Methods of site improvement
• Removal and replacement• Preloading• Vertical drains• In-situ densification• Grouting• Stabilization using admixtures• Reinforcement
![Page 3: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/3.jpg)
Removal and replacement
• One of oldest and simplest methods is simply to remove and replace the soil
• Soils that will have to be replaced include contaminated soils or organic soils
• Method is usually practical only above the groundwater table
![Page 4: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/4.jpg)
Preloading
• Simply place a surcharge fill on top of the soil that requires consolidation
• Once sufficient consolidation has taken place, the fill can be removed and construction takes place
• Surcharge fills are typically 10-25 feet thick and generally produces settlement of 1 to 3 feet.
• Most effective in clay soil
![Page 5: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/5.jpg)
Advantages of preloading
• Requires only conventional earthmoving equipment
• Any grading contractor can perform the work
• Long track record of success
![Page 6: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/6.jpg)
Disadvantages of preloading
• Surcharge fill must extend horizontally at least 10 m beyond the perimeter of the planned construction, which may not be possible at confined sites
• Transport of large quantities of soil required• Surcharge must remain in place for months
or years, thus delaying construction
![Page 7: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/7.jpg)
Vertical Drains
• Vertical drains are installed under a surcharge load to accelerate the drainage of impervious soils and thus speed up consolidation
• These drains provide a shorter path for the water to flow through to get away from the soil
• Time to drain clay layers can be reduced from years to a couple of months
![Page 8: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/8.jpg)
Vertical Drains
![Page 9: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/9.jpg)
PVD (Prefabricated Vertical Drain)
• Geosynthetics used as a substitute to sand columns
• Installed by being pushed or vibrated into the ground
• Most are about 100 mm wide and 5 mm thick
![Page 10: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/10.jpg)
Vertical Drain Installation
Photo from: http://www.joostdevree.nl/bouwkunde/vertical_drain_2_www_imtek_com_tr.jpg
![Page 11: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/11.jpg)
Photo adapted from vertical drain supplier
![Page 12: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/12.jpg)
![Page 13: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/13.jpg)
Typical installation of PVD• Typically spaced 3 m
on centers
Prefabricated Drains Available in Malaysia
•Nylex
•Emaskiara
• etc
![Page 14: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/14.jpg)
In-situ densification
• Most effective in sands• Methods used in conventional earthwork are
only effective to about 2 m below the surface
• In-situ methods like dynamic deep compaction are for soils deeper than can be compacted from the surface
![Page 15: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/15.jpg)
Dynamic vs. Vibratory
![Page 16: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/16.jpg)
Compaction
sand
clay
Photo adapted from Monash Univ. CIV4249
![Page 17: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/17.jpg)
Vibratory probe compaction
• Long probe mounted onto a vibratory pile driver compacts the soil around the probe; penetrations spaced in a grid pattern similar to vertical drains
![Page 18: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/18.jpg)
Vibratory probe compaction
![Page 19: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/19.jpg)
Photo by: Keller Holding
![Page 20: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/20.jpg)
Beware of transmission of ground vibrations
![Page 21: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/21.jpg)
Vibroflotation
• Probe includes the vibrator mechanism and water jets
• Probe is lowered into the ground using a crane• Vibratory eccentric force induces densification
and water jets assist in insertion and extraction • Vibratory probe compaction is effective if silt
content is less than 12-15% and clay is less than 3%
• Probes inserted in grid pattern at a spacing of 1.5 to 3 m
![Page 22: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/22.jpg)
Photo by: Keller Holding
Reclamation works - Singapore
![Page 23: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/23.jpg)
VibroflotationGround Type Relative
Effectiveness Sands Excellent
Silty Sands Marginal to Good
Silts Poor
Clays Not applicable
Mine Spoils Good (if granular)
Dumped Fill Depends upon nature of fill
Garbage Not Applicable
![Page 24: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/24.jpg)
Vibro-replacement stone columns
• Vibro-Replacement extends the range of soils that can be improved by vibratory techniques to include cohesive soils. Reinforcement of the soil with compacted granular columns or "stone columns" is accomplished by the top-feed method.
