151-04562
EXHIBITION PLACE PARKING
STUDY – EXECUTIVE SUMMARY
JANUARY 2016
WSP Canada Inc.600 Cochrane Drive, 5th FloorMarkham, ON L3R 5K3
Phone: 905-475-7270Fax: 905-475-5994www.wspgroup.com
151-045620-00
January 25, 2016
Ms. A. CampbellGeneral ManagerSales & Event Management100 Princes’ BoulevardSuite 1Toronto, ON M6K 3C3
Subject: Exhibition Place Parking Study – Executive Summary
Dear Ms. Campbell,
Attached is the Revised Executive Summary for the Exhibition Place Parking Study.Should you have any questions, please feel free to contact me.
Yours truly,
WSP Canada Inc.
Sharon Sterling, MCIP, RPPDirector, Transportation Planning
/hs
151-04562let20160125_ExSumm.docx
WSP NJanua
1.1
1.1.1
1.1.2
No 151-04562-0ary 2016
E XThe foaddresumm
STU
STU
The o
Tpa
Tcugr
2 APP
STUD
The WHoweshopp23rd o100 pPlaceand isthe pa
METH
Best
A numcentreapplic
Cons
An imand thliving servic
WSP transp
0
X E C Uollowing provessing parkingmary addresse
DY OBJEC
DY OBJEC
objectives of t
o produce a carking facility
o produce a purrent parkingrounds and a
ROACH AN
DY APPROAC
WSP team recever, other moping malls do or Boxing Day
percent of maxe. Transit and ssues. It is witarking study a
HODOLOGY
Practice Rev
mber of majores, both natiocability to Exh
sultation
mportant comphe perspectivat, or near Ex
ces.
reached out tportation (par
U T I Vides a summag and parkinges the study’s
CTIVES AN
CTIVES
he Parking st
comprehensiv; and
parking strateg stresses anssesses unid
ND METHO
CH
cognizes this odes of transpnot design thy each year, iximum peak pactive transpth this approaand it is with t
view
r mixed use (eonally and intehibition Place.
ponent of the es of the locaxhibition Plac
to each stakerking, traffic, t
E S Uary of the stud-related issue
s two objective
ND METHO
tudy are:
ve parking stu
egy which recd, using a 10
dentified parki
ODOLOGY
is a parking sportation are heir already mit is not practiparking dema
portation mustach that the Wthis perspectiv
entertainmenternationally, w
work for deveal stakeholderce, or serving
eholder througransit) needs
U M M Ady process, mes on the groues as describ
DOLGY
udy, to include
ommends ho-year horizonng demand.
study and notcritical to the
massive parkincal, cost effec
and for every t play importa
WSP team devve that a park
t, recreationawere reviewed
eloping an effrs – these areExhibition Pla
gh surveys to and issues. W
A R Ymethodology aunds of Exhib
be in the RFP
e and conside
ow best to plan, looks proac
t a transportasuccess of a
ng lots to meective or envirosingle event w
ant roles in adveloped a coking strategy
al and retail) cd to identify b
fective parkine the organizaace with plan
o obtain backgWSP followed
Ex
and recommebition Place. I.
er the locatio
n for the futurctively at the i
tion master pn effective paet parking demonmentally sowith on-site p
ddressing the mprehensive was develope
complexes, stbest practices
g strategy waations and penning, traffic a
ground informd up the surv
xhibition Place PaExh
ended strategn particular, t
n and costing
re and alleviancreased use
plan or a transarking strategmands on Deound to accomparking at Exh
site parking dmethodology
ed for the site
adiums and cand their pos
as to obtain beople working and transporta
mation on opeeys with focu
ES-1
arking Study ibition Place
gy for this
g of a new
ate the e of the
sit study. y. Just as
ecember mmodate hibition demand y to conduct e.
convention ssible
oth data and/or
ation
rations, s group
WSP NJanua
1.2
No 151-04562-0ary 2016
sessioa Solu(tenanExhib
PARK
The Wwith aExhib
The d7:00asite, tToron
PARK
The Wparkinlocatio
FINAN
The p
pr
ca
op
ca
N
CUR
ExhibExhibsignifiCentrand cWorldand S
PARK
ExhibExhibthat elots, a
0
ons, individuautions Workshnts, operators
bition Place). T
KING ALLOCA
WSP team deadditional devbition Place an
demand for paam to midnighhe duration o
nto Area and b
KING SUPPLY
WSP team invng supply andons were exa
NCIAL ASSE
parking structu
roposed supp
apital cost
perating cost
ash flow marg
Net Present Va
RRENT AND
bition Place is bition Place, aicant heritagere and Allstreaconsumer shod and Royal AScotiabank To
KING SUPPLY
bition Place is bition Place is events and share used to ex
al in-person mhop held on Os, exhibitors, tThe results of
ATION MODE
veloped an avelopments innd its environ
arking is compt. For each re
of stay, and pubeyond, are a
Y OPTIONS
vestigated oppd the addition amined for a n
SSMEMT FO
ure options w
ply
gin
alue (NPV)
D HISTORI
a 192-acre san agency of te buildings, opam Centre. E
ows and meetAgricultural Woronto Caribbe
Y
a very uniqucomprised ofows are perfoxhibit product
meetings, andOctober 15, 2transit authorf the worksho
EL
llocation mod place. The as.
prised as a lisecord, the timurpose. The oalso included.
portunities to of a parking
new parking s
OR A PARKIN
were assessed
IC PARKIN
site owned by the City. Exhipen parks andach year, ovetings such as inter Fair, andean Carnival.
e site when cf a number oformed in but, ts, merchandi
/or conferenc015 with repr
rities, political op assisted in
del to determiallocation mod
st of every cae of arrival on
origin of trips, .
increase on-sstructure. All
structure, inclu
NG STRUCTU
d on:
NG SUPPLY
the City of Tobition Place bd gardens, reer 5.3 million vthe National d participate i.
comparing parf buildings, hodepending ose, livestock,
ce calls. The cresentation frorepresentativthe formation
ne the future del consists o
ar that travels n-site is defin based on nin
site parking sexisting parkuding both ab
URE
Y AND DEM
oronto and mboasts severaestaurants, BMvisitors comeBoat Show, Oin events suc
rking demandowever, it is nn the event, t operate amu
ExhibExhib
consultation pom all groupsves, communn of the parkin
parking demof an electroni
onto the site ned, the occupne zones cove
supply througking lots were bove ground a
MAND
managed by thal historically MO Field, Rice to ExhibitionOne-of-a-Kindch as the annu
d and supply. not simply a cthe entire grousement rides
bition Place Parkbition Place
process culms of stakeholdnity associationg strategy.
and at Exhibiic description
over a full dapants’ destinaering the Gre
h optimizationreviewed and
and below gro
he Board of Gand architect
coh Coliseum,n Place to atted Craft Showsual CNE, Hon
As noted earcollection of buunds, includins, and a race
ES-2
king Study
inated into ders ons and
tion Place of
ay from ation on-eater
n of existing d four ound.
Governors of urally , Enercare end trade s, Print nda Indy,
rlier, uildings ng parking track. The
WSP NJanua
No 151-04562-0ary 2016
resultand sThe p3,600
It is imToronas thethey crepresaccurCNE such
Exhib
MONFebruMay OctobNovemAugusJune July Notes:
This texper
CURR
As sh2015,Place
Exhibgrasspercesituatstaff t
Withoparkinsnow shoulparkinofferin
0
t is an unstabupply values
parking supply0 spaces, far l
mportant to nonto 2015 Pan e Main Mediacompeted. Thsentation of tyrate profile of and Honda Inas grass area
bit ES-1 – Va
NTH uary - 2015
ber mber st
1 – Per RFP 2 – 2012 data
type of variatiorience of visito
RENT PARKI
hown in Exhib at 3:00pm du
e grounds. Th
bit ES-2 illustr area in front
ent of the avaiion occurred.to address pa
out the use of ng lots are noon the ground be mindful ong lots are nong extra incen
le and fluctuaobserved dur
y fluctuated bess than the
ote that in theAm Games. Centre and t
herefore, the lypical summethe fluctuatio
ndy, on-site pas (see ES-2)
ariation in Pa
PARKSUPP
5,935,125,334,743,862,961,75
documents a indicates parkin
on in the avaors.
