revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no: rev:
Section AA to West Proposed25 January 2012 1:50 093/491 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres
x
P16 30 January 2012
P16
21
093/41093/41
093/42 093/42
093/45093/45
65mm PIR roof slabs on existing asphalt
200mm quilt insulation + 45mm gap below soffit 12.5mm duplex plasterbord + lime plaster setting coat
Ceiling suspended 260mm o/a below soffit on metal hanger system
450 x 450 x 38mm pc slabs as ballast
15
2121
093/41093/41
093/42 093/42
093/45093/45
65mm PIR roof slabs on existing asphalt
200mm quilt insulation + 45mm gap below soffit 12.5mm duplex plasterbord + lime plaster setting coat
Ceiling suspended 260mm o/a below soffit on metal hanger system
450 x 450 x 38mm pc slabs as ballast
21
revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no: rev:
Section BB to East Proposed25 January 2012 1:50 093/491 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres
x
P16 30 January 2012
P16
50
60
093/41 093/41
093/42093/42
093/45 093/45
65mm PIR roof slabs on existing asphalt
200mm quilt insulation + 45mm gap below soffit 12.5mm duplex plasterbord + lime plaster setting coat
Ceiling suspended 260mm o/a below soffit on metal hanger system
450 x 450 x 38mm pc slabs as ballast
revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no:
East/front/seaward elevation Proposed30 January 2010 1:50 093/501 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres
MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! ! ! ! ! 23 ventilation cowls04 hardwood door! ! ! ! ! ! ! 24 vertical axis wind turbine!! ! !05 painted metal windows! ! ! ! ! ! 25 equipment & fuel store08 300 x 300mm matt-glazed tiles!! ! ! !09 rooflight on upstand! ! ! ! ! ! !
rev:
P14 5 August 2011
P14
093/41 093/41
093/42093/42
093/45 093/45
093/41 093/41
093/42093/42
093/45 093/45
11
05
04
03
22
19 19
23
03
01
02
01
02 02
2121
21
02 02
23
01
01
01
01
08
08
08
0202
05
21
01
11
0201
05
212121
revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no:
First Floor plan @ +2850 Proposed30 July 2010 1:50 093/431 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres rev: P16
P16 25 January 2012
dF2
dF9
093/
5209
3/52
093/
5209
3/52
093/53093/53
093/51093/51
093/47093/47
F7 Living room
F6 Dining
F8
F5 Kitchen
F2
F9
mv mvrw
rwflue
dF2
dF9
456 3810121314 11 9 7
Demolish 215mm skin. Rebuild brickworkms angle bolted to each skin as SE drg.11/909/04
Demolish 103mm skin. Rebuild across 65mm cavity
10mm gap
65mm injected PUR foam155mm sprayed hemp/lime insulation15mm nom. lime plaster setting coat
Demolish 215mm skin. Rebuild brickworkms angle bolted to each skin as SE drg.11/909/04
Demolish 103mm skin. Rebuild across 65mm cavity
65mm injected PUR foam155mm sprayed hemp/lime insulation15mm nom. lime plaster setting coat
70 x 50mm sw studs +120mm PIR insulation batts18mm FR plywood lining
093/
4909
3/49
093/
4809
3/48
fire place
revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no:
Ground Floor plan @ +1000 Proposed27 July 2010 1:50 093/421 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres rev:
P16 25 January 2012
P16
(250
mm
w. B
eam
B o
ver)
dG1
093/
5209
3/52
093/53093/53
093/51093/51
093/47093/47
+ 75
G8 Bedroom 3G7 Bedroom 2
G6 Bedroom 1
G1 Entry
G9 Bedroom 4
G2 Lobby
G5 WC
G3 Stair
093/
5009
3/50
(heat pump)
+ 0
Store
G4 Bathroom
dG5 dG4
dG3
dG9dG8
ddG2
dG1
stove
456
23 1
810121314 11 9 7
G10 Hall
(electric mains entry) mv mvrw
rwflue
10mm gap
Demolish 215mm skin. Rebuild brickworkms angle bolted to each skin as SE drg.11/909/04
Demolish 103mm skin. Rebuild across 65mm cavity
65mm injected PUR foam25mm corkboard +100mm Warmcel insulation in 100 x 50mm sw studs15mm nom. lime plaster setting coat
200mm w. rc nib + 110-190mm fin asSE drg. 11/909/10
70 x 50mm sw studs with 70mm PIR batts + 50mm PIR insulation batts
18mm FR plywood lining
70mm studs + 70mm Warmcel acoustic insulation in partitions
093/
4909
3/49
093/
4809
3/48
vp
revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no:
North flank elevation Proposed30 January 2010 1:50 093/531 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres
MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! 15 painted metal window! ! 23 ventilation cowls! ! ! ! ! 16 opening window, concealed frame! ! ! ! ! !! ! ! ! ! 17 painted metal ventilator! ! 24 vertical axis wind turbine09 rooflight on upstand! ! ! ! ! ! ! 25 equipment & fuel store
rev:
P14 5 August 2011
P14
11
25
093/45 093/45
093/44 093/44
093/43 093/43
093/42093/42
093/41 093/41x
11
07
02
01
01
19 19
21
23
23
11
01
02
03
01
01
21
07
01
(30)
16
16 16 16
16
16
11
01
11
25
02
03
01
01
19 19
21
(22)
24
07
(30)
16
1516
16 16
16wG15 wG16
wG17 wG20
wG18(G
F st
ove
flue)
wG15 wG16
wG17
wG18wG15 wG16
wG17
wG18
wG19
revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no:
South flank elevation Proposed30 January 2010 1:50 093/511 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres
MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 fairfaced concrete stack!! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! 15 painted metal window! ! 23 ventilation cowls! ! ! ! ! 16 opening window, concealed frame! ! ! ! ! !! ! ! ! ! ! ! ! ! ! 24 vertical axis wind turbine09 rooflight on upstand! ! ! ! ! ! ! 25 equipment & fuel store
rev:
P16 4 January 2012
P16
11
01
11
25
02
03
01
01
19 19
21
(22)
24
07
(30)
16
1516
16 16
16wG15 wG16
wG17 wG20
wG18
(GF
stov
e flu
e)
wG15 wG16
wG17
wG18wG15 wG16
wG17
wG18
wG19
revisions
client:
job:
drawing:
drawn: scale (onA3):
-DUNGENESS LINK HOUSE DUNGENESS KENT
drg. no:
West/rear/landward elevation Proposed30 January 2010 1:50 093/521 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres
MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! 15 painted metal-faced windows! ! 23 ventilation cowls! ! ! ! ! 16 painted metal-faced doors ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! 24 vertical axis wind turbine09 rooflight on upstand! ! 18 300 x 300mm concrete tiles! ! ! ! ! ! !
MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe