Download - Fact Sheet for Ark @ Gambas
-
Private & Confidential. Not for Unauthorised Circulation. Subject to change without prior notice.
GENERAL INFORMATION
Project Name
Ark@Gambas
Developers Name
HLS Development Pte Ltd
District
D27 / Sembawang
Zoning
B1
Tenure
60 years from 20/02/2012
Address
7 Gambas Cres Singapore 757087
General Description
9-storey Multiple-user light industrial B1 development with roof garden on Lot 05948T Mukim 13 at Gambas Ave/ Gambas Cres: Total: 294 units 137 units Type A 64 units Type B 24 units Type C 6 units Type D 18 units Type E 4 units Type F 40 units Type M 1 staff canteen 2 roof terraces on L8
No. of Storeys
9
Type / No. of Units Total Units: 293 factory units 1 canteen Available Units (Approx in area) Immediate Occupancy
Over 95% Units Are Fully Sold Level 2 Level 9 (Sold Out) Canteen (Sold & in Operation) Level 1 left 14 units only Unit #10 to Unit #15 (Type M2), Unit #22 to Unit #27 (Type M2) 209 sqm / 2,249.68 sq ft
Unit #21 (Type M6) Corner 207 sqm / 2,228.15 sq ft
Unit #37 (Type M1) 209 sqm / 2,249.68 sq ft
T.O.P.
21st Nov 2014
Legal Completion Date
Nov 2017
Site Area (approx.)
21,426.7 sqm / 230,635 sq ft
Maintenance Fees
Defects Liability Period
$273 pm + GST (pay half yearly)
The 12 months defects liability period will run till 20th Nov 2015.
-
Private & Confidential. Not for Unauthorised Circulation. Subject to change without prior notice.
TECHNICAL SPECIFICATIONS (Refer to Developer Building Specifications for details)
Floor to Floor Height
1
st to 2
nd storey: approx. 7.0m
2nd
onwards up to 9th
storey: please refer to building specification for details. Estimated from 4.0m to 6.0m
Power Supply Provision (in approx.)
Factory/Production Units Unit Area greater than 200m2 is 100A, 3-Phase Isolator
Floor and Wall Finishing and Attached Toilet
Floor Finishes: Factory units Power trowel with hardener to production and power trowel to mezzanine. The toilet within the unit has porcelain and/or ceramic tiles to the floor and wall. Wall Finishes: The wall finish is skim coat with paint finish
Passenger Lifts Cargo Lifts Service Lifts Floor Loading
Passenger Lift: 4 Passenger cum Fire Lift: 2 Service Lift: 2 (2,000 kg) Cargo Lift: 2 (2,000 kg)
Production 1
st storey: 12.5 kN/m2
1st
storey Mezz: 3.0 kN/m2
Doors for Units
Doors: Fire-rated and non-fire rated doors
Car park lots (2 lots per unit) 40 footer loading/ unloading bay
830 common car parking lots 6 common handicap car park 15 common lorry parking lots 4 common articulated Vehicle/ Lorry parking lots
Developer Details Developer Name : HLS DEVELOPMENT PTE LTD
Mode of Sale : Direct Developer Sale
Type of Sale Document Used: Developer Booking Form & Developers OTP Document
Payment Scheme: *Booking Fee or Option Money = 5% + GST (7% GST of 5%) - agent to collect 2 cheques (Note: *Option Money will be forfeited if Buyer didnt Exercise OTP)
OTP Exercise Date: Within 2 weeks. To pay Deposit 10% 10% - 5% (Option Money) = 5% + GST (of 5%). On Exercise Date, cheque to pay to NAME OF DEVELOPER Completion Date: Within 8 weeks from date of OTP Exercise Date = 80-90% (TBA by Developer Lawyer)
DEVELOPERS SOLICITOR
MESSRS LEONG CHUA & WONG (Attn: Mr Chua Leong Hin)
-
Private & Confidential. Not for Unauthorised Circulation. Subject to change without prior notice.
Developer: Hock Lian Seng Other Projects: Ark@KB, Ark@Gambas, The Skywoods
Joint Marketing By:
-
Private & Confidential. Not for Unauthorised Circulation. Subject to change without prior notice.
Location Plan
-
Private & Confidential. Not for Unauthorised Circulation. Subject to change without prior notice.
Connectivity
Site Plan
-
Private & Confidential. Not for Unauthorised Circulation. Subject to change without prior notice.
-
Private & Confidential. Not for Unauthorised Circulation. Subject to change without prior notice.
DEVELOPER DISCOUNTED SALE PRICE Discount 15% by Developer as at 29 July 2015 - All Ground Floor Units