Download - Ecocity Presentation - Ecolog International
City Solutions
EcoCity A division of Ecolog International
City Solutions
2. Mission & Commitment 6
2.1 EcoCity Operation Center 8
2.2 Awareness Creation Campaign/Program 13
2.4 Transfer Station Management 23
2.6 Recycling 27
2.8 Waste Incineration 34
2.9 Management of Urban Infrastructures 37
2.10 Green Spaces Management 42
2.11 Waste Water Management 44
2.12 Hazardous Waste 47
2.17 QHSE 60
Content
4
History
supporting international missions in the
Balkans
Ecolog International
Strategic Goals
international safety and health standards
Exceed customers’ expectation is our motto
in the most rural zones of the world
Create long-lasting customer relations by ensuring
Core Principles
Complying with the international Health, Safety
Ecolog is committed to highest integrity and ethical
standards
Performance
State-of-the-art, scalable ICT system (SAP)
High ethical standards, dedicated employees
Long-term client relationships
6
EcoCity adivisionofEcologInternationalVersionECOCSGC0001Nov2012
may be done in sorting plants, transfer stations,
compact incineration plants, etc. We do this as a BOOT
model (Build-Own-Operate-Transfer); EcoCity designs and
of time.
After the end of the BOOT contract the plant will be
transferred to the Municipality based on the contractual
agreements.
infrastructures will be released; parallely a technology and
plant to the customer after the agreed operations period.
Invest in the Environment
7
Turn-Key SolutionsThe management of urban infrastructures is increasingly
becoming a complex challenge for municipalities.
and operations of tasks can raise the costs and exceed
public budgets.
Based on our standardized approach of complex project
management and integrated operation centers, we are
the utmost satisfaction of our customers. The customer
The focus of our philosophy is the long-term partnership
with our customers. Therefore we are able and willing to
commit to contracts not only for one or two years; the
always is in the forefront of EcoCity’s mission.
harsh conditions.
complete maintenance know-how and experience at
command.
Latest
Technology ‘made-to-last’
8
EcoCity’s Operation Center will take care of the planning, Furthermore the Operation Center will act as a Customer
and coordinated.
Operation Center
2.1Ecocity
Operation Center
Operations Center of Rio de Janeiro/Brazil Municipality
based on IBM Smart City Concept
9
Regional Structure and District Management
etc. in the system.
the database. Buildings, plots, industrial areas and other
necessary facilities will be maintained in the database
including the complete address and contact information.
High Level Process Operations Center
Project Planning
Ope
rati
ons
Cent
erM
obili
zati
on
Project Execution Project MonitoringProject Mobilization Customer InteractionCenter
MaterialsWorkforceVehiclesContainer
The city electronic map will be imported into EcoCity’s
eMap solution. Once the data is uploaded, GPS coordinates
will be linked to the address and district management.
The eMap database will be maintained by EcoCity’s
planning team in close cooperation with the city planning
department of the customer.
The integration of objects/GPS data in eMap will support
10 Operation Ceanter
Waste Bin ManagementEach waste bin will be registered in the database including
key data i.e. manufacturer’s name, production year, supply
period.
sizes of households.
Waste bins range from 120l, 240l, to 1,100l capacity. Our
the bin after putting the waste; solid rubber tires for easy
exact position will be read with a handheld scanner and
location data will be synchronized with EcoCity’s database
system.
to minimize the risk of accidents.
Barcode
RFID Key Reader Bin with Key/Barcode
11
Vehicle Management
information like manufacturer’s name, production year,
registration number, serial number, weight, maximum
parts details will also be entered into the database.
and operating hours are monitored. The information in
lists, spare parts planning and forecasting.
Workforce Management
coordinated through the operations center. Employee
teams.
be done on an ongoing basis and teams will be assigned to distributed and the teams will get a brief on the shift tasks.
12
Operational Route Planning
Collection Calendar
EcoCity will conduct a detailed planning and ongoing
optimization of the routes.
into consideration.
JULY 2012 AUGUST 2012 SEPTEMBER 2012Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Sun Mon Tue Wed Thu Fri Sat
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
OCTOBER 2012 NOVEMBER 2012
map.
