EML4550 - Engineering Design Methods
Engineering-EconomicsIntroduction, Project Economics
Ulrich and Eppinger: Chapter 11
EML4550 -- 2007
Engineering-Economics
Design under ‘constraints’ Physical (materials, environment, fits, laws of physics) Economic ($ to design, $ to produce, $ to operate)
Dealing with the combination of technical and cost constraints is engineering-economics
EML4550 -- 2007
Engineering-Economics (Cont’d)
Project economics How much should we spend on design? How big will the market be?
Product economics What is the initial cost of the product What are the operational costs of the product What is the product’s life-cycle cost?
Same questions but asked from the manufacturer and customer perspectives
EML4550 -- 2007
Project Economics
How much effort (time and $) should a company spend developing a product?
What tools are used to determine the optimum level of development expenditures?
What type of analysis and reports are needed to convince management to proceed with a development project?
EML4550 -- 2007
Project Economic Profile
EML4550 -- 2007
Project Economics: Quantitative Analysis
Project cash flows span a product lifetime (sometimes many years)
How do we compare an expenditure ‘today’ to an income ‘tomorrow’?
Concept of ‘Net Present Value’ (NPV)
EML4550 -- 2007
NPV Analysis - Observations
What interest rate to use? Discount rate or hurdle rate Must be higher than opportunity lost by company by
investing in this project as opposed to something else Must be higher than prevailing interest rates Low growth industries – 10% Typical for the 90s (bull market) – 20% Aggressive growth (venture capital) - ~50%
Connection to prevailing interest rates as set by Federal Reserve?
EML4550 -- 2007
Project Economics: Methodology
Build a ‘base-case’ financial model Perform sensitivity analysis to understand the
importance of the different assumptions of the model
Use the sensitivity analysis to understand trade-offs Consider impact of ‘qualitative’ factors not covered
on the financial model
Will work through an example
EML4550 -- 2007
Step 1: Build a Financial Model
Need to estimate the magnitude and timing of all project expenditures and product revenues Design and development costs Ramp-up costs Marketing costs
Introduction, direct sales, and service costs Production costs
Direct and indirect costs Sales revenues Consider tax implications, impact on existing sales, etc.
EML4550 -- 2007
Step 1: Financial Model - Costs
EML4550 -- 2007
Step 1: Financial Model - Timing
EML4550 -- 2007
Step 1: Financial Model - Cash Flow
EML4550 -- 2007
Step 1: Financial Model - Project NPV
EML4550 -- 2007
Step 1: Financial Model - Conclusions
The project NPV is positive Management can quantify NPV and weigh it against
risk, or compare with other potential projects to reach a go/no go decision
Management needs answers to ‘what if’ scenarios before committing to a project
Sensitivity Analysis
EML4550 -- 2007
Factors Affecting Profitability of a Development Project
EML4550 -- 2007
Step 2: Sensitivity Analysis - 20% Reduction in Development Cost
EML4550 -- 2007
Step 2: Sensitivity Analysis - Parametric Study on Development Cost
EML4550 -- 2007
Step 2: Sensitivity Analysis - 25% Increase in Development Time
EML4550 -- 2007
Step 2: Sensitivity Analysis - Parametric Study on Development Time
EML4550 -- 2007
Step 3: Use Sensitivity Analysis to See Trade-Offs
EML4550 -- 2007
Step 3: Understanding Trade-Offs
If development costs need to be increased by 10%, what sales volume increase is needed to justify it?
10% increase in development cost decreases project NPV by 5.9% (see table)
What increase in volume would be needed to compensate for that decrease?
EML4550 -- 2007
Step 3: Understanding Trade-Offs
10% increase in sales leads to 21% increase of NPV. (21%/10%)*I=5.9% I=2.8% by assuming linear distribution → Through interpolation, one needs a 2.8% increase in sales volume to compensate for the 5.9% decrease in NPV brought upon by the 10% increase in development costs
EML4550 -- 2007
Step 3: Develop Trade-off rules for the Project
EML4550 -- 2007
Limitations of Quantitative Analysis
Focuses only on measurable quantities, neglects the ‘intangible’, and encourages investment only on those things that we ‘know how to measure’
It depends entirely on the validity of assumptions and estimates that may be wrong
Bureaucracy and over-management may stifle the development project
EML4550 -- 2007
Step 4: Consider the Influence of Qualitative Factors
CompanyProject
Company
Market
Macro Economy
EML4550 -- 2007
Project Interactions with the Company
Externalities Failure of other project Learning from other projects or from this project (‘unpriced’
advantage)
Strategic Fit Technology advantage Corporate image Expansion plan
EML4550 -- 2007
Project Interactions with the Market
Competitors Type and timing
Customers Shifting taste Substitute products
Suppliers Value chain impact Non-compete
EML4550 -- 2007
Project Interactions with the Macro Economy
Major economic shifts Interest rates Stock market Trade Recession Globalization
Government regulations Regulatory impediments Regulatory opportunities
Social Trends Environmental concerns/Global warming