply pipe For Piping Ø32(MR,WC) m 3
8.1.4 nr(s) 1
8.1.5 nr(s) 1
8.1.6 Labor Cost Lot 1
8.1.7 Testing & commissioning Fee Lot 1
9 Water / Drainage System
9.1 Piping Work
9.1.1 m 4
9.1.2 m 2
9.1.3 m 6
9.1.4 m 9
9.1.5 m 5
9.1.6 m 4
9.1.7 nr(s) 1
9.1.8 Floor Drain trap 50A nr(s) 1
9.1.9 nr(s) 1
9.1.10 Soil Chamber 600x600x1000H nr(s) 1
9.1.11 Labor Cost Lot 1
9.1.12 Testing & commissioning Fee Lot 1
10 Sanitary
10.1 Sanitary Equipments
10.1.1 Moslem type Water closet (Flush valve,Paper holder,Hand-shower) nr(s) 1
10.1.2 Lavatory (Faucet) nr(s) 1
10.1.3 Mirror nr(s) 1
10.1.4 Labor Cost Lot 1
10.1.5 Testing & commissioning Fee Lot 1
Air Volume Damper VD-150×150
Canvas Connection-150×150
Air Diffuser Box-300x300x300H
Louver Chamber- 450x450x300H
Gate Valve 32A (10K)
Valve Chamber 32A (10K)
PVC Soil Water pipe φ40(MR,WC)PVC Soil Water pipe φ75(MR,WC)PVC Soil Water pipe φ100(MR,WC)
PVC Vent pipe φ32(MR,WC)PVC Vent pipe φ40(MR,WC)PVC Vent pipe φ50(MR,WC)
Drainage fittings COB100
Vent Cap 50A
Bills of Quantities
Bill No.-: -Works 34 of 34
Bill No. Description of Work Unit QTYUnit Price
Total PricePrice Curr
Subtotal of (1) sum