NG DEMAND
it ES-3, the lauring the Royis represente
ates an impoof Liberty Gralable parking This was esp
arking demand
these areas, ot available. T
d could limit tof booking ev
ot available. Tntives (transit
ating supply oring major evetween approalmost 6,000
e summer of 2Exhibition Plathe Cisco Inteow on-site paer months’ pan in on-site parking supply). Without the
arking Supp
ING PLY
PASR
30 28 36 48 61 67 55
ng supply was 6
ilable supply
D
argest demanyal Winter Faid approximat
rtant issue anand and area was on the gpecially true dd when the su
the site couldhe WSP teamthe use of thevents with larghis can also bt subsidy – bu
of parking per ents from Maoximately 1,5 spaces the s
2015, Exhibitioace was transernational Broarking supply arking supply. arking supply
y can reduce tse areas, the
ply
ARKING SUPPLY RATIO 100% 86% 90% 80% 65% 50% 29%
,275
does provide
nd for on-site r when 4,353tely 90 percen
nd that is the a adjacent Pagrass area (Eduring the Paurface lots are
d not accommm was unablee overflow parge parking debe addressedundle event tic
event. This isay 2015 to No00 and 5,300
site reported a
on Place wassformed to hooadcast Centr
during the mHowever, the
y, depending to 50 percent
e parking supp
Base F
During coexpan
Pre P
e a challenge
parking dema3 parked vehicnt of the site’s
importance orking Lot 5A)S-2) and durin Am games.e full or not av
modate peak e to observe thrking areas. T
emand duringd by making acket and trans
ExhibExhib
s illustrated inovember 20150 spaces; aveas their suppl
s a very impoost five sportinre for athletesonths of Junee remaining mon the event.t. This includeply would be
COMMENTFormal Parkin
onstruction ofsion and roof
CNE Pan AM + Hon
Pan AM
for parking st
and was Satucles were obss available su
of the informal. During the Cing the Royal . It is an effecvailable.
parking demahe site duringTherefore, Ex the winter m
arrangementssit pass) to re
bition Place Parkbition Place
n recent parki5, see Exhibit raging approxly.
rtant venue fong competitios from the Ame to July is nomonths provid. As shown, des informal pasignificantly le
TS ng Supply
f BMO Field f addition
nda Indy
taff and can im
urday, Novemserved on Exhupply of 4,750
l parking areaCNE, more thWinter Fair,
ctive tool used
and when theg winter condixhibition Placeonths if the s
s for off-site paeduce parking
ES-3
king Study
ing demand – ES-1. ximately
or the ns, as well
mericas as ot a fair de an during the arking areas ess.
mpact the
mber 14, hibition 0 spaces.
as (the an 50 a similar d by parking
e surface itions when e staff urface arking and g demand.
WS
P N
o 15
Janu
ary
20
51-0
456
2-00
01
6
Exh
ibit
ES
-22 –
Info
rmal
Parr
king
Are
as
Par
king
on
durin
g th
e Cgr
ass
area
acr
oss
froC
NE
, Aug
ust 2
015.
Par
king
on
the
gN
ovem
ber 2
015
om L
iber
ty G
rand
gras
s ar
ea o
f Lot
5A
, d
Exh
ibiti
on P
lace
Par
kE
xhib
durin
g th
e R
oyal
,
ES
-4
king
Stu
dy
ition
Pla
ce
WS
P N
o 15
Janu
ary
20
51-0
456
2-00
01
6
Exh
ibit
ES
-3
3 –
Pea
k P
arki
ng D
eman
d an
d S
uppl
y
Exh
ibiti
Exh
ibiti
on P
lace
Par
king
Stu
on P
lace
udy
E
S-5
WSP NJanua
No 151-04562-0ary 2016
HISTO
The Wpattervehiclillustra
si
da
al
on
0
ORIC PARKIN
WSP team revrn and generales on the siteates the follow
ignificant daily
aily average p
lmost 70 perc
n only 21 (6 p
NG DEMAND
viewed the Daal volumes fore. Exhibit ES-wing:
y fluctuation i
parking dema
cent of days h
percent) of the
D
aily Parking Rr 2012 to 201-4 provides th
n parking dem
and of 1,350 v
had parking d
e 366 days di
Report from 204 are similar
he daily parkin
mand
vehicles
emand of les
id the parking
012 to 2014, but 2012 had
ng demand at
s than 1,500
g demand exc
Ex
as provided bd the highest vt Exhibition P
vehicles
ceed 5,000 ve
ExhibiDays wParkin– 2012
xhibition Place PaExh
by Exhibition volume of palace during 2
ehicles
t ES-4 – Frewith Significang Volumes o2
ES-6
arking Study ibition Place
Place. The rked
2012. It
equency of ant on the Site
WSP NJanua
No 151-04562-0ary 2016
PEAK
Exhibas therepres8,000indicaMarch
Exhib
Exhibappro
0
K DAY
bit ES-5 provide blue area. Tsents the effe
0 spots (total cates the site ph 17, 2012 du
bit ES-5 – Pe
bit ES-5 also ioximately 10:0
des the peak The red level iective capacitycrush capacitypeaked at appuring the Hom
eak Day Par
llustrates that00am to 7:00p
day profiles. is 1,300 spotsy at 5,500 spoy of area, inc
proximately 5,me Show and
rking Deman
t on this day, pm making pa
It shows the ms (availability ots (total capaluding Ontario,000 vehicles a Marlies gam
nd Profile – M
the capacity arking spaces
modelled repin Enercare Cacity of Exhibo Place, Libe between 1:0mes.
March 2012
at the Enercas in this area
Exhibition PExhibition P
resentation oCentre underbition Place) arty Village an0pm and 3:00
are Centre wavery difficult t
Place Parking StPlace
of demand overground); oranas reported innd TPA Lots).0pm, on Satu
as fully utilizeto find.
ES-7
tudy
er the day nge n 2012 and
The Exhibit urday,
d from
Peak
WSP NJanua
No 151-04562-0ary 2016
MAXI
The hShowand Mexace
This o
Exhib
0
MUM SITE P
historic data sw/Canada BlooMedieval Timeerbated by the
occurred once
bit ES-6 – M
PEAK
hows that theoms event coes, as well ase soccer gam
e and the site
ax Day Park
e site reachedoincided with a the Theatre a
me being at the
e parking supp
king Demand
d maximum pea 1:00pm TFCand Muzik. Te same time a
ply should not
d Profile – M
eak on SaturdC game and che levels of das the peak a
t be designed
March 2012
Exhibition PExhibition P
day, March 2considerable demand were attendance at
d based on th
Place Parking StPlace
4, 2012 whenactivity at Libsignificant anthe Home Sh
his single occu
ES-8
tudy
n the Home berty Village nd unusual, how.
urrence.
WSP NJanua
1.3
No 151-04562-0ary 2016
CON
UsingWorksrefersPlace
The c
er
pa
tr
in
ut
ch
The p
ad
d
ad
L
re
pran
ch
ad
ad
h
in
w
pr
0
NSULTATIO
g emailed survshop, the WSs to organizatie with planning
consultation p
rosion of park
arking and tra
affic manage
nconsistent pa
tilization of pu
hallenges in c
participants pr
dd more park
iscount the pa
dd well mana
iberty Village
evisit the loss
roduce a proand shuttle ser
harge fees as
dd more bike
dd a stop sign
ire traffic and
nform and trai
work with the C
rovide consis
ON WITH S
veys, focus gSP team obtaiions and peopg, traffic and t
rocess result
king spaces, o
affic managem
ment during e
arking space
ublic transit an
communicatio
rovided the fo
king inventory
arking for fart
aged shuttles
BIA could off
of Marilyn Be
active masterrvices are con
s they relate t
lanes/trails, e
n on Manitoba
parking man
n paid duty st
City to improv
tent designat
STAKEHOL
roup sessionsned both dataple working atransportation
ed in commo
on-site and of
ment, on-site
events, off-sit
condition, allo
nd alternate m
ons and suppo
ollowing soluti
y on-site or off
ther lots and e
for further lot
fer Exhibition
ell Park for pa
r parking/traffinsistent from
o peak event
especially nea
a Road
agement staf
taff to a highe
ve traffic light
ted parking fo
LDERS
s, individual ina and the per
and/or living an services on
n themes aro
ff-site
te
ocation, secu
modes of tran
ort
ons:
f-site
educate custo
s
Place custom
arking space w
ic plan, with teyear to year
hours
ar Princes’ G
ff; inform and
er level
management
or tenants, wit
n-person meerspectives of
at, or near Exh parking and
ound the follow
rity
nsport
omers about t
mers parking
with the City
emplates for
ates
train them w
t, especially o
th fenced park
Exhibition PExhibition P
etings, and/orlocal stakehohibition Placeparking-relate
wing areas:
them
for a fee, onc
the individua
ell
on streets like
king for police
Place Parking StPlace
r conference olders. Stakeh, or serving Eed issues.
ce new lots ar
l events, so th
e Jameson Av
e and fire
ES-9
tudy
calls and a holder Exhibition
re built
hat parking
venue
WSP NJanua
1.4
No 151-04562-0ary 2016
w
br
bu
w
m
FUTU
ExhibThese
cr
ex
co
co
ExhibPlaceon the
0
work as a cons
rand the show
undle events
work with TTC
motivate emplo
URE DEVE
bition Place Ste developmen
reation of Fes
xpansion of th
ompletion of t
ompletion of H
bit ES-7 descre. These devee site.
