Plasma Centre Indonesia Simplify process
Drilling Wastewater Treatment Unit
Plasma Centre IndonesiaWisma Bumi Putera lt. 15, Jln. Jendral Sudirman kavling 75,
Jakarta 12910
Plasma Centre Indonesia Simplify process
Plasma Centre Indonesia Simplify process
Drilling mud wastewater
wastewater
Plasma Centre Indonesia Simplify process
Basic Concept
Drilling wastewater pit Clean water
ECO-MOBILE is in-situ treatment process.
It was designed to treat wastewater which
generated from drilling process
in out
3
Plasma Centre Indonesia Simplify process
In-Direct plasma treatment concept
InletIn-DirectChamber
Filter
Ozone Generator
Water in
Water out
Plasma-UV
Ozone
Ozone generation using non-thermal plasma
Outlet
Plasma Centre Indonesia Simplify process
Treatment Concept
wastewater AOP Coag/sed filtration clearwater
Reduced organic and inorganic compounds
Reduced metals and solid particles
Reduced various micro particles
COD =100 (%) COD <10 (%) COD <1 (%) COD < 0.5 (%)
4
Plasma Centre Indonesia Simplify process
Drilling mud wastewater treatment
Drilling mud wastewater
Chemical
In-direct plasma
Treated water
Mud formation
Oil Industry
AC filter
COD removalDeodorizing
Neutralizing
Solid removal
In-situ drilling wastewater treatment
Plasma Centre Indonesia Simplify process
Treatment handling services
• Treatment Capacity : 1000 bbl/day• Wastewater type : Drilling mud• Inlet profile : various max COD 15.000 ppm• Outlet profile : COD 200 ppm (government
regulations)• Services cost : USD/IDR• Customer responsible : Drilling company
– Mob-deMob• PCI responsible :
– Electricity– Plasma Unit– Chemical– Operator
before after
Plasma Centre Indonesia Simplify process
Thanks