Operation Center
EcoCity will create a waste collection calendar which will
be distributed to all households and the municipality. This
calendar will clearly show what kind of waste (household time mentioned.
13
A critical component in any waste management program
is public awareness and participation in addition to
appropriate legislation, strong technical support and
2.2Awareness
Creation Program
14
the citizens on proper waste management concepts. This
will support public awareness and participation resulting in
successful waste management.
Our experience shows that an awareness creation program
acknowledged within the municipality and EcoCity will
publicize the results so that people are aware of changes,
We realize this through :
Banners and posters put up throughout the city and
areas.
Waste inspection teams
Courses aimed at educating school teachers on
waste management issues who will in turn educate
their students.
the impacts of poor waste management on health
feature distinguished people from politics, religion,
economy or society
Awareness Creation Program
Metal and glass take the longest to dissolve
Never leave your trash out of the bin
Dispose your waste in separate bins
Teach your children how to reduce waste
of tons of solid waste. This waste has to be handled in the
In some cases the costs for the management of waste
EcoCity welcomes this challenge and is ready to support
waste management based on international standards but
always adapted to the local situation.
waste management experts – for sure we will care for your
needs!
Introduction
Solid Waste Management
16
Land
fill
Refu
se-d
eriv
ed fu
el
(RD
F)Ce
men
t Pla
nt
Com
post
ing
Plan
tAg
ricul
ture
Pape
r & C
ardb
oard
In
dust
ry
Sort
ing
Plan
t
PET
Recy
clin
g
Gla
ss R
ecyc
ling
Plas
tic R
ecyc
ling
Met
al In
dust
ry
Trea
tmen
t / L
andfi
ll
Inci
nera
tors
Colle
ctio
n Sy
stem
Tota
l Gen
erat
ed
Hou
seho
ld W
aste
Slau
ghte
r Hou
se
Hos
pita
lH
azar
dous
Was
te
Cent
er
Was
te Tr
eatm
ent
Plan
t
Biol
ogic
al k
itche
n &
Gar
den
Was
te, W
ood
Pape
r, Ca
rton
Plas
tics,
Plas
tic F
oils
PET
and
PE B
ottle
s
Gla
ss
NE
Met
als,
FE M
etal
s
Haz
ardo
us W
aste
Hos
pita
l Was
te
Slau
ghte
r Hou
se W
aste
Dia
pers
, Hyg
enic
s
Tetr
apac
k,St
yrop
or, T
extil
e,Ru
bber
, Sho
es
Ston
es, B
ricks
Mor
e th
an 4
0mm
Oth
ers
Solid
Was
te F
low
17
Rapid Cleaning Intervention
communities.
With a fast-track analysis, we deploy a number of teams
loaders, bobcats will be used following a structured rollout
plan.
interruptions that result from the deployment of our
cleanup crews.
We also understand that during long periods of waste
City Centers / Market AreasIn municipalities some areas like market areas or small
roads in historical districts may be inaccessible for garbage
collection.
Pick-up trucks are used to collect the waste from smaller
inaccessible roads. In market areas, waste collectors are
deployed with electro carts, wheel-barrows and hand tools
that help in collecting the waste from the market booths.
collect the waste and transport it to the next transfer
the market operation.
18
Industrial WasteEach kind of trade and industry generates waste that is
be segregated depending on their components and
Corresponding to the handled raw materials and
pre-products, EcoCity will check the generated waste and
Production waste
Hazardous waste
for the waste disposal.
The waste will be collected either based on a schedule
(recommended for smaller companies) or based on
companies).
Skip trucks will collect and replace the skips at the location
of the company.
Solid Waste Management
Household WasteA well organized disposal of waste is an integral part of
fostering good health of the population and leads to
EcoCity will collect the waste from households based on a
scheduled collection scheme on a regular basis.
be scanned to document the collection date and time.
minimize the risk of accidents.
19
Construction and Demolition Waste
done if a construction site has to be cleared shortly and
there is no time for sorting and recycling.
Construction and demolition waste can be used for the
Ideally construction and demolition waste will be crushed
construction, road stabilization or for the construction of
sound barriers along highways.
