Eastchester Union Free School District
Pre-Bond Planning 2007-2008
Presenter:
Marilyn Terranova, Ph.D. – Superintendent of Schools
LowerLevel
First Floor
Second Floor
ThirdFloor
Eastchester Union Free School District
Proposition One
First FloorMiddle School & High School
High School
Shared Wing
Middle School
Eastchester Union Free School District
Proposition One
First Floor Highlights
Old GymnasiumRevovated toNew CafeteriaCapacity 260+
Commons:•Meeting space for student clubs during lunch hours•Small group instruction space during instructional time
Other school uses:•Study halls •Small group instruction
Community uses:•Holding large scale events that can be catered•General community meetings
First floor of the Eastchester High Schoolto replace the footprint of the existing cafeteria
1st Floor Middle School
Eastchester Union Free School District
Proposition One
Second FloorMiddle School & High School
High School
Shared Wing
Middle School
Eastchester Union Free School District
Proposition One
Second Floor Highlights
Mezzanine to High School Cafeteria
Current old gymnasium
School uses:•Additional eating area for students•Meeting lunch space for staff•Small group instruction•Drop in study center•Wireless laptop use
Second Floor High School Addition
Second Floor Middle School Addition
New Middle School Elevator from 1st floor to 2nd floor
ADA Requirement
Eastchester Union Free School District
Proposition One
Third FloorHigh School
High School
Eastchester Union Free School District
Proposition One
Third Floor Highlights
3rd Floor High School Addition
Eastchester Union Free School District
Proposition One
Lower Level“Basement”
“Utilizing Every Square Inch”Utilizing Every Square Inch”
High School
Eastchester Union Free School District
Proposition One
Lower Level Highlights
Lower LevelHigh School
Eastchester Union Free School District
Additional Needs
“Proposition Two”
Middle School Cafeteria Expansion
Instrumental Lesson Rooms
Two Instrumental Lesson Rooms410 Square feet each
Middle School Cafeteria Expansion
Instrumental Lesson Rooms
Middle School Cafeteria Expansion
provides an additional 1235 square feet
HighlightsHighlightsHighlightsHighlights
There will be a bond referendum, comprised of 2 propositions, put before voters in the Eastchester School District on March 19,
2008.
The plans for the renovation and
construction project at the High School and Middle School include the following:
At Eastchester High School (largely using the existing building footprint where the cafeteria is currently located):
•7 NEW general education classrooms•4 NEW small group instruction classrooms•4 NEW science (lab) rooms•1 NEW art classroom•1 NEW physical education/fitness station •4 NEW toilet rooms •3 RENOVATED art classrooms•2 RENOVATED small group instruction classrooms•Renovated cafeteria (relocated) with a commons and multi-purpose room and drop-in study center
Proposition 1 ($19,600,000)Proposition 1 ($19,600,000)Proposition 1 ($19,600,000)Proposition 1 ($19,600,000)
•4 NEW general education classrooms•1 NEW technology classroom•1 NEW science/lab•1 NEW elevator
Proposition 1 ($19,600,000)Proposition 1 ($19,600,000)Proposition 1 ($19,600,000)Proposition 1 ($19,600,000)At Eastchester Middle School:
•2 NEW instructional music/multipurpose rooms •Renovation/expansion of cafeteria
Proposition 2 ($1,285,000)Proposition 2 ($1,285,000)Proposition 2 ($1,285,000)Proposition 2 ($1,285,000)At Eastchester Middle School: