April 2005
T. J. Hill / NSNFP Technical Lead
Drop Testing Update -MCO and 24-Inch ISFP Test Canisters
![Page 2: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/2.jpg)
Drop Test Efforts
• Two 24-Inch Idaho Spent Fuel Project (ISFP) test canisters (modified versions of the standardized DOE SNF canister design) dropped 30 feet:
– 45-degree impact (24MOD-45-1)
– 70-degree impact for slapdown (24MOD-70-2)
• Two MCO test canisters dropped using repository drop criteria from WASRD, Rev 4:
– 23-foot vertical drop (MCO-00-1)
– 2-foot 60-degree (worst orientation) drop (MCO-60-2)
![Page 3: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/3.jpg)
MCO 23-ft Drop Test
![Page 4: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/4.jpg)
Pressure Testing – Post Drop
• Two ISFP test canisters (24MOD-45-1 and 24MOD-70-2)
– Held greater than 50 psig air steady for 1 hour• Two MCO test canisters (MCO-00-1 and MCO-60-2)
– Held greater than 50 psig air steady for 1 hour
![Page 5: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/5.jpg)
Helium Leak Testing – Post Drop• Two ISFP test canisters (24MOD-45-1 and 24MOD-70-2)
– Helium leak tested less than 1x10-7 std cc/sec (leaktight)
• Two MCO test canisters (MCO-00-1 and MCO-60-2)
– MCO-00-1 not greater than 1x10-5 std cc/sec (alternate test method due to prior internal helium contamination)
– MCO-60-2 less than 1x10-7 std cc/sec (leaktight)
![Page 6: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/6.jpg)
MCO Internal Helium Contamination
![Page 7: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/7.jpg)
ISFP Test Canister Deformations• Good analysis matches to actual deformations and strains
– Typically within 4% on deformations
– Good matches with measured strains
![Page 8: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/8.jpg)
ISFP Test Canister Deformations - cont.• No internal sleeves were used
• Localized “bumps” in shell due to internals
• Analysis accurately predicted these deformations within 2%
![Page 9: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/9.jpg)
MCO Test Canister Deformations - cont.• Good analysis matches to very small actual
deformations and strains
![Page 10: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/10.jpg)
ISFP Test Canister Internals
• No significant damage to ISFP internals
![Page 11: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/11.jpg)
MCO Test Canister Internals
Component Original Dimension Post-Drop Dimension Model Predicted DimensionCenter Post Length 29.278-in. 25-1/8-in. 25-5/16-in.Center Post Diameter 2.840-in. 3.047-in. 3.025-in.
• Only MCO-00-1 was cut open and only bottom basket was of interest
Basket cuts are from canister cutting efforts
![Page 12: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/12.jpg)
MCO Test Canister Contamination
• Radioactivity readily measured once top end of test MCO-00-1 cut off (tape applied after cutting open to prevent potential spread of contamination from holes)
• Disposed as low level waste at INL with less than 0.5 mr/hr reading
![Page 13: Drop Testing Update - MCO and 24-Inch ISFP Test Canisters](https://reader036.vdocument.in/reader036/viewer/2022062423/56814502550346895db1cbd9/html5/thumbnails/13.jpg)
Conclusion
• NSNFP issued two reports
– EDF-NSNF-045 for ISFPs
– EDF-NSNF-047 for MCOs
• NSNFP has demonstrated these DOE SNF canisters will not breach during repository defined drop events