sortium with o
ws with travel
tickets with tr
and GO to e
oyees to take
ELOPMENT
trategic Plan nts include:
stival Plaza
he Enercare C
the Raptors P
Hotel X
ribes the key felopments we
others to prom
and parking
ransit tickets/
ncourage new
e transit or ride
T AT EXHIB
2014-2016, id
Centre
Practice Facili
features of thre incorporate
mote transit an
options
passes
w Family Pas
e-share durin
BITION PL
dentifies seve
ity
e pending aned into the pa
nd ride sharin
sses
ng busy event
ACE
eral planned d
nd future planarking model
Exhibition PExhibition P
ng
ts
developments
ned developmto forecast th
Place Parking StPlace
s within the gr
ments at Exhihe future park
ES-10
tudy
rounds.
ibition ing demand
WSP NJanua
1.5
No 151-04562-0ary 2016
Exhib
FUTU
Basedparkin
BH
BH
As shrepres
0
bit ES-7 – M
URE PARK
d on the curreng supplies:
ase Supply wHotel X and 5,
ase Supply wHotel X
hown in Exhibsenting 90 pe
ax Day Park
KING DEMA
ent parking su
with Lots 1 an839 spaces w
with Festival P
it ES-8, the foercent of the s
king Demand
AND
upply and adj
d 2 availablewith Hotel X
Plaza in opera
orecasted sitesites activities
d Profile – M
ustment for th
during non-F
ation: 3,985 s
e parking dems, can be acco
March 2012
he future deve
Festival Plaza
paces withou
mand for seveommodated o
Exhibition PExhibition P
elopment, the
a event days:
ut Hotel X and
en of the nine on the site.
Place Parking StPlace
ere will be two
5,408 spaces
d 5,460 space
Day Types m
ES-11
tudy
o base
s without
es with
modelled,
ES-12
WSP No 151-04562-00 Exhibition Place Parking StudyJanuary 2016 Exhibition Place
Exhibit ES-8 – Future Parking Demand by Day Type-Base Supply
Future DayType
BaseFrequency
Total DailyDemand
EPDemand
3rd
PartyParking
DeficienciesComments
1 Max Fut 1 14,676 8,498 2,446 (3,730) Exceeds EP andlocal area supply
2 Peak Fut 6 10,093 8,134 1,959 Exceeds EPsupply butdemand
accommodatedin area supply
3 Major Event 16 4,993 4,800 193 Sufficient supplyon EP
4 TFC Fut 17 6,417 4,588 1,829 Exceeds EPsupply butdemand
accommodatedin area supply
5 Events 59 2,578 2,496 82 Sufficient supplyon EP
6 Events + OP 12 5,787 4,937 850 Sufficient supplyon EP
7 Minor 215 400 400 0 Sufficient supplyon EP
8 Minor + OP 6 3,737 3,031 706 Sufficient supplyon EP
9 Minor + FPFut
12 6,897 3,126 2,018 (1,750) Exceeds EP andlocal area supply
There will be 36 days (10 percent) when the Exhibition Place site supply cannot meet the required parkingdemand; however, the area supply will be able to meet all except 13 days or 2 Day Types – Max Fut andMinor + FP Fut.
THE MAXIMUM FUTURE DAY (MAX FUT)
The Max Future Day is unable to accommodate all the day’s demand within the area capacity. Over thedaytime, the model has assigned 14,675 cars. Given the times of arrival and durations of stay in theMax Fut demand list, the parking included within Exhibition Place, Liberty Village and Ontario Place isinsufficient at some periods of the day.
An important element to note is that this day type represents only one day per year. However, as alesson learned from a similar event in 2012, the Exhibition Place staff and its tenants, exhibitors andOntario Place have worked diligently to avoid such scheduling of major events, primarily a largesporting event occurring concurrently with a major show.
Therefore, the site parking supply should not be designed to accommodate this type of possible oneday, once per year event. Similar to how shopping malls do not provide parking supply to accommodatethe maximum December peak days.
WSP NJanua
No 151-04562-0ary 2016
MINO
Ocodeco
EFpran
PERC
In theas a h
The vblue acars, until aclose compdestin
Exhibmeasprovidpricinfor sothem
0
OR EVENT PL
On days that Fombination ofemand at keyonsiderably a
xhibition Placestival Plaza romotion andnd grass area
CEPTION OF
e future, the Ehorizontal dot
volume of visitarea. What thby mid-morni
approximatelyproximity to tlaint that ther
nation (Enerca
bition Place stures to offsetding additionag; by increasi
ome guests. Amore attractiv
LUS FESTIVA
Festival Plazaf long durationy times. The Fand bringing th
ce staff will hasite is in use possible off-
as).
A SHORTAG
Enercare Centtted black line
ting cars to the diagram illung all the cap
y 4:30pm. Thithe Enercare re is insufficieare Centre).
taff will have tt these expecal incentives fing the parkin
Alternatively, rve to those w
AL PLAZA (M
a is operationans of stay witFestival itself he total capac
ave to adopt m. As discussesite parking, c
GE OF PARK
tre Lots 1 ande.
he Enercare Custrates is thapacity in the Es is a critical Centre. Thus
ent capacity a
to work on matations. As idfor guests to dng fee for the reduce the pa
who do not min
MINOR + FP F
al, there is alsh the likelihoooccupies Lotscity down by m
measures to aed earlier, succoupled with
KING ON-SITE
d 2 will provid
Centre on busat while the sitEnercare Cenconcern for u
s, while the sitpplies for thos
anaging expeentified earliedo so. Other pEnercare Ce
arking fees onnd walking a
FUT)
so a potentialod of start ans 1 and 2, redmore than 1,4
address parkich measures sthe use of inf
E
e capacity fo
sy weekend dte capacity is
ntre Lots 1 andusers of the site and envirose that expec
ectations in ther, these coulparking manantre Lot 1 and
n the outer pabit further and
Exhibition PExhibition P
insufficiencyd end times bducing the sit400 spaces.
ing demands should includformal parking
r 3,373 cars a
days (Peak Das adequate ford 2 is taken aite that expec
ons have avaict to be able t
is regard, andd include pro
agement mead Lot 2, to ma
arking lots (Lod saving on p
Place Parking StPlace
y of parking. Tbeing close crte’s capacity
on days whee heavy transg areas on th
as shown in E
ay Type) is shr the peak voand remains act available palable capacityto park close
d provide otheomoting transiasures could iake them lessot 5 and Lot 6parking fees.
ES-13
tudy
The reates high
en the sit e site (bike
Exhibit ES-9
hown by the lume of at capacity arking in y, the to their
er t use and nclude s attractive ) to make
WSP NJanua
1.6
No 151-04562-0ary 2016
Exhib
FUTU
To beinclud
ex
op
ad
EXAM
TherepublicsuppoTPA othoseworkin
0
bit ES-9 – Si
URE PARK
etter address tde:
xamining off-s
ptimizing the
dding a new p
MINING OFF-
e are approximc use that couort the anticipor possible pr of exhibitorsng relationshi
Area Cap
Future S
ite Capacity
KING SUPP
the site future
site parking o
existing on-s
parking struct
-SITE PARKIN
mately 2,500 uld be consideated demand
rivate operato, and provideip with Ontari
pacity
ite Peak
versus Ene
PLY OPTIO
e parking dem
opportunities
ite parking su
ture on the sit
NG OPPORT
parking spacered for off-sitd. Exhibition Pors in Liberty V a conveniento Place in thi
11am-
rcare Capac
ONS
mand, a series
upply
te
TUNITIES
es along Lakete parking in s
Place can inveVillage or elset shuttle to ses regard and
4:30pm
city and Dem
s of parking s
e Shore Boulsituations whestigate partnewhere, particervice and tra
this should c
C
Exhibition PExhibition P
mand
supply options
evard and withen the site panering with offcularly to stornsport them.
continue.
