Prepared by:
Michael Asfaw (MSc, BSc, MAPM, MBCS)
![Page 2: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/2.jpg)
IRDS
• is established with experts, and a company in Germany; • is a progressive and multi-disciplinary Engineering and
Consultancy Office with vested interest in development projects in the Region.
![Page 3: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/3.jpg)
Our Services
• Planning – economic and environmental feasibility studies• Design and Supervision – real estates, transport,
terminals, water treatment, bridges, tunnels ...• Consultancy and Capacity Building.
![Page 4: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/4.jpg)
Pre-DesigningDesigning / Supervision
![Page 5: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/5.jpg)
HEnd-to-end Solution
•Feasibility Design•Architectural Design•Surveying•Soil Investigation•Sanitary Design•Electrical Design•Structural Design•Mechanical Design•Contract Administration•Quality Management
Housing and Real Estate
![Page 6: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/6.jpg)
CConstruction Site ManagementDefinition of planning goalsOrganization and staffingCoordination of programs and participantsControls of deliverablesConstruction supervisionTechnical supervisionDocumentation
Construction
![Page 7: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/7.jpg)
TTransport Planning and Optimisation•State Transport Planning. •State and Regional Transport Studies•Light-Speed Rail and Passenger Rail. •Freight Rail Capacity and Planning. •National Rail Policy and Planning. •Rail and Environmental Planning
Transport
![Page 8: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/8.jpg)
RRoad Planning
TurnpikesExpress waysMunicipal roadsCity by-passBicycle paths
Road Infrastructure
![Page 9: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/9.jpg)
RRailroad Stations•Transfer connection bus/ railroad/cars/pedestrians•Volume of traffic•Allocation of station platforms•Traffic junctions•Availability of railroad stations •Freight traffic•Combined freight load from roads to rail tracks•Freight terminals
Railroad
![Page 10: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/10.jpg)
RQuality Management•National laws•European/Regional laws
Special railroad regulations:•Ground constructions•Track construction•Construction design•Drainage•Outfitting•Railroad stations
Railroad
![Page 11: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/11.jpg)
TDesigning
•Terminal Planning •Program Management •Marine Structures •Terminal Security •Terminal Automation •Ferry Terminals •Bulk Terminals •Gate Planning & Design •Terminal Simulation •Traffic Studies
Terminal
![Page 12: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/12.jpg)
WWaterTreatment Plants
Sewage treatment is the basis for water purification and the protection of our water resources.
Reports and studiesEconomic analysisMaster planning of waste water collection and treatment systemsEvaluations and hydraulic systems modellingSewage treatment plants
Ablaufwerte KA Altlay, 1.700 EW, GK 2: Soll-Ist-Vergleichaus Betriebstagebuch 2006
20 mg/l
10 mg/l
2 mg/l6 mg/l 6 mg/l
2 mg/l
60 mg/l
29 mg/l
0
10
20
30
40
50
60
70
CSB BSB5 Nges Pges
Kon
zent
rati
on [
mg/
l]
SOLL-WerteIST-Werte
![Page 13: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/13.jpg)
BBridge
• General Steel Bridges• Cable Bridges • Modular Bridges• Movable Bridges• Special Design – fly
over etc….
![Page 14: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/14.jpg)
TTunnel
• Feasibility study and Technology Section.
• Full and detailed Tunneling Design. • Environmental friendliness and Impact
Assessment.
![Page 15: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/15.jpg)
TTerminals
![Page 16: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/16.jpg)
AArchitecture
![Page 17: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/17.jpg)
Consultancy and Capacity Building
![Page 18: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/18.jpg)
CConsultancy
• Why?– Complexity..
• Lack of Coordianation,• Lack of Communication,• Lack of Progress Control,• Lack of Quality Control,• Insufficent Measurables,• Insufficent Stakeholders Management.
![Page 19: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/19.jpg)
CCapacity Building
• How?– Through set of Processes: provides controlled
start, controlled progress and controlled close to all projects.
– Component: controls, business case, organization, quality, risk, planning…
– Techniques: product-based planning, quality review, change control …
![Page 20: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/20.jpg)
CCapacity Building
• Process– Project startup,– Initiating a project,– Controlling stages,– Managing Product Delivery,– Managing Stage Boundaries,– Closing a Project
![Page 21: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/21.jpg)
CCapacity Building
• Controlling Stages– Work allocation,– Quality reviews,– Risk managment,– Change management,– Stage plan management,– Product delivery on aggreed: time, cost,
quality– Reporting
![Page 22: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/22.jpg)
CCapacity Building
• Potential Benefits– Creates stability,– Simplifies complexity,– Provides effective tool on warning of
problems,– Facilitates smooth boundary/stage
management,– Easily teachable, scalable and repeatable.
![Page 23: EGK 2011: Construction 03 IRDS](https://reader033.vdocument.in/reader033/viewer/2022061109/54519b0faf795911068b5058/html5/thumbnails/23.jpg)
PProject Management • Adoption in 2007
– Over 250,000 practitioners worldwide– Used on all 7 continents– Translated in more than 17 languages – More than 20 User Groups around the world– Most widely used method on all types of
projects (construction, technology, etc.)
PRINCE2 (Project Managment in a Controlled Enviroment)