![Page 1: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/1.jpg)
Dr. Ir. Peter Tom Jones (GC EURELCO, KU Leuven)
11-11-2014
EIP RMC Meeting Brussels
EURELCO (EIP RMC 67)
11/11/2014 1 EURELCO (EIP RMC Brussels meeting)
![Page 2: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/2.jpg)
SCO
PE W
P2
- Ex situ
Product manufacture
Use
End-of-Life
New scrap
Metals, alloys and compounds
Natural resources
1. Recycling
2. Substitution
150.000-500.000 Landfills in EU-28
Single-use USW
Mixed USW/IW
Monolandfills containing industrial residues and tailings
SCO
PE W
P1
– In situ
Raw materials
production
ELFM resources
Primary mining
3. Primary mining
Enhanced landfill mining
Rationale EURELCO: “re-mining Europe”
11/11/2014 EURELCO (EIP RMC Brussels meeting) 2
Figure: adapted from original K. Meskers (Umicore) figure
![Page 3: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/3.jpg)
Scope ELFM
• Enhanced Landfill Mining = • “integrated valorisation of landfilled waste streams as metals,
other materials and energy (carriers), using innovative transformation technologies and respecting the most stringent social and ecological criteria.” (http://dx.doi.org/10.1016/j.jclepro.2012.05.021)
• ELFM is both relevant for • ex situ mining (conditioning and excavation of waste +
subsequent processing and upcycling) • in situ mining (where metals and energy are generated from
the landfill body without excavating the waste).
• Various landfill types • Mixed USW/IW landfills • Monolandfills containing industrial residues and tailings
11/11/2014 EURELCO (EIP RMC Brussels meeting) 3
![Page 4: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/4.jpg)
EURELCO targets both USW landfills and landfills containing industrial residues and tailings
11/11/2014 EURELCO (EIP RMC Brussels meeting) 4
![Page 5: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/5.jpg)
The rise of Enhanced Landfill Mining – the good news
• Flanders: Multi-actor research consortium since 2008
• > 10 national ELFM research/ demonstration projects are running
• Flanders, Wallonia, the Netherlands, Germany, Sweden, Finland, Baltic Region, Austria, etc.
• Erection EURELCO in march 2014 - EIP RMC Status since early 2014
• Landfill mining in EIT KIC Factsheet
• Landfill mining integrated in EIT KIC RawMatTERS proposal
11/11/2014 EURELCO (EIP RMC Brussels meeting) 5
Up to 500.000
landfills in Europe
![Page 6: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/6.jpg)
Establishment of EURELCO - March 11, 2014
11/11/2014 EURELCO (EIP RMC Brussels meeting) 6
46 Members, 12 EU Member States, 1000 € Entrance fee
GA, September 2014, Copenhagen: 56 Participants
![Page 7: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/7.jpg)
EURELCO Management Structure
11/11/2014 EURELCO (EIP RMC Brussels meeting) 7
![Page 8: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/8.jpg)
EURELCO Projects
Running projects: • > 10 National R&D projects
in Belgium, Germany, UK, Austria, Sweden, Finland, Estonia, Greece etc.
• Supporting the CTC (Demonstration) Project of Group Machiels (cf. EIP RMC CTC)
• Strong link to new EU H2020 MSCA-ETN REDMUD project (connected to other EIP RMCs such as Mud2Metal, BRAVO)
EURELCO proposals: • Interreg Europe (in
preparation): “share and capitalise on regional good practices in developing and implementing Enhanced Landfill Mining principles and activities
• Urban Metabolism (WASTE-6) (in preparation)
• MSCA-ETN REMINE
11/11/2014 EURELCO (EIP RMC Brussels meeting) 8
![Page 9: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/9.jpg)
EURELCO Dissemination
• www.eurelco.org
• Next General Assembly (Brussels, 2015):
• Invitation to EIP Members to go into debate about the role of ELFM in EU-28
• ELFM III (Lisboa, 2016):
11/11/2014 EURELCO (EIP RMC Brussels meeting) 9
![Page 10: EURELCO_Jones_EIP_RMC-meeting_Brussels_11_11-2014](https://reader033.vdocument.in/reader033/viewer/2022052906/558bd528d8b42aa8158b45ac/html5/thumbnails/10.jpg)
EURELCO pr
11/11/2014 EURELCO (EIP RMC Brussels meeting) 10
EURELCO welcomes new members:
www.eurelco.org