For the immediate use of crushed material a mobile crusher
will be set up on the construction site.
disposal of construction and demolition waste, EcoCity will
analyze the construction and demolition waste regarding
hazardous substances like asbestos.
Medical WasteMedical waste is a special waste particularly with regard
to the composition. The waste may contain some types of
hazardous substances.
which may be hazardous like
Body parts
Blood and blood residues
Contaminated bandages and bed linens
containing mercury
EcoCity will collect medical waste in special containers
For the transportation, special box trucks will be used to
transport the medical waste to a waste incineration plant
20
Bulk WasteBulk Waste is non-hazardous waste which is too big or
EcoCity will create a periodical bulk waste collection
calendar which will be distributed within the communities.
The calendar will show the exact dates and areas for bulk
waste collection.
Optionally citizens can contact EcoCity’s Operations Center
in order to arrange the collection of bulk waste. In this case
the operations center will agree a pickup date on which the
bulk waste will be collected.
River Cleaning
groundwater pollution and odor nuisance Furthermore
water. All of these problems may lead to health risks for
processing or disposal.
steel grids which will be specially designed for the
particular need. These steel grids will be installed at the
than the collection out of the water.
Beach Cleaning
reputation often depends on the cleanliness of the beaches.
generating business and boosting the city’s economy.The cleaning of beaches is usually done after sun dawn to
limit disturbance.
Solid Waste Management
21
Ad Hoc Requests
Waste bins were skipped or demolished
Waste bins were stolen
People littered larger amounts of waste on streets,
earliest.
Based on the importance of the incident the operation
Agreement.
Document Destruction
years.
and discrete destruction of documents and records for
public administration and commercial sector.
will shred the documents on site and in presence of the
customer’s person in charge.
The paper waste produced will be processed in a sorting
Rental of Roll-Off and Skip Containers
The container will be picked up and according to its
treatment or disposal.
The following containers will be provided for rental:
Skip Containers 1m3 3, 7m3, 10m3 open or with
lid
3, 20m3, 36m3, 40m3 open
or with lid
3, 20m3
22
GSM / GPRS
WLAN
UMTS
SOAP / XML
SMS
DispositionParameter
Orders Key Figures
Hand readerTransponder recognition
Order management
Vehicle scale
Rear view camera
Wireless Communication GPS / DGPS Tracking
GPS UKW UKW / RDS / TMC
Vehicle Engine / BodyPour
Pour timingTruck-Trailer
ScaleDynamic
Container scale
IdentTransponder reader
4-Wheel / CombRight - hand pour
NMEA Text
BluetoothWLAN
CANxxxCANopenGateway
BDE-Bus RS 485CleANopen
(in preparation)
CE-Onboard computerOrder management
Time captureTour recording
NavigationRemote maintenance
BDE-Bus RS 485s RRSCleANopen Noope
n)(in preparation)arrat
ece
Waste Collection Equipment
compliance with European standards which will support
according to European standards. Global Positioning
Systems (GPS) will enable monitoring and scheduling of all
3, 8m3, 12m3, 16-28m3,
22-24m3, and 30-40m3. Small pick-up trucks are used to
collect waste from narrow roads.
the system “One Stop”. This system allows the emptying
and washing of waste bins 60-1,100l in one process and will
support the reduction of pests and odor. EcoCity suggests
the deployment of such trucks with rotating shifts in order
to clean each waste bin on regular basis.
Solid Waste Management
23
Transfer Station
ManagementTransfer Stations play an important role in a community
disposal facility.
EcoCity recommends transfer stations for the primary
reason of reducing the cost of transporting waste to
disposal facilities. Consolidating smaller loads from
sites and spend more time collecting waste.
Garbage trucks which collect the waste in the districts
compactor 10-12 tons)
management of your waste transfer stations.
We will analyze the needs and compare it with the existing
structure and based on the gap analysis, we will optimize
the facilities.
24
economic handling of all waste collection streams. Waste
Additionally transfer stations act as collection point
household hazardous waste or electronic waste.
EcoCity’s Transfer Station Management includes the
incineration plant. Regular reports and recommendations
management program.
maintenance as well as breakdown maintenance will be
maximize the lifespan of the plant.
