Agenda
• Cedarvale Station Update
• Forest Hill Station Update
![Page 3: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/3.jpg)
3
Cedarvale Station Updates
June 2017
• Utilities relocation works (Sanitary sewer & water main) are ongoing at Park Hill Rd and Eglinton Ave W
• Crews will soon be on Everden Rd and Winnett Ave to continue the relocation of utilities
• Invert tunnel concrete pour is ongoing at both the east and west side of Allen Rd
• Shoring and construction for the east entrance (at Allen Rd North and Eglinton Ave) is underway
– Waterproofing and Formwork underway
• Ongoing noise and vibration monitoring
• Traffic flip for Eglinton Rd scheduled mid-July
• Shoring on the south side of Eglinton Ave to start as early as July
![Page 4: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/4.jpg)
4
Outdoor Bicycle Parking
Cedarvale Station Aerial Rendering
Accessible Entrance
Outdoor Bicycle Parking
Accessible Entrance
Outdoor Bicycle Parking
Eglinton West TTC Station
![Page 5: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/5.jpg)
5
Construction Progress Picture
![Page 6: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/6.jpg)
Forest Hill Station Construction Update
Complete
Demolition of 842, 874, 875 and 876 Eglinton Ave W
Installation of geotechnical monitoring equipment
Bell utilities relocation
Hydro utilities relocation
Installation of temporary traffic signals
Watermain servicing
Sanitary and storm sewer relocation
Piling the southwest side at the station box
Summer 2017
• Continue piling at the southeast side of the station box
• Continue shallow excavation at the southwest side of the station box
• Continue piling at the Secondary Entrance
• Piling at the Main Entrance
![Page 7: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/7.jpg)
Forest Hill Station Concept Aerial View
Main Entrance
Secondary Entrance
*60% rendering
![Page 8: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/8.jpg)
Forest Hill Station Construction Progress
8
PILING SOUTHEAST WORK ZONE
SOUTHWEST SHALLOW
EXCAVATION
![Page 9: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/9.jpg)
Forest Hill Station Construction Progress
9
PILING AT SECONDARY ENTRANCE
OVERNIGHT SEWER WORK
![Page 10: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover](https://reader030.vdocument.in/reader030/viewer/2022020303/5ae3eef27f8b9a90138e4103/html5/thumbnails/10.jpg)
Forest Hill Station Construction Progress