Capacity of E
Place Parking StPlace
s were exami
thin Liberty Varking supply f-site supplierre vehicles suThere is an e
Enercare, Lo
ES-14
tudy
ned. They
Village for cannot rs such as uch as existing
ot 1 & 2
WSP NJanua
No 151-04562-0ary 2016
OPTIM
The Wachievredes
ADDI
The Wstructspacelocatio
L
L
L
L
0
MIZING THE
WSP team revved through o
sign to improv
NG A NEW P
WSP team exature in the formes. The prelimons:
ot a (Gore): A
ot 1 and 2: B
ot 3 – Enerca
ot 4: Above g
EXISTING O
viewed all theoptimization ove safety, sup
PARKING STR
amined oppom of an abov
minary analysi
A multi-level a
Below grade 1
are Expansio
ground multi-l
ON-SITE PAR
e parking lots of existing parply, operation
RUCTURE O
rtunities to ince ground or bis indicated th
above grade
level garage
on: Below gra
evel structure
RKING SUPPL
and determinrking lots. Thens and reduce
ON SITE
crease the avbelow ground hat a parking
structure or b
e and/or partia
ade addition t
e
LY
ned that a totae optimizatione delay at ent
vailable parkingarage, rangstructure cou
below grade 1
al multi-level a
to existing ga
Exhibition PExhibition P
al of 450 parkn also incorpotry and exit po
ng supply by ging from 150uld be located
1 level structu
above grade
rage
Place Parking StPlace
king spaces corated extensoints.
adding a new spaces to 1,
d in the follow
ure
structure in L
ES-15
tudy
an be sive
w parking 000 ing
Lot 2
WSP NJanua
1.7
No 151-04562-0ary 2016
FINA
The fiparkinparkin
Avare
Avs10paap
Exhib
0
ANCIAL AS
nancial viabilng supply by ang demand. T
A new undergralue cost of $esults in a neg
A prefabricateds. $63,000 pe0), but still haarking spacespproximately
bit ES-10 – F
SSESSMEN
ity of a new pan additional
The results ind
round parking$72.5 million agative (loss) p
d galvanized er space for uas a negative s were provid$5.2 million,
Financial Re
NT OF A PA
parking struct150 to 1,000 dicate:
g garage of 1,and not generpresent value
steel beam gnderground spresent value
ded in a new Lbut significan
eview of Thre
ARKING ST
ure was assespaces; the c
000 spaces, rate sufficient
e of almost $5
arage has a sstructure) for e of approximLot 4 structurently less than
ee Possible
TRUCTUR
essed using thcurrent parkin
located in Lot revenue to m57 million, see
significantly loLot 4 with 150
mately $400,00e resulting in a traditional c
Parking Stru
Exhibition PExhibition P
RE
he options of ng fees; and t
ots A, 1 or 2, wmake the invee Exhibit ES-1
ower capital c0 parking spa00. The lattera negative pr
concrete struc
uctures – Ba
Place Parking StPlace
increasing ththe forecasted
would have a estment viable10.
cost ($20,000aces (column r is compoundresent value octure in Lots A
ase Conditio
ES-16
tudy
e on-site d future
present e as it
0 per space 4 of ES-
ded if 1,000 of A, 1 or 2.
on
WSP NJanua
No 151-04562-0ary 2016
The Wstructbe chpremisocce
Bne$6prda
Basedand isexhibdiscou
Therefee apPlace
HowePlace
ExhibIncre
0
WSP team testure on the sitarged 40 dayium parking feer games. The
oth prefabricaet present va66,000 for a 1refabricated gays at a $30 f
d on the curres concerned ititors of charguraging atten
efore, based opplied to only e.
ever, this shoue and also wh
bit ES-11 – Fased Parkin
sted a numbete would be fiys in the year ee would appe results indic
ated garages lue for a 150-1,000-space pgarage wouldflat fee.
ent operating t will be challeing their custodance to thei
on the project30 days per
uld be reviewen Ontario Pl
Financial Reng Fee
er of scenariosnancially viaband with the
ply to the majocated:
slightly exce-space prefabprefabricated achieve a po
model, the Wenging for Exomers a $30 r events.
ted annual payear), a new
ed in the futuace developm
eview of Thre
s to determineble. However,new parking
or shows, Fes
ed or are belobricated garag
garage strucositive net pre
WSP team belxhibition Placeparking fee. T
arking demandparking struc
re should addment plans ar
ee Possible
e the conditio, the $30 specstructures ful
stival Plaza ev
ow the breakege of -$47,00cture, see Exhesent value of
ieves it will bee to gain acceThis could be
d and currentcture would no
ditional develore known.
Parking Stru
Exhibition PExhibition P
ons under whicial event parlly occupied, wvents, Argo fo
even point. F0 and a posithibit ES-11. Tf $19,000 if th
e difficult to aeptance by the viewed as ex
t parking fee pot be financia
opments be p
uctures – Inc
Place Parking StPlace
ich a new parrking fee wouwhich meansootball and To
or example, ative net preseThe 150-spacehe garage wa
achieve such e major tenanxcessive and
protocol ($30ally viable at E
proposed at E
creased Dem
ES-17
tudy
rking ld have to
s that this oronto TFC
a negative nt value of e
as full for 41
objectives nts and
0 parking Exhibition
Exhibition
mand and
WSP NJanua
1.7.1
No 151-04562-0ary 2016
REV
WSP Lettertowardated
Mwto
Tpa
Tanhabe
As a rdiffereabove
Basedhowevprefab
0
VISED FINA
reassessed tr of Intent withrd the provisio August 25, 2
MLSE to contrwith up to $200owards the ca
he City to proarking facility
he net revenund any other ave been fullye accrued to t
result of the Lent calculatione.
d on a contribver, with capib facility, as s
ANCIAL ASS
the financial vh Maple Leaf on of parking 2014, the follo
ibute $2 millio0,000 being a
apital cost of t
ovide a match.
ue from the nfunders in proy recovered. Othe Board of
Letter of Intenn which is bas
bution amounttal cost of $3
shown in Exhi
SESSMEN
viability of theSports and Eand green sp
owing was ou
on towards thapplied towardthe new parki
hing contributi
ew permanenoportion to thOnce these cGovernors of
t, the contribused on a Pay
t of $4,000,00,000,000, a Pbit ES-12.
T
150-space pEntertainmentpace on the Etlined:
he cost of a neds the cost ofng facility ide
ion of $2 milli
nt parking faceir respective
contributions hf Exhibition Pl
ution of the fuyback Period
00, it is clear tPayback Perio
prefab parkingt Ltd. (MLSE)
Exhibition Plac
ew permanenf a parking ne
entified in the
on towards th
cility will be she capital contrhave been relace.
unds for the ed rather than t
that a 1,000-sod assessme
Exhibition PExhibition P
g structure in , where MLSEce grounds. In
nt parking on eeds study anstudy.
he capital cos
hared among ributions untilcovered, all o
entire capital cthe Net Prese
space garagent was condu
Place Parking StPlace
Lot 4, based E would contrn a City Staff
the Exhibitionnd the balance
st of the new p
MLSE, the C these contrib
of the net reve
cost does reqent Value add
e is not financucted for the 1
ES-18
tudy
on the ribute Report
n Grounds, e applied
permanent
City/Board, butions enues will
uire a dressed
cially viable, 150-space
WSP NJanua
No 151-04562-0ary 2016
Exhib
The rappro
a) In
b) P
c) C
d) A
e) T
f) A
g) R
h) A
30 Y
TotaNo. oOptiAnnuAnnu
ParkTotaCapconsotheTota
AnnuRefu
AnnuPay
0
bit ES-12 – F
results indicaoximately 19
nterest-free ca
refabrication
Cost per space
Annual parking
he parking fe
Annual Mainte
Refurbish after
Annual Net Re
Year Asses
al Site No. oof Spaces Aon No. Of Sual No. of Vual Revenue
king Structual Parking Spitalized devsulting, permer related exal Capital Co
ual Maintenaurb Costs (a
ual Net Reveback Perio
Financial As
ate the garag.5 years base
apital cost $4
Structure for
e approximate
g demand 30
e of $30 for a
nance/Opera
r 25 years at
evenue of $20
sment @ 0
f Spaces OAdded
Space on Sitehicles thate Ex Place
re Cost per tructure Co
velopment, emits, parkingxpensesost
ance Costsafter 25 year
enue Differeod on Struc
sessment an
ge could be fed on the follo
million inclus
150 spaces
ely $20,000
days fully util
a minimum of
ating Cost of $
$750,000
05,000
0% Discoun
On Site
tet will Park O
Spaceostengineeringg study, cont
rs)
encecture
nd Payback
financially viowing assum
sive of plannin
lized
30 annual ev
$30,000
nt Rate
On Site
, design, tingency &
Period of a
iable and woptions:
ng studies an
vents
Future BEx
$
$
Exhibition PExhibition P
150-Space
ould have a p
nd engineering
Base: Enercaxpansion
5,40
559,35 9,300,0
-
Place Parking StPlace
Prefabricate
payback peri
g fees
re Lot 4 -Ga
08
50 00 $ 9
$ 3$ 1$
4$
$ $
$ 19
ES-19
tudy
ed Garage
od of
- Prefab rage
5,408 150
5,558 563,714
9,535,000
20,000 ,000,000,000,000
,000,000
30,000 750,000
205,000 9.5 Years
WSP NJanua
1.8
No 151-04562-0ary 2016
REC
The fo
1. P
Btrco
Wthrethknm
Uof19
Bisimpaman
2. P
S
Wofbe
C(g
Oop
M
WE
Awin
0
COMMENDE
ollowing outlin
arking Struc
ased on Net aditional parkonsistent park
When more dehe year, the be-examined. The developmenown and wh
model changes
Under the condf a new parkin9.5 years.
ased on the ts recommendemprove conditarking, bicycl
more environmnd exhibitors
arking Supp
hort-Term
Within the shof approximatee addressed w
Continue to sugrass area/BL
Optimize the cperations.