Transfer Station Management
Mobile Transfer Stations
community is not always feasible.
the deployment of 40” waste compactor trailers. If during
the waste collection a garbage compactor is loaded it will
reload the waste into the waste compactor trailer.
Waste compactor trailers will be positioned at central
and noise and odor nuisance while deciding the location.
One waste compactor trailer is able to load the waste of
3-4 garbage compactors before it transports the waste to a
ensure a redundancy of waste compactor trailers in order
to minimize waiting times of garbage compactors.
EcoCity’s philosophy is based in the reduction of MSW
this reduction by maximizing recy cling.
As solid waste disposal costs continue to rise, recycling
redundant.
processing step between the collec tion of recyclable
materials from waste generators and the sale of recyclable
materials to markets for use in making new products.
Sorting Plant
Management
26
3.
construction uses rotating blades to open bags or
boxes with mixed communal waste. Incl. eco tank
transported to septic tanks or public sewage system.
Sorting drum for waste selection according to type,
structure and size. The length of the screw rotation
and preparation for further selection is obtained.
and airing of the waste to be forwarded to the
sorting line.
waste and waste residues from the sorting drum;
organic waste will be forwarded to the composting
incineration plant.
wide. The belt speed is adjustable to the processing
progress.
Container sorting unit with a length of 24 m; made
of prefabricated containers 3 and 4 m wide, placed
music system for the creation of a good working
Containers for the collection of extracted waste.
Extracted waste will be thrown in chutes beside the
workers from where it will go to the container.
At the end of the sorting process magnetic
separators will be installed for the separation of
ferromagnetic metals. The extracted ferromagnetic
metals will be transported to a separate container.
Furthermore roll containers are placed for the
collection of (crushed) glass, not separated and
other waste.
Automatic baler for the compacting and baling of
extracted waste – paper/cardboard, metal, plastic.
Storage area for the baled waste fractions.
Material Recovery Management
Sorting Plant – Functionality
1
1
2 3 4 6 7 8 9 10
26
7
8
9
10
3
4
27
2.6Recycling
to follow the 4R approach - Reduce, Reuse, Recycle and
like returnable glass bottles; recycling of waste like plastic
from waste and only what cannot be processed will be
Recyclable waste fractions will be extracted from the
waste in sorting plants. The extracted materials will be sold
to manufacturers in order to process new materials out of
the used materials.
EcoCity will care for the handling of the extracted waste
and trade on local and international markets.
28 Recycling
EcoCity Recycling Paper
1 CollectionPaper collected by EcoCity’strucks. Paper transported to paper recycling plant. 2 Sorting
Paper manually sorted and controlled
3 ProcessingPaper is thermo chemically processed into paper pulp
+
4 Screening & cleaning
Screening and cleaning the pulp removes small contaminants and particles
5 PapermakingThe pulp passes through a large paper machine to produce large rolls of paper
6 Paper productsPaper is re-rolled into smaller paper products such as toilet paper and towels
Recycling
29
EcoCity Recycling Plastic
1 CollectionPlastic collected by EcoCity’strucks. Plastic transported to plastic recycling plant.
2 SortingPlastic manually sorted and controlled into:- Polyethylene (PE)- PET bottles
3 ProcessingPOLYETHYLENE initial recycling process includes:1. Shredding2. Cleaning3. Primary Collection for further treatment
PET Bottles initial recycling process includes:1. Grinding2. Placed in bags3. Ready for further processing
+
4
the drying drum
5 PE pellets
processed in extruder and transformed into PE pellets
6 New productsPE pellets are mixed with virgin pellets to make new bags and plastic pipe
Drying
+
30 Recycling
EcoCity Recycling Metal
1 CollectionMetal collected by EcoCity’strucks. Metal transported to metal recycling plant.
2 SortingMetal waste is manually separated according to the metal type
3 Processing
4Metal blocks are transported to other metal processing plants
Export
Metal is pressed into blocks by a metal hydraulic compactor
31
using a complex technology. Therefore it is important to
systems and leachate recirculation. Proper operations will
does not penetrate the liner and damage the leachate
collection system.
The leachate collection system has to be embedded in a
be placed to maintain the stability of the slope.
