Download - Dual Fuel Gas Turbine[1]
![Page 1: Dual Fuel Gas Turbine[1]](https://reader033.vdocument.in/reader033/viewer/2022050804/551502d84a7959d2028b511e/html5/thumbnails/1.jpg)
Tom Pogson
SUBJECT – Nominal 123MW Dual Fuel Gas Turbine
Dear Tom,
With regards to your inquiry on power plant, present the provision of two Brand New
PG9171-E123MW/50HZ Dual Fuel Turbines, unused and is currently in preservation
and storage.
These units are immediately available and subject to prior sale and are currently being
offered internationally.
Sook Sanan
![Page 2: Dual Fuel Gas Turbine[1]](https://reader033.vdocument.in/reader033/viewer/2022050804/551502d84a7959d2028b511e/html5/thumbnails/2.jpg)
Basic description and supply of the PG9171-E 123MW/50HZ Dual Fuel Turbines
Brand New Generator sets (2008 year of build).
Designed for high Ambient Temperatures
Package: 106 Ft Long 36 Ft High (Air Intake) X 10 Ft Wide Plus Electrical House &
Cooler Assembly.
Dimansions: Weights:
Gas Turbine: 12.66 m x 5.03 m x 5.05 m 202 tons
Accessory Compartment: 8.45 m x 3.45 m x 4.10 m 43.5 tons
Exhaust Plenum: 5.35 m x 3.45 m x 3.94 m 22.5 tons
Exhaust Accessories: 5.55 m x 3.65 m x 0.76 m 6.4 tons
Load Compartment: 5.30 m x 1.90 m x 1.05 m 4.6 tons
Installation and Commissioning are not included since I believe the final configuration
will be barge mounted. Budgetary price per unit is around US$ 38 million.
![Page 3: Dual Fuel Gas Turbine[1]](https://reader033.vdocument.in/reader033/viewer/2022050804/551502d84a7959d2028b511e/html5/thumbnails/3.jpg)
![Page 4: Dual Fuel Gas Turbine[1]](https://reader033.vdocument.in/reader033/viewer/2022050804/551502d84a7959d2028b511e/html5/thumbnails/4.jpg)
![Page 5: Dual Fuel Gas Turbine[1]](https://reader033.vdocument.in/reader033/viewer/2022050804/551502d84a7959d2028b511e/html5/thumbnails/5.jpg)