Medium-Term
Within the mednercare Cent
Any measureawith an equivancreasing tran
ED PARKIN
nes the Strate
cture
Present Valuking structure king demand
evelopment anusiness case
There may alsent of a parkinen parking des.
dition that MLng facility, a 1
typical parkinged that the $4tions on the se and transit
mentally friendto the Exhibit
ply
rt-term periodely 5,800 spacwith the futur
upplement theLC) and/or wh
current parking
m
dium-term pertre), the on-sit
able loss in palent transit in
nsit usage to E
NG STRAT
egic Parking P
e (NPV) asseat Exhibition to achieve a
nd/or a signifie for a new paso be possiblng structure/uemand warran
LSE and the C150-space pre
g demand, th4,000,000 (lessite that will refacilities on th
dly, and will btion Place gro
d (prior to anyces is sufficiee supply – 5,4
e formal on-sithen required).
g lots, especi
riod (after thete parking su
arking supply centive progrExhibition Pla
TEGY
Plan develope
essment, therPlace due toreliable ongo
icant increasearking structure future partn
underground gnts such a lar
City intend to efab facility co
e limited numss $200,000 fesult in INCREhe site. Thesee more benefounds.
y further redevent to adequa408 + 454 (op
te parking sup.
ally Lots 4, 5
e developmenpply should b
due to the deram to be impace.
ed for Exhibit
re isn’t a busino the current foing parking re
e in the numbre or new undnership opporgarage once trge capital inv
contribute a tould be financ
mber of “peak for studies) oEASED availae measures wficial to a larg
velopment ontely accommoptimized) = 5
pply with use
and 6, to inc
nt of Festival Pbe maintained
evelopment ofplemented wit
Exhibition PExhibition P
tion Place:
ness case to financial modeevenue strea
ber of large evderground partunities with Otheir future devestment, or t
total of $4,00cially viable w
events” on thr remaining $able parking swill help reducge component
n the site), an odate peak p,862 and 6,29
e of the inform
rease parking
Plaza and prid to be approx
f Festival Plath specific fun
Place Parking StPlace
support a largel and the lacm.
vents occur thrking garage Ontario Placeevelopment pthe current fin
0,000 to the cwith a paybac
he site over 3$3,800,000, bsupply, improce parking det of the visitor
on-site parkiarking events93 with Hotel
mal parking ar
g supply and
or to the expaximately 5,80
za should be nds dedicated
ES-20
tudy
ge ck of
hroughout should be
e to share in plans are nancial
construction ck period of
65 days, it e used to
oved emand, are rs, guests
ng supply s. This can X.
eas on-site
improve
ansion of 0 spaces.
replaced d to
WSP NJanua
No 151-04562-0ary 2016
DCan
L
It Efu
Am
i
ii
iii
Spasibe
3. T
A. EVhaE
B. Etybo
i
ii
iii
iv
0
Develop a conClassic) that w
nd/or addition
ong-Term (1
is recommennercare Cent
urther study o
A contingency must include:
. expande
. off-site p
. shuttle s
hould the redarking supplyimultaneous ee re-examine
ransit Infrast
xhibition PlacVillage BIA, Ra
ave ongoing mxhibition Plac
xhibition Placypes of servicox.
. Provide
. Provide connecticontinue
. The protmanaged
. Exhibitioto develoagreeme
majo
bund
tingency planwill result in mnal transit and
0 Years)
nded that any tre or Festivaln the parking
plan must be
ed transit serv
parking arrang
service
development oy may be requevents. In thisd.
tructure
ce should conatepayers Assmeetings withce.
ce, Ontario Plce that can be
extra service
coordinated sng service to
e until the end
tocol should ind by Exhibitio
on Place and op a partnersent:
or event trans
dle major eve
n to address raximum peakd shuttle servi
expansion ofl Plaza should
g demand and
e developed to
vice
gements
of Ontario Plauired to servics case, a new
ntinue to worksociation, Neh Toronto Tra
ace, TTC ande provided, wh
during major
service to Exh bring people
d of the event.
nclude all maon Place and
Ontario Placehip opportuni
sit fee – Day/E
ent tickets and
rare events (oking load, wheice is required
f Enercare Ced include somd frequency of
o address ma
ace occur withce both Ontarw parking struc
k with Ontario ighbourhood
ansit Commiss
d Metrolinx dehen, how, and
r events and s
hibition Placee in and return.
ajor events annot individual
e meet with Mty. The follow
Event/Family
d transit ticket
one to two timere off-site pad to accommo
entre or deveme level of adf event.
aximum peak
hin a 10-year rio Place and cture or new
Place and foAssociationssion and Metr
evelop a servd how the cos
special events
e during majorn them to poin
nd special evelly by each sh
Metrolinx Stratwing should be
Pass
ts
Exhibition PExhibition P
mes per year –arking arrangeodate the pea
elopment withditional parki
ing of simulta
r period, then Exhibition Plaunderground
orm new relats and local porolinx regardi
vice protocol tst will be reco
s.
r events, whicnt of origin. Th
ents at Exhibithow operator
tegic Businese considered
Place Parking StPlace
– Papal visit/Wements may bak demand.
in the vicinity ng supply sub
aneous events
a significant ace, particula parking gara
ionship with Llitical represeng improved
that identifies overed if not a
ch must includhis service sh
tion Place anor tenant.
ss Developmeas part of the
ES-21
tudy
Winter be required
of bject to
s. The plan
increase in arly during age should
Liberty entatives to service to
the various at the fare
de having hould
d be
ent Group e
WSP NJanua
No 151-04562-0ary 2016
C. Im
4. P
The foresou
Event
A. TshmgrM
i
ii
iii
iv
0
mark
incre
mprove existin
i. Improvhours.
ii. Providat Sassocial
iii. ImprovVillageenclosfeatureimprov
arking Dema
ollowing are mrces and redu
t Scheduling
he Exhibition hould continu
minimize overlroup should a
Mayor, John T
. have mo
a) “P
b) Ma
c) Ma
d) Ev
e) On
. Minimize
. Avoid scWhere it
. Avoid scparticulaclosures
keting campa
ease regular/o
ng transit faci
ve the visibility
e bus shelterkatchewan Rmedia.
vement to thee and Exhibitiosed shelters/wes. Liberty Vilvements.
and Managem
measures thauce on-site pa
Place team (ue to improve ap of large ev
also meet, at Tory. The follo
onthly plannin
arking and Tr
anagers: Park
arketing and S
vent Managem
ntario Place
e overlapping
cheduling a spt cannot be av
cheduling of marity at Ontarios or constructi
aign of transit
off-peak/spec
lities on Exhib
y of all the bu
rs and scheduRoad, and the
e existing Meton Place. Ma
waiting area, llage BIA cou
ment
at Exhibition Parking deman
(marketing, satheir ongoing
vents on and least quarterl
owing specific
g meeting wit
raffic” Coordin
king, Security
Sales
ment Services
of multiple la
porting event voided, devel
major events do Place, Liberon on critical
service to gu
cial event serv
bition Place g
us stops on th
ules at the stobus Loop on
rolinx and TTke it more attighting, seatsld be approac
Place should and, particularly
ales and parkg communicatoff-site, multiy, with the ev
c measures sh
th core team
nator (who wo
y, IT
s
arge events o
(BMO Field/Rop contingen
during off-siterty Village, Haroadways (La
est and empl
vice to Exhibi
grounds:
he grounds an
ops on Manito Canada Driv
TC Station andtractive, provis, washroom fched as a pot
adopt to improy during peak
king), show options to betteriple events onvent planning hould be cons
that should in
ould also wor
n same day
Ricoh Coliseucy plan for pa
e major eventarbourfront anake Shore Bo
Exhibition PExhibition P
loyees
tion Place an
nd provide inf
oba Drive at Nve, including l
d the walkwayide informatiofacilities and tential partner
ove the efficiek events.
perators, tenar manage andn-site and timconsortium b
sidered:
nclude:
rk closely with
um) and majoarking and tra
ts/festivals/spnd the Downtoulevard and
Place Parking StPlace
nd Ontario Pla
formation on s
Nova Scotia Ainks to websi
y between Libon and signagmore accessr for these
ent use of pa
ants and Ontad schedule ev
ming of eventsbeing propose
h Toronto Pol
or events simuaffic.
porting eventstown core andGardiner Exp
ES-22
tudy
ace
service
Avenue and tes and
berty ge, ible
rking
ario Place vents to s. This ed by the
ice)
ultaneously.
s occurring, d/or major pressway).
