Florida Department of Transportation
FDOT District Four Major Projects
Florida Department ofTRANSPORTATION
Vanita Saini, PEDistrict Four Project Manager
![Page 2: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/2.jpg)
Florida Department of Transportation
FDOT District Four Major Projects
• US-1 Bascule Bridge Replacement, Jupiter Inlet Palm Beach County – Bid Opening May 2021 – FM# 428400-2
• SR A1A North Causeway Bridge Replacement St. Lucie County – Bid Opening October 2021 - FM# 429936-2
• SR-710 Beeline Hwy Reconstruction/Widening Palm Beach County – Bid Opening March 2022 - FM# 419251-1
• SW 10th Street & I-95 Direct Connector Broward County – I-95 Bid Opening July 2023 - FM# 436964-2
SW 10th Bid Opening July 2024 – FM# 439891-1
![Page 3: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/3.jpg)
Florida Department of Transportation
Project Locations
SR 710 (Northlake Blvd to Blue Heron Blvd)
SW 10th Street Connector
Jupiter US 1 Bridge (CR A1A to Beach Rd)
Not to ScaleSR A1A North Causeway Bridge
Project milestones reflected in the presentation are subject to change; they are based on current project schedules and funding.
![Page 4: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/4.jpg)
Florida Department of Transportation
SR 5/US-1 Federal Highway Bridge• Bridge Length – 915 ft• Roadway Reconstruction – 2,470 ft• Full closure with detour• Intersection improvements and ITS along
