BUILDINGS & GROUNDS
ACCOMPLISHMENTS
SASSO FIELDNew Turf Field Installed
Sasso Field Painted buildings & new tent
Sasso Field Lightning Detector
SASSO FIELD
• New cameras Installed• Sealed blacktop under bleachers
High School A-gym Floor Refinished
FAIR LAWN HIGH SCHOOL
B-WING CAFETERIA
ROOF
HIGH SCHOOL
• Abated 3 classrooms (Rms B120, B122, B204)• Painted 5 classrooms• Retiled A-wing girls’ bathroom• HS Stage Lighting• HS Lighting (pending)• Auditorium underground conduit, carpeted
aisles
Memorial – Completed installation of windows on west side of building
Memorial SchoolPainted lockers on 1st and 2nd floor
MEMORIAL SCHOOL – Trimmed trees back from field
Memorial SchoolTrimmed trees back from steps
MEMORIAL SCHOOL
• Installed new energy efficient LED lights in auditorium
• Rm 214 – converted from storeroom to classroom instruction
• Auditorium – rebuilt exhaust fan• Repaired terrazzo floor outside main office
THOMAS JEFFERSON SCHOOL
Repaved & striped front lotWidened exit driveway to allow right & left turns upon exiting
THOMAS JEFFERSON SCHOOL
• Painted lockers and installed new lockers on 1st floor
• Carpeted 5 offices in Child Study Team room• Boys’ locker bathroom and boys’ room by Rm 119
– installed new floor drains & waterless urinals• Installed wireless clock system• Rm 116 – abated floor and installed VCT tile
EDISON SCHOOL
Moved sign from HS and installed at
Edison
EDISON SCHOOL
• Paving of front lot and re-striping for bus access (pending)
• Repaired windows
FORREST SCHOOL
• Installed VCT tile in 4 classrooms• Moved KECO from Forrest to Edison School
Lyncrest School Canopy, Ceiling & LED lights
MILNES SCHOOLRefurbished 2 storm drains in rear parking lot and repaved.
INSTALLED CHAIRLIFT
AT
MILNES SCHOOL
Radburn School
Kindergarten WindowsInstalled new
energy efficient thermopane
windows
RADBURN SCHOOL
• Converted music room to new kindergarten room on ground floor
• Installed new security gate on ground floor by new addition lobby
• Ground floor boys’ room in stairwell – installed new floor drains and waterless urinals
Warren Point SchoolInstalled new digital sign on
Broadway
Warren Point SchoolMilled and repaved teacher parking lot and installed new security
gates
Warren Point SchoolInstalled 100 cubic yards of mulch on playground
Warren Point SchoolInstalled new Fire Doors in old wing-1st floor
Westmoreland SchoolInstalled energy efficient thermopane windows in gym
WESTMORELAND SCHOOL
• Replacement of bathroom partitions (pending)
DISTRICT
• Installed security locks in all school buildings• Room numbers stenciled on exterior windows
in all school buildings• Purchased maintenance truck• Purchase of leaf vacuum (pending)• Purchase of salt spreader (pending)