WSP NJanua
No 151-04562-0ary 2016
Pricin
A. D(T
B. D
Car P
A. P
Non-A
A. Ppr
0
ng Structure
Develop parkinToronto Parki
Develop/adopt
i. highesLiving/
ii. lowest
iii. for ma
iv. speciaToront
Pooling
rovide incent
i. group
ii. prefer
iii. design
iv. preferr
Auto Travel
rovide safe, crivate automo
i. ImprovShare
ii. Increa
in thr
ap
incEn
ov
iii. Provid
ng rates that rng Authority,
t parking rates
st rates near t/BMO Field)
t rates on the
ajor events wh
al event rates to and is acce
ives for guest
discounts on
rred parking s
nated parking
red entrance
convenient opobiles. The fo
ve and increainventory ope
se the numbe
the short-termree percent o
pproximately 4
crease the cunercare Centr
ver time, incre
e appropriate
reflect locatioOntario Place
s that help to
the centre of t
periphery to
hen on-site su
ranging fromeptable for the
ts who car/va
tickets
spaces
spaces
pportunities allowing meas
ase the on-siteerated by the
er of on-site a
m, increase thf guests that
400 of the bik
urrent supply ore to approxim
ease the numb
e signage for
n of event, cue, Fort York,
manage park
the site or de
deter motoris
upply is low, a
$20 to $30 ise site.
anpool (three
nd facilities foures can be i
e and off-site Toronto Park
and safe bicyc
he number of arrive by bike
ke racks shou
of 250 bike ramately 400 an
ber of bike loc
bike storage
urrent marketprivate vendo
king and traffi
stination poin
sts from enter
adopt highest
s consistent w
or more) to th
or guests to trimplemented:
cycling facilitking Authority
cle lockers an
f bike racks froe
uld be in very
acks inside thnd include bik
ckers and bik
and commun
Exhibition PExhibition P
t and off-site eors in Liberty
ic on-site:
nt (Enercare/A
ring the centre
t parking rates
with special e
he site such a
ravel to Exhib:
ties, includingy.
nd bicycle par
om 550 to 1,0
close proxim
e garage andke lockers in t
ke racks to 1,5
nicate it to gue
Place Parking StPlace
events and coVillage).
Allstream/Bett
e
s but vary by
vent rates in
as:
bition Place w
g additional To
rking racks
000 represent
ity to BMO Fi
d adjacent to this location
500
ests.
ES-23
tudy
ompetitors
ter
location
the City of
without
oronto Bike
ting the
eld
the
WSP NJanua
No 151-04562-0ary 2016
5. P
Pay a
It
Wtr
Rcu
Am
Pay-o
Fca
Pre-P
Adpr
Mobil
W(cca
6. D
Inanfore
Intoshpa
0
iv. Duringincrea
v. In the structu
vi. Increafrom p
arking Equip
and Display
is recommen
Wireless netwoansaction tim
Review the pourrent Pay-an
Acquire Parkinmonitoring of K
on-Foot and P
or the Enercaashier booths
Purchase of P
Adopt an onlinisplaying it onrocessing tim
e Payment of
Work with the Tcustomers usiard and credit
Digital Parkin
n the short to nd west sides
or directing peeduce delays
n the medium o all major parhould be tied arking person
g special showses, continue
long-term, prure or parking
se the numbeparking lots an
pment and T
nded that exis
ork 2G commmes.
ssible deploynd-Display ve
ng ManagemeKey Performa
Parking Guida
are Centre pas with a fully a
arking Fees O
e application n the dash an
mes and line-u
f Parking Fee
Toronto Parking their smart card payme
g Informatio
medium-terms of garage) aeople to the eand queues.
to long-term,rking lots andto a main net
nnel with live
ws and eventse to provide in
ovide a securg expansion.
er and width ond bus station
echnology
sting pay-and-
munications be
yment of the “tndor.
ent Software tance Indicator
ance for Enerc
arking garageautomated pa
Online
that allows cd having a m
ups).
es
king Authority rtphones) as jnt methods.
on
m, install a basand digital “nuxpress “pay b
, install digitald garages, (mtwork that alloinformation.
s (CNE, Homncreased bike
re and shelter
of sidewalks ans/stops, and
-display mach
e upgraded to
tap & go” feat
tied to financirs.
care Garage
, examine they-on-foot sys
ustomers to pobile attenda
or Ontario Pljust another f
sic parking “loumber of spacby credit card
l information aore than 200 ows guests to
me Show), whee storage thro
red bike stora
and pathwaysalong Prince
hines be utiliz
o the 3G com
ture using the
ial statements
e feasibility ofstem.
pre-buy a barant scan (usin
lace in the deform of paym
ot full” displayces available”d” lanes on en
at selected enspaces) indic
o remotely ob
Exhibition PExhibition P
ere the numbough temporar
age area with
s leading to thes’ Boulevard
zed more.
munications r
e Interac Flas
s for monthly
f replacing the
rcoded parking handheld s
eployment of aent in additio
y board at the” with a green
ntry, to improv
ntry points to cating space
btain parking i
Place Parking StPlace
ber of cyclists ry measures.
any future pa
he buildings, ein front of BM
resulting in fa
sh debit card w
measuring an
e manual atte
g permit priorscanners to re
a mobile pay n to coin, bill
e two entrancen and red lighve customer s
the grounds availability. Tnformation an
ES-24
tudy
on the site
arking
especially MO Field.
aster
with the
nd
endant
r to arriving, educe
application notes, debit
es (east t system,
service and
and entry This system nd update
WSP NJanua
No 151-04562-0ary 2016
Mmta
7. S
Comm
Danac
Bth
Perso
P
Custo
Dam
Acces
Imse
0
Make user-friemodes of transaxi, etc.) and G
ite Operation
munication an
Designate a “Pnd parking issccess and op
uild on the pehroughout Exh
every site
name or n
improve si
provide dig
onnel Training
arking operat
how to ope
customer s
parking an
omer Service
During major embassadors t
ssibility
mprovements eniors. These
clear and a
increase thwalkers, sc
more visib
the access
ndly improvesportation andGoogle maps
ns and Mana
nd Signage
Parking and Tsues, regardin
perations on th
ending signaghibition Place
entry, parking
umber each p
gnage and w
gital signs of p
g
tions staff to r
erate the vario
service
nd traffic mana
Ambassadors
events/showsto assist gues
are required e could includ
accessible pa
he number of cooters and s
le way-finding
sible entry po
ments to the d links to othes.
agement
Traffic” Coording events on he ground.
ge program bye, including:
g lot entry and
parking lot (hi
ay-finding me
parking availa
receive basic
ous parking e
agement mea
s
, provide on-ssts in navigati
on-site to mae:
athways betwe
sidewalks anstrollers
g signage, es
int for BMO F
Exhibition Plaer service pro
inator to liaisethe grounds
y implementin
d exit point
ghly visible: l
easures betwe
ability at each
training on:
equipment on-
asures
site and at maing the site.
ake the site m
een the parki
nd walkways a
specially show
Field should b
ace website, oviders’ websi
e with others and surround
ng directional
arge fonts, co
een Exhibitio
h parking lot a
-site
ajor entry poin
more accessib
ng lots, trans
and their widt
wing elevators
be more visibl
Exhibition PExhibition P
providing dynites (i.e., TTC
and disseminding area, tha
l signage and
ontrasting col
n Place and O
and garage
nts, highly vis
ble to guests w
sit stations an
th, to accomm
s, ramps
e and better m
Place Parking StPlace
namic informaC, GO Transit,
nate informatiat may impact
d way-finding
lour and refle
Ontario Place
sible custome
with mobility i
d major build
modate wheel
marked for th
ES-25
tudy
ation on all , cycling,
on on traffic t guests
measures
ctive)
e
er service
issues and
ings
lchairs,
he public
WSP NJanua
No 151-04562-0ary 2016
Pick-u
Inco
Inw
H
Safety
Im
Parkin
Bpoligad
Aelimreunhaha
Uye
0
up/Drop-off Fa
ncorporate deonvenience to
ncorporate picwhen Festival
Have a design
y and Securit
mprove on-sit
reduce cas
significantlparking lot
increase thlots
ng Maintenan
udget 10 percower washingghting and sigdditional 4 to
Allocate annualevators, park
mprovements efurbishment nderground) aave a 15-yeaave a life cyc
Undertake a phear budget pr
acility
esignated picko guests.
ck-up/drop-offPlaza is intro
ated pick-up/
ty
e safety and
sh transaction
ly improve ligt
he number of
nce
cent of the pag facilities, pagnage upgrad5 percent of t
ally 1 percent king lot repavifor both surfaof surface paat Year 25 fror life, while unle of 50 years
hysical “stateriorities.
k-up/drop-off a
f facility into tduced.
/drop-off area
security meas
ns other than
hting (volume
security surv
arking operatiavement line mdes for both sthe parking o
of the total vaing, lighting sace lots and parking lots at Yom the date onderground ps or more, if m
of good repa
areas through
he redesign a
and layover
sures:
by pay-and-d
e and wattage
veillance came
ng budget formarkings, pavurface lots anperating budg
alue (cost) of ystem replac
parking structYear 15 and pof initial openinarking structu
maintained pro
air” inventory
hout the site t
and re-line ma
area for tour
display meter
e) throughout
eras on the s
r annual mainvement patchnd parking strget.
f parking capitcement and tetures. This anparking structng of the faciures and prefoperly.
and evaluatio
Exhibition PExhibition P
to improve tra
arking of surf
buses and m
rs
t the site, esp
site, particular
ntenance, covhing and repaructures. Sno
tal assets for echnology (sonnual allocatiotures (above glities. Surfacefabricated abo
on program to
Place Parking StPlace
affic flow and
face Lots 1, 2
motor coaches
ecially at eac
rly within surfa
vering sweepiir, equipmentw clearing wo
major upgradoftware and haon should be ground and e parking lots ove ground st
o establish fiv
ES-26
tudy
and 3,
s.
ch surface
ace parking
ing and t repair, and ould add an
des to ardware) used for
typically tructures
ve and 10-
WSP NJanua
No 151-04562-0ary 2016
8. T
Short
R
PreB
RacdLa
Etoro
Pes
In
Pim
0
raffic Manag
-Term Plan
Reduce or elim
provide sigRoad, wes
in the shor
Pr
No
On
Qu
ermanently ceduce delay, toulevard.