![Page 25: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/25.jpg)
Vibro replacement – Jelutong Expressway
Photo by: Keller Malaysia
![Page 26: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/26.jpg)
![Page 27: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/27.jpg)
Stone Column
Photo by: Keller Malaysia
![Page 28: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/28.jpg)
Top-feed vibroflot rig
Adding stone in top-feed installation Bottom-feed vibroflot rig
Vibro-replacement stone columns
![Page 29: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/29.jpg)
Dynamic compaction
• Uses a special crane to lift 5-30 tons to heights of 40 to 100 feet then drop these weights onto the ground
• Cost effective method of densifying loose sands and silty soils up to 15 to 30 feet deep
![Page 30: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/30.jpg)
Grouting
• Defined as the injection of a special liquid or slurry material called grout into the ground for the purpose of improving the soil or rock
• Types of grouts– Cementitious grouts– Chemical grouts
![Page 31: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/31.jpg)
Grouting methodsIntrusion grouting– Consists of filling joints or fractures with grout– Primary benefit is reduction in hydraulic conductivity– Used to prepare foundation and abutments for dams– Usually done using cementitious grouts
Permeation grouting– Injection of thin grouts into the soil– Once the soil cures, becomes a solid mass– Done using chemical grouts– Used for creating groundwater barriers or preparign
ground before tunneling
![Page 32: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/32.jpg)
Graphic source: Keller
![Page 33: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/33.jpg)
Grouting methods
• Compaction grouting– When low-slump
compaction grout is injected into granular soils, grout bulbs are formed that displace and densify the surrounding loose soils.
– Used to repair structures that have excessive settlement
![Page 34: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/34.jpg)
Grouting methods
Jet grouting– Developed in Japan– Uses a special pipe with horizontal jets that inject grout
into the ground at high pressures– Jet grouting is an erosion/replacement system that
creates an engineered, in situ soil/cement product known as Soilcretesm. Effective across the widest range of soil types, and capable of being performed around subsurface obstructions and in confined spaces, jet grouting is a versatile and valuable tool for soft soil stabilization, underpinning, excavation support and groundwater control.
![Page 35: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/35.jpg)
![Page 36: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/36.jpg)
Stabilization using admixtures
• Most common admixture is Portland Cement• When mixed with soil, forms soil-cement which is
comparable to a weak concrete• Other admixtures include lime and asphalt• Objective is to provide artificial cementation, thus
increasing strength and reducing both compressibility and hydraulic conductivity
• Used to reduce expansion potential of clays• Used in surface mixing applications
![Page 37: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/37.jpg)
A 500 m long embankment had to be constructed on a 4-5 mthick, extremely soft, silty clay layer of the Humber estuary atHull, Great Britain.To guarantee the stability of the embankment,soil improvement of the silty clay was required. LCM offered ageotechnical solution by means of dry-deep soil mixing.
Photo by: LCM/Keller
![Page 38: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/38.jpg)
Reinforcement• Soil is stronger in compression than in
tension• To improve strength in tension,
geosynthetics placed in soil for soil reinforcement
![Page 39: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/39.jpg)
Soft Soil
Kong, A.L.L. (2005), Jurutera, June 2005 No.6, IEM.
![Page 40: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/40.jpg)
Soil improvement
Photo by A Naser Abdul Ghani
![Page 41: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/41.jpg)
Soil improvement
Photo adapted from Bulletin Ingeniur
![Page 42: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/42.jpg)
Reinforced earthwallconstruction
![Page 43: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/43.jpg)
Soil Nailing
• The fundamental concept of soil nailing consists of reinforcing the ground by passive inclusions, closely spaced, to create in-situ a coherent gravity structure and thereby to increase the overall shear strength of the in-situ soil and restrain its displacements.
![Page 44: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/44.jpg)
![Page 45: Earthwork and Ground Technology Site Improvementsite.iugaza.edu.ps/mawad/wp-content/uploads/soilimprov.pdf · Earthwork and Ground Technology Site Improvement ... • Method is usually](https://reader035.vdocument.in/reader035/viewer/2022062317/5ebef1823c55aa71102184a0/html5/thumbnails/45.jpg)
Photo by A Naser Abdul Ghani