Eva Creek Wind Project Update Tri-Valley Community Center
August 25, 2011 Greg Wyman, Project Manager Golden Valley Electric Association
![Page 2: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/2.jpg)
Nat. Gas
Coal
Hydro
Oil
23% to 31%
28% to 28% 46% to 37%
3% to 4%
GVEA’s Mantra – Kick the Oil Habit!
3%
28%
46%
23%
2009
31%
37%
4%
28%
2010
![Page 3: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/3.jpg)
Residential Bills (700 kWh)
$138
$122
$152
$127$123
$101
$84
$75
Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Sep-08 Jan-09 Jan-10
2004 - 2010
• 2004 - $75
• 2005 - $84
• 2006 - $101
• 2007 - $123
• 2008 - $127
• 2008 - $152
• 2009 - $122
• 2010 - $138
• Oil volatility!
![Page 4: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/4.jpg)
Eva Creek, Ferry, AK
![Page 5: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/5.jpg)
Project Financing 2009-2011
• Clean Renewable Energy Bonds (CREB)
– Initial CREB offering high interest rate
– Now Federal rebate – good interest rate which results in project costs approaching avoided cost
• Received $2 million State of Alaska Renewable Energy Fund Grant
![Page 6: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/6.jpg)
Project Financing 2011
• Received $1.4 million State of Alaska Renewable Energy Fund Grant for Turbine Purchase
• Received $10 million Legislative Appropriation
![Page 7: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/7.jpg)
Collecting wind data since 2003
![Page 8: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/8.jpg)
Flow Analysis Results
![Page 9: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/9.jpg)
Location adjacent to the Intertie
![Page 10: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/10.jpg)
Wind Variability
![Page 11: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/11.jpg)
Project Status Overview
• Completed Wind Resource Assessment – Data collection from 2003 to present
– Energy yield assessment for REpower turbines
• Completed Studies – Avian impacts
– Wetland impacts
– Archeological and Cultural impacts
– Aviation impacts
![Page 12: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/12.jpg)
Project Status Overview
• Coordination with ARRC for siding upgrades
• Conceptual design for Access Roads and Turbine Pads
– Design for Ferry Road Upgrades and Site Access
– Development Plan for DNR and USCE Permits
• State of Alaska DOT Ferry Road permit
• US Army Corps of Engineers wetlands permit
• State of Alaska DNR lease and access
• FAA aeronautical determination
![Page 13: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/13.jpg)
REpower MM92 CCV Turbine
![Page 14: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/14.jpg)
Wind Energy Convertor (WEC)
• Installing 12 REpower CCV MM92 Turbines
2.05MW rated output @ 12.5 m/s (28 mph)
80 m (262 ft) Hub Height
92.5 m (303 ft) Rotor Diameter
45.2 m (148 ft) Blade Length
3.0 m/s Cut-in Speed (6.7 mph)
24.0 m/s Cut-out Speed (53.7 mph)
![Page 15: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/15.jpg)
![Page 16: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/16.jpg)
![Page 17: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/17.jpg)
REpower MM92 Tower Base
![Page 18: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/18.jpg)
REpower MM92 Blade
![Page 19: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/19.jpg)
Balance of Plant Construction
• Selected Michels Wind Energy for BOP – Brice, Inc. (Civil Construction)
– PDC Engineers (Civil Design)
– Golder Associates (Geo-Technical Design)
– Stantec Engineering (Electrical Design)
![Page 20: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/20.jpg)
Proposed Project Schedule
• Order REpower Turbines (Oct 2011)
• Civil, Structural & Electrical Design (Aug 2011 – Feb 2012)
• Mobilization & Deliveries (April – July 2012)
• Civil Construction (August 2011 – July 2012)
• Building Construction (May – Sept 2012)
• Substation & Feeder Construction (May – Sept 2012)
• Turbine Foundations (June – July 2012)
• Turbine Erection (Aug – Sept 2012)
![Page 21: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/21.jpg)
2011 Balance of Plant Activities
• Civil design of Ferry Rail Siding and Ferry Road
• Mancamp preparations
• Construct Ferry Railhead Staging Area
• Begin Construction of Ferry Road within DOT right-of-way
![Page 22: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/22.jpg)
REpower MM92 Blade
![Page 23: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/23.jpg)
![Page 24: Eva Creek Wind Project Update - GVEA](https://reader036.vdocument.in/reader036/viewer/2022081401/62909b74e15b087c0f6413a4/html5/thumbnails/24.jpg)
Questions