Management
32
by raising operation and maintenance issues that need
to be considered already during the design phase. This
may be a construction and debris recycling center, green
waste composting area, hazardous waste transfer station
Optimization
Based on the condition audit, a gap analysis will be done
and in close cooperation with the municipality we will
Leachate recirculation and control
Flare gas extraction and control
Setup of a new disposal area
Operations
- Liners
- Compacting
- Soil stabilization
- Capping
scales, etc.
Regular reporting to the municipality incl. capacity
forecasting
33
Decommissioning / Renaturation
it reaches its planned capacity.
and renaturation works during and after the end of the Landscaping works
Equipment
after waste disposal
layers
of soil/sand/construction waste layers
of trucks, issuing of disposal notes, operations
coordination
34
an integral part of the waste cycle as some waste fractions
the treatment of certain waste types in niche areas
such as clinical wastes and certain hazardous wastes
where pathogens and toxins can be destroyed by high
temperatures.
Examples include chemical multi-product plants with
2.8Waste
Incineration
Waste Incineration
Solutions
predominantly for medical waste and certain types of
hazardous materials as well as limited amounts of municipal
solid waste.
Capacities up to 170 m3/day
EcoCity works with distinguished manufacturers from
Germany and Europe.
The picture below shows our waste incineration plant 100
m3/day (manufacturer Michaelis Germany).
EcoCity is operating this incineration plant since 2011 in
Mazar-e-Sharif/Afghanistan.
Incinerator Container
ram feeder system.
In case a ram feeder is used, it will shift and mix the waste
in the incinerator.
The waste is incinerated in a rigid incineration chamber.
Combustion air is blown into the incinerated material by a
nozzle system controlled by the incineration parameters.
A burner system is installed to start up the incinerator and
In emergency cases a sprinkler system is installed inside the
incinerator. The sprinkler system is connected to a water
tank. The combustion chamber is lined entirely with high
oxide content and is resistant to wear.
The construction of the incinerator is made in a way that
smaller explosions will not cause damages which endanger
the operators.
36
Post Combustion Container
burnt components as this would produce soot and smell.
The chamber is designed to completely oxidize all organic
components and CO. This is realized through the installation
air is controlled by a oxygen measurement.
In order to compensate the pressure shocks caused by
of the second combustion chamber. The exhaust is also
used as emergency stack to protect the operators and the
is oxidized and practically free from organic components,
soot, smell and CO.
Auxiliary Parts Container
The cleaned gases are released into the air through the
stack.
The auxiliary parts container is also used for the combustion
second combustion chamber.
Waste Incineration
Ecocity medic waste incinerator
37
be managed in the most professional manner.
The repair and marking of roads is important for a
broken down will be assisted and in case an immediate
next workshop. Furthermore roadside assistance will
the streets.
risk of accidents.
2.9Management of
Urban Infrastructure
38 Urban Infrastructure
Community Cleaning
municipalities.
EcoCity deploys an array of modern technology and
location.
community places and streets. If an area has fallen below
the high standards of cleanliness expected, we will respond
back up to the standards.
executes a Litter Control Strategy to promote the message
that littering is unacceptable socially and can be ended by
a few simple measures.
Classification
High and main streets
Secondary streets
Commercial streets and public places
According to the size of the road, large or small city
sweepers will be used. Small city sweepers will be used
which are not accessible by city sweepers will be cleaned
manually. Therefore EcoCity will deploy waste pickers and
workforce which will clean the litter and dust using brooms,
rakes, wheel-barrows and other tools.
Street SprayingIn order to reduce the dust on roads and to minimize
contamination of apartments and houses, water sprayer
streets.
39
Disposal of Litter, Sand and Dust
and shrubs
Illegal dumps of waste
Waste collected from public trash bins
EcoCity recommends to use most of this waste for
composting. Visible hazardous waste will be sorted out
before composting and non-compostable waste can be
extracted after the composting process.
handle as it may contain losses of drips from motor oils,
fuels, abrasion of tyres and brakes. Therefore sweepings
are rated as water pollutants and will be used as spacing
Equipment
Road sweepers large and small
Flushing trucksbins and repositories for sweeping
40
role for the security of a city. plan for each item.
regular cleaning and inspection cycles will be scheduled.
the functionality of these systems within shortest possible
Solar Street LightsToday the technology of solar street lights is a standard
external power source – except sunlight.
rechargeable batteries. The batteries are installed in the
light case or in the solar street light foundation.