Restripe Britishccommodate irection of trafake Shore Bo
stablish a proo all traffic sigoad conditions
rovide paid dstablished) at
British Col
Lake Shor
Lake Shor
Strachan A
nstall permane
Nova Scot
Quebec St
rovide a paidmprove pedes
gement Plan
minate through
gnage advisinst of Strachan
rt-term during
rinces’ Boulev
ova Scotia Av
ntario Drive fr
uebec Street
close the roadtraffic conges
h Columbia Rthree travel lffic. One of thoulevard. A se
otocol arrangenals at the ens.
uty officers (ut the signalize
umbia Road a
re Boulevard a
re Boulevard a
Avenue and F
ent all-way st
tia Avenue an
treet/Parking
duty officer astrian safety d
h traffic on Ex
ng motorist than Avenue, and
major events
vard between
venue betwee
rom Princes’ B
dway through stion and safe
Road betweenanes. The ce
he two requireecond will be
ement with thntry points to
until coordinated access poi
and Lake Sho
and Ontario D
and Newfoun
Fleet Street
tops at the fol
nd Manitoba D
Lot 4 exit and
at Nova Scotiduring all TFC
xhibition Plac
at access poid Princes’ Bou
s and BMO F
Newfoundlan
en Manitoba D
Boulevard to
Princes’ Gateety concerns a
n Lake Shore ntre lane to b
ed signs is curequired on B
e Toronto Trathe Exhibition
tion and contints around th
ore Boulevard
Drive
dland Drive
lowing locatio
Drive
d Manitoba D
a Avenue andC games or ot
ce grounds pa
ints east of Dulevard are fo
ield activity, r
nd and Ontar
Drive and Prin
Manitoba Dri
e to vehicularat Strachan A
Boulevard anbe used as a rrrently presenBritish Colum
affic Managemn Place groun
trol from Torohe site during
d
ons to help m
Drive
d Manitoba Dther major eve
Exhibition PExhibition P
articularly duri
ufferin Streetor event traffic
restrict vehicu
rio unless des
nces’ Bouleva
ve
r traffic to impAvenue/Prince
nd Saskatchereverse trafficnt on British Cbia near Sas
ment Centre, nds, in coordi
onto Traffic Ma major events
manage traffic
Drive to controents on-site.
Place Parking StPlace
ing events:
t on Saskatchc only
ular traffic on:
stined to Park
ard
prove on-site ces’ Gate and
ewan Road toc lane to matcColumbia Drivkatchewan R
to provide adnation with bo
anagement Cs:
and pedestri
ol pedestrian f
ES-27
tudy
hewan
king lots
circulation, Lake Shore
o ch the peak ve near
Road.
djustments oundary
Centre is
an conflict:
flow and
WSP NJanua
No 151-04562-0ary 2016
P
Aev
Atw
Long-
Wbe
Aimth
The Tare pr
A high
.
0
rovide interlo
GO Transi
TTC Statio
At the discretiovents on-site,
At the discretiowo-way to dis
British Col
Alberta Cir
Saskatche
Ontario Dr
-Term Plan
When Festival e included:
realign No
realign Pri
close Princpedestrian
All signalized amprove inbounhe site (the nu
Traffic Managrovided in Exh
h level cost es
cking bricks o
t Station/Nov
on Exist/entra
on of the Park, to improve tr
on of the Parkperse traffic i
umbia Road
rcle
ewan Road
rive
Plaza is impl
va Scotia Ave
nces’ Bouleva
ces’ Boulevarn walkway, cre
access pointsnd and outboumber, events
ement Plan ishibits ES-14,
stimate of the
or other roadw
va Scotia Ave
ance and Man
king Managerraffic flow and
king Managern a timely and
lemented or L
enue to align
ard to termina
rd between Neating safe re
s be coordinatund flow withs and duration
s provided in ES-15 and E
e recommend
way treatmen
nue and Man
nitoba Drive
r, provide traffd to direct gue
r, operate secd efficient ma
Lots 1, 2 and
with New Bru
ate at Nova S
ova Scotia anefuge for pede
ted and contrh boundary ron predetermin
Exhibit ES-13ES-16.
improvemen
nt to alert moto
nitoba Drive
fic control perests.
ctions of the foanner:
3 are redesig
unswick Way
Scotia Avenue
nd Ontario to estrians
rolled from Toad conditionsned based on
3 and the reco
nts are provide
Exhibition PExhibition P
orists of high
rsonnel at key
ollowing road
gned, the follo
e
vehicular traf
oronto Traffic s, especially dn agreed-upon
ommended ro
ed in Exhibit
Place Parking StPlace
pedestrian a
y locations du
ways as one-
owing measur
ffic, and make
Managementduring major en protocol).
oadway impro
ES-17
ES-28
tudy
reas at:
uring major
-way or
res should
e it a
t Centre to events at
ovements
L
A
K
E
S
H
O
R
E
B
L
V
D
W
E
S
T
BR
IT
IS
H C
OLU
MB
IA
R
OA
D
ALBERTA CIRCLE
DUFFERIN STREET
NO
VA
SC
OT
IA A
VE
.
M
A
N
I
T
O
B
A
D
R
I
V
E
SA
SK
AT
CH
EW
AN
R
OA
D
L
A
K
E
S
H
O
R
E
B
L
V
D
W
E
S
T
LA
KE
S
H
O
R
E B
LV
D
W
ES
T
PR
IN
CE
SS
B
LV
D.
QU
EB
EC
S
TR
EE
T
NU
NA
VU
T R
OA
D
N
U
N
AV
U
T R
O
AD
PR
IN
CE
SS
B
LV
D.
PR
IN
CE
SS
B
LV
D.
ONTARIO DRIVE
PRINCESS BLVD.
MA
NIT
OB
A D
RIV
E
STRACHAN AVE.
CANADA BLVD.
C
AN
AD
A B
LV
D
.
NEW BRUNSWICK DRIVE
GA
RD
IN
ER
E
XP
RE
SS
W
AY
GA
RD
IN
ER
E
XP
RE
SS
W
AY
DUFFERIN STREET
SP
RIN
GH
UR
ST
A
VE
NU
E
FRASER AVE.
ATLANTIC AVE.
L
I
B
E
R
T
Y
S
T
R
E
E
T
LIB
ER
TY
S
TR
EE
T
M
A
N
I
T
O
B
A
D
R
I
V
E
STRACHAN AVE.
GO
TT
C
N
E
W
F
O
U
N
D
LA
N
D
D
R
IV
E
D
O
U
R
O
S
T
R
E
E
T
Mo
difie
d:
151-04562-00_T
rafficM
anagm
ent_K
assel_0-1_20151014_2010.dw
g_
Base T
MP
(2)
12/21/2015 4:49 P
M
By:
mobeen.yousafzai
S:\MA\15\151-04562-00 ExhibitionPlaceParkingStudy\3.0 Technical\3.7 CAD & Figures or 3D (Optional out-dent)\Final
Plo
t D
ate
:
2015/12/22
So
urce: G
oogle E
arth, 2015.
Pe
ak e
ve
nt m
ay re
qu
ire
a
dd
itio
na
l m
ea
su
re
s
Exhibit E
S - 13
Traffic M
anagem
ent P
lan - S
hort to M
edium
T
erm
Exh
ib
itio
n P
la
ce
P
arkin
g S
tu
dy
LE
GE
ND
Exp
erie
nce
d tra
ffic co
ntro
lle
r
Pa
id
d
uty o
ffice
r - co
ntro
l tra
ffic sig
na
l - S
ho
rt te
rm
Co
ntro
lle
d b
y C
ity's T
ra
ffic M
an
ag
em
en
t
Ce
ntre
- lo
ng
te
rm
Pe
de
stria
n a
cce
ss
Pe
de
stria
n p
ath
/ w
alkw
ay
Ro
ad
clo
se
d
Eve
nt p
arkin
g o
nly
Pe
rm
an
en
t clo
su
re
fo
r ve
hicle
s
Re
ve
rse
tra
ffic la
ne
s to
m
atch
p
ea
k tra
ffic flo
w
No
te
: A
ll a
pp
lie
d a
t m
ajo
r e
ve
nts
L
A
K
E
S
H
O
R
E
B
L
V
D
W
E
S
T
BR
IT
IS
H C
OLU
MB
IA
R
OA
D
ALBERTA CIRCLE
DUFFERIN STREET
NO
VA
SC
OT
IA A
VE
.
M
A
N
I
T
O
B
A
D
R
I
V
E
SA
SK
AT
CH
EW
AN
R
OA
D
L
A
K
E
S
H
O
R
E
B
L
V
D
W
E
S
T
LA
KE
S
H
O
R
E B
LV
D
W
ES
T
PR
IN
CE
SS
B
LV
D.
QU
EB
EC
S
TR
EE
T
NU
NA
VU
T R
OA
D
N
U
N
AV
U
T R
O
AD
PR
IN
CE
SS
B
LV
D.
PR
IN
CE
SS
B
LV
D.
ONTARIO DRIVE
PRINCESS BLVD.
MA
NIT
OB
A D
RIV
E
STRACHAN AVE.
CANADA BLVD.
C
AN
AD
A B
LV
D
.
GA
RD
IN
ER
E
XP
RE
SS
WA
Y
GA
RD
IN
ER
E
XP
RE
SS
W
AY
DUFFERIN STREET
SP
RIN
GH
UR
ST
A
VE
NU
E
FRASER AVE.
ATLANTIC AVE.
L
I
B
E
R
T
Y
S
T
R
E
E
T
LIB
ER
TY
S
TR
EE
T
M
A
N
I
T
O
B
A
D
R
I
V
E
STRACHAN AVE.
151-04562-00_E
xhibitionP
laceT
rafficM
anagm
ent_0-1_20151002.dw
g_
AR
chD
S:\MA\15\151-04562-00 ExhibitionPlaceParkingStudy\3.0 Technical\3.7 CAD & Figures or 3D (Optional out-dent)\Final
So
urce: G
oogle E
arth, 2015.
LE
GE
ND
E
XIS
TIN
G R
EV
ER
SE
LA
NE
S
IG
NA
L
PR
OP
OS
ED
R
EV
ER
SE
LA
NE
S
IG
NA
L
Exhibit E
S - 14
Roadw
ay Im
provem
ents
Exhibition P
lace P
arking S
tudy
DIG
IT
AL P
AR
KIN
G D
IS
PLA
Y LO
T #,
AV
AILA
BLE
P
AR
KIN
G S
PA
CE
S
Mo
difie
d:
12/18/2015 8:09 A
M
By:
mobeen.yousafzai
Plo
t D
ate
:
2015/12/22
Convert one lane to reversible
Reverse lane signal
Introduce reverse lane and signal
Pedestrian crossw
alks
Exit only from
Lot A
Perm
anent C
losure
2 - B
ritish C
olum
bia R
oad
3 - M
anitoba D
r. at
Quebec S
t
5 - M
anitoba D
r. / N
ova S
octia A
ve.
7 - F
leet S
t. / Lot A
8 - C
anada B
lvd. / P
rincess B
lvd.
Interlocking for pedestrian crossing
6 - M
anitoba D
r. / T
TC
T
erm
inal
Interlocking for pedestrian crossing
Access to Lot 4
4 - M
anitoba D
r. /
Lot 4 A
cces
1 - Lake S
hore B
lvd. / B
ristish C
olum
bia R
d.
Mo
difie
d:
151-04562-00_E
xhibitionP
laceT
rafficM
anagm
ent_0-1_20151002.dw
g_
Roadw
ay Im
p W
est
12/18/2015 8:09 A
M
By:
mobeen.yousafzai
S:\MA\15\151-04562-00 ExhibitionPlaceParkingStudy\3.0 Technical\3.7 CAD & Figures or 3D (Optional out-dent)\Final
Plo
t D
ate
:
2015/12/22
So
urce: G
oogle E
arth, 2015.
Exhibit E
S - 15
Roadw
ay Im
provem
ents W
est S
ide- S
hort to M
edium
T
erm
E
xhibition P
lace P
arking S
tudy
Mo
difie
d:
151-04562-00_E
xhibitionP
laceT
rafficM
anagm
ent_0-1_20151002.dw
g_
Roadw
ay Im
p E
ast
12/18/2015 8:09 A
M
By:
mobeen.yousafzai
S:\MA\15\151-04562-00 ExhibitionPlaceParkingStudy\3.0 Technical\3.7 CAD & Figures or 3D (Optional out-dent)\Final
Plo
t D
ate
:
2015/12/22
So
urce: G
oogle E
arth, 2015.
Exhibit E
S - 16
Roadw
ay Im
provem
ents E
ast S
ide - S
hort to M
edium
T
erm
E
xhibition P
lace P
arking S
tudy
ES
-33
WSP N
o 151-04562-00 E
xhibition Place P
arking Study January 2016
Exhibition P
lace
Exhibit ES-17 – Prelim
inary Cost Estim
ate of Improvem
ents
Exhibition Place Parking StudyPrelim
inary Cost Estim
ate of Recom
mendations
January-16
12
34
5Final
Report
Reference
Parking Strategy InitiativeH
igh Level Budget
Estimate
Short-term(2017)
Medium
-term(2018-2023)
Long-term(2024-2029)
Com
ments
11.2 A 4O
ptimize on-site parking supply - Lots 4, 5, 5A and 6, does not include electrical, draining and
relocating servicing if required. 2,300,000
$ 1
1D
oes not include Lots 1, 2 and 3
11.3 B (iv)
Extra G
O Train services for special events (G
O Transit to advise on protocol &
contributions.)TB
D1
GO
advised during study, 12 coach train carries 1,944 customers,
75% recovered from
farebox & $6 average fare, therefore = Total
$11,664 revenue per train X 4 trains per event= $46,656 in gross revenue per special event. N
eed cost per train from G
O and how
m
any trains per event are required.
11.2 B, (iv)
Partnership w
ith Ontario P
lace, Metrolinx and TTC
on transit services, promotions, fam
ily pass (TTC
has this already), etc.150,000
$ 1
Budget 2%
of total special event revenues for marketing
11.3 C, (ii)
Provide 2 large on-site transit shelters
40,000$
1 S
hould work w
ith GO
and TTC to look at cost sharing, or negotiate
directly with C
ity's transit shelter advertising company.
11.5.1, BU
pgrade existing 30 Pay &
Display m
achines from 2G
to 3G netw
ork comm
unications.75,000
$ 1
Includes new m
odems and card readers.
11.5.1, CU
pgrade to accept contactless Interac Flash debit card for 30 P&
D m
achines20,000
$ 1
Includes hardware and softw
are.
11.5.1, DAcquire P
arking Managem
ent Softw
are (if pay-on-foot system acquired, this is included)*
75,000$
1
In interim a low
cost Key P
erformance Indicators (K
PIs) application
could be developed for $35,000 using Microsoft Access and E
xcel by extracting data from
P&
Ds and other financial &
operational data sources.
11.5.2, AAcquire P
ay-on-Foot parking access revenue control system to replace E
nercare garage cashiers*500,000
$ 1
Includes complete system
: entry/exit terminals, 3 pay stations,
software, gates and installation (subject to detailed review
of com
munication, netw
orking, trenching and power requirem
ents).
11.5.3, AAcquire P
re-Purchase P
arking Fee Barcode O
nline Softw
are Application & handheld barcode
scanners for Ex. P
lace on-site special events parking staff*75,000
$ 1
Another alternative is to work w
ith parking vendor, ecomm
erce provider or online ticket seller, w
here a transaction fee may apply,
but no capital investment required.
11.5.4, AAcquire m
obility payment parking application by w
orking with TP
A and/or Ontario P
lace*10,000
$ 1
In addition, a user convenience fee is typically charged to the parking custom
er ranging from $.25 to $.35 per transaction.
11.6, AO
btain "Lot Full" display board and real-time digital parking spaces availabilty for E
nercare garage 2 entrances*
50,000$
1
Digital signs are $10,000 each, the balance is installation, softw
are and com
munications. Individual parking spaces are not m
onitored, w
hich is a longer-term and m
ore expensive parking guidance solution.
11.6, BAcquire digital cam
pus-wide type of parking guidance system
and phase-in at major entry points*
3,000,000$
1B
udget $500 per space. As the technology matures and becom
es m
ore widely deployed, price per space should drop.
11.6, CD
evelop a user-friendly multi-m
odal transportation (including parking & other transportation m
odes) dynam
ic real-time w
ebsite to replace current static website.
40,000$
1The trend now
is away from
specially designed smartphone/tablet
apps and towards w
ell designed websites that m
ay be accessed by any type of com
puting device.
6,3
35,0
00
$
67
1*N
ote
: Ven
do
rs o
ffer 5
an
d 1
0 y
ear le
ase a
gre
em
en
ts o
n
park
ing
eq
uip
men
t & s
oftw
are
as w
ell a
s re
ven
ue s
harin
g
pro
gra
ms to
assis
t clie
nts
in a
mo
rtizing
the c
osts
.
Priority