Sensors will switch on the light during dusk and switch it
The controller will scrutinize the battery capacity and
automatically adjust the light intensity in case of low
battery capacity.
Solar street lights will be managed through EcoCity’s
immediately report breakdowns to the operation center.
solar street light.
example special designs for shopping areas or public
places.
Traffic Light, Street Light and Traffic Sign Management
Urban Infrastructure
41
Road Maintenance and Marking
EcoCity understands the importance of road infrastructure
In case a road defect is detected, the issue will be recorded
the closest road maintenance team in order to get the
repair done at the earliest possible time.
Road markings will be registered in EcoCity’s district and
be setup in order to regularly check the condition of road
markings and renewing them in case they are worn out.
Roadside Assistance In cooperation with international automobile associations, truck will transport the car to the next workshop.
road and bring them to the next workshop or collection
point.
Road Construction Security
Plastic curbs
Temporary road markings
Trailers with warning indicators
42
EcoCity manages green parks focusing on the following
Gardening
Landscaping
Irrigation
Green Space Management
2.10Green Space
Management
43
Gardening
Parks and green spaces will be regularly cleaned from litter;
walkways will be swept; public waste bins will be emptied
according to EcoCity’s Community Cleaning Plan.
holidays etc. will be taken into consideration for the
gardening plan.
Landscaping
park areas.
Walkways / Lawns
Fountains
Play areas
Sports areas
Parking areas
Irrigation system
Irrigation SystemsEspecially in areas with little rainfall the irrigation of green
EcoCity will take care of the installation, operation and
maintenance of irrigation systems. According to the needs
possible, grey water will be used for the irrigation in order
In areas with no access to the public water system, water
tanks will be installed to ensure the supply of water for
irrigation.
Equipment
shrubs and trees
44 Waste Water Management
The access to clean water is one of the most serious issues
in many countries in the world.
Contaminated water is the source of numerous diseases, a
lot of them may lead to death.
EcoCity cares for municipalities’ needs in setting up
commercial septic tanks, we take care of the inspection
and maintenance of public sewer systems. We also manage
our customer’s waste water treatment plants in order to
2.11Waste Water
Management
Sewer Inspection and Maintenance
Parts of Public Sewer Systems were built decades ago. As
system.
stage of a public sewer system.
through odor, a loss of sewage water accompanied by a
contamination of the soil in the proximity of the sewer
system. The functionality of the whole sewer system is
By using camera systems with GIS/GPS/transponder
technology the inspection of sewer systems can be tracked
and recorded. This will support the creation of sewer
municipality for documentation purposes.
maintenance and repair of sewer systems and a reduction
technology in order to reduce the need for supply water
Litter, sand, mud and dust are collected in a separate
chamber of the truck system. For major maintenance and
disposal of these residues from the jet truck. This will
Sewer inspection by camera systems
Physical inspection of sewer systems
Repair/replacement of damaged sewer pipes
Cleaning of drainage sinks
46
Management of Waste Water Treatment Plants
and industry.
population.
treatment it has to be ensured that all substances will be
stages
laboratories
Regular detailed reporting to the customer
Waste Water Management
Septic Collection & Disposal
existing sewer system.
sanitized regularly to ensure a smooth operation.
and incidental septic collection as well as tank cleaning
47
Class2 - Gases
Class4 - Flammable and Combustible Solids
Class6 - Toxic Materials and Infectious Substances
2.12Hazardous
Waste
48
Operations Execution
determine its hazards and the process of storage, handling,
transportation and disposal.
EcoCity’s HWM capabilities.
able to present a treatment solution for any HazMat types
except class 7.
All HazMat types will be disposed/incinerated in
professional and attested facilities only. For disposal and
customer.
Hazardous Waste
Handling of Used Grease
drums with secured lid.
reprocessing; optionally used grease can be used as
secondary fuel in power plants.
For the handling of used grease standard Personal
Customer Request
Site Inspection
Upload of C tes Forwarding C tes to Customer
of HazMat Types
torage, Packaging, Transport, Disposal/Recycling Parameters
Construction/ Preparation of Facilities
Mobilization of Equipment and Workforce
Application for needed C
Transport Planning
Temporary Hazmat Storage
Hazmat Treatment & Packaging
HazMat Labeling
Transport Documentation
Loading
HazMat Collection
HazMat Delivery
Transportation Recycling
Disposal
Incineration
Invoicing
Determination of Resources Manpower, Facilities, Equipment, Materials
High Level Process Scenario - HazMat Waste Management
Ass
essm
ent
Mob
iliza
tion
Exec
utio
nRe
port
ing
49
Handling of Used Engine Oil
Engine oil must not be mixed with other oil types.
drums.
power plants to be used as secondary fuel; optionally used
to the workforce.
Handling of Used Coolant/Antifreeze
top steel drums.
distillation and production of new coolant/antifreeze.
For the handling of coolant/antifreeze standard PPE is
Handling of Used Vehicle Batteries Lead/Acid
barred boxes.
The battery casing will be dismantled; plastic will be
production of new materials. Optionally the plastic may be
used as secondary fuel for power plants.
to local melting plants for further processing.
Handling of Used Acid
the acid will be neutralized using ph alkali.
i.e. lime or clay. The mixed product will be incinerated
according to accepted procedures.
For the handling of used acid specialized, acid-resistant
Handling of Used Solid Electrolyte Batteries
top steel drums.
Flammable materials like plastic and insulation will be
cleaned and pollutants will be neutralized.
Battery cells will be shredded and heated until the metal
Extracted metals will be sold to manufacturing industry.
For the handling of solid electrolyte batteries specialized,
Handling of Drilling Muds
HazMat class 6 as they may contain i.e. benzoyl, mercury
and oil residues.
customers as a permanent or mobile solution.
Contaminated drilling mud will be loaded into a batch dryer.
Clean soil and clean water can be reused; the exhaust is not
containing any pollutants.
Chemical residues will be incinerated according to accepted
procedures.
For the handling of drilling mud specialized, acid-resistant
Handling of Used LiSO2 Batteries
LiSO2 batteries will be protected against short circuit by
secured lid. Additionally a special inner PE packing bag will
palleted.
The transportation will be done to attested disposal
facilities.
In case LiSO2 batteries will exceed a space diagonal of
batteries will be incinerated in special HazMat incineration
plants.
customer as a proof of professional disposal.
For the handling of used LiSO2 batteries standard PPE is
Hazardous Waste
chances of health related risks to the community.
to eradicate the current breeding in the communities/
colonies that exist today.
EcoCity’s Integrated Vector Control Plan is a framework
and accomplished within communities. The plan
management.
natural structures, food sources and seasonal change
impacts.
2.13Vector
Control
EcoCity documents any information showing historical
Pest control technicians will lay traps and pesticides.
according to the agreements with the customer.
adjusted based on trend analysis
Collaboration with Health Authorities
the responsible health authorities in a municipality. This
shall help to identify health risks within a community and
form the basis for public information and immunization
programs.
EquipmentEcoCity will manage Vector Control with the help of pest
Traps
Pesticides
Cages
Containers
Pesticide dispersal systems.
Vector Control
buildings, plants and systems to an integrated program
of a plant or building.
solution to its customers in order to enable you to focus on
Facility Information Modeling, Technical (Hard)
Facility Management and Infrastructural (Soft) Facility
Management.
2.14Facility
Management
Facility Lifecycle Management
EcoCity as your partner for Facility Lifecycle Management
scenarios; using best practices from comparable
projects; analyzing renewable resources
subassemblies
stakeholders in order to increase the collaboration
which will allow the digital representation of
physical and functional characteristics of a facility.
ERP system of EcoCity
The customer is able to make his decision for
assets by using the building information modeling
status by web access
Permanent comparison of “to be” and “as is”;
taking all aspects into consideration
Facility Management
Facility Information Modeling
Based on the documentation a site inspection/condition,
audit will be conducted.
gap analysis and all information will be used to create the
systems will be integrated and each asset will be clearly
to form the basis for space and facility management.
Technical Facility ManagementEcoCity’s Technical Facility Management maintains all
Air Conditioning/Ventilation
Plumbing
Fire Alarm and Protection
Building Automation
Access Control, Monitoring and Address Systems
Electrical and Lighting
Building Structure
Canteen Appliances
Regular inspections of the plants and systems to
detect malfunctions at the earliest stage
Scheduled maintenance based on German plant
suppliers’ maintenance instructions
Infrastructural Facility ManagementIn the area of Infrastructural Facility Management EcoCity
Facility Cleaning
Gardening/Landscaping
Car Park Management
The needs of our customers are always in the foreground!
Induction trainings, QHSE trainings, refresher trainings,
basic elements of EcoCity’s training program.
Furthermore a solid training will reduce the number and
work.
Training & Development
2.15Training &
Training Center
customer.
or newly recruited) will participate in an assessment to
Based on the assessment, the employees will be enrolled
for an induction program which will consist of standard
particular designations.
language of the employee.
Sample Training Plan for a ‘Garbage Compactor Driver’
Introduction EcoCity
- Wearing uniform
Rights and obligations of the employee
First Aid
Communication with the ‘customer’
Handling of the garbage compactor
- Speed during collection
- Monitoring the compactor/cleaning system
- Handling of the truck computer system
- Work Safety Aspects
tasks the induction training will take 1-3 days and consists
of theoretical and practical sessions. At the end of the
induction, the employees will participate in a test where
Sample Training Plan for a ‘Waste Collector’The following scenario describes the induction training for
Introduction EcoCity
EcoCity Code of Conduct
- Wearing uniform
Rights and obligations of the employee
First Aid
Communication with the ‘customer’
Handling of waste bins
- Use of the compactor/cleaning system
- Work Safety Aspects
tasks the induction training will take 1-3 days and consists
of theoretical and practical sessions. At the end of the
induction, the employees will participate in a test where
Consultancy / Collaboration with the CustomerAs your accountable partner, EcoCity has no hidden
agenda. Once the cooperation with the customer starts,
population of the city.
of the municipality as well as operation experts of EcoCity.
Consultancy
satisfaction of the customer. Furthermore approaches to
increase the public awareness will be discussed.
public institutions for further analysis and studies.
Consultancy
Consultancy / Collaboration – Waste AnalysisEcoCity will setup an ongoing waste analysis program to
clearly identify and classify the waste of a municipality
campaigns like segregating particular waste fractions
which do not belong to household waste.
statistics management.
i.e. the implementation of multiple bin collection based on
the results of the solid waste analysis.
Consultancy / Collaboration – Waste Logistics Optimization
these resources will greatly depend on a municipality
new residential, commercial and industrial areas, or the
EcoCity’s aim is to continuously analyze routes and
resources used and to optimize their utilization. This
extension of existing transfer stations, collection times etc.
All data collected will be analyzed and used for scenario
congestions.
planning which will again form the basis for the ongoing
Consultancy / Collaboration – Add-on SolutionsMore can be less - One of the philosophies that EcoCity
follows
In case EcoCity’s ongoing analysis show considerable
technologies, we will make the customer aware of the same
by preparing the concept and presenting it to our customer
of the solution.
For example EcoCity will present a solution for a sorting
60
Internal Controls
Standard Operating Procedures and Inspections
Quality Training and Control
QHSE
2.17QHSEThe Principles of Quality
61
2nd Party Compliance
Quality Management System
Internal Audits
3rd Party Accreditations
ISO, OHSAS, CQI, Quality Assurance
The Principle of Quality Planning and Implementation
Audit &Review
ManagementCommitment
Policy and Objectives
OrganisationDocumentation
Resourses
RiskManagementPlanning
Implementation& Monitoring
Incident FreeWorkplace
QHSE-Model
Work Safety Establishing safe work practices in all areas of
operations
safely
www.ecocity.net [email protected]
Germany
Ecolog International Deutschland GmbH
In der Steele 14
Strategy
Macedonia
Ecolog DOOEL
Vidoe Smileski Bato n.n.
PO Box 114
Operations Support
United Arab Emirates
Ecolog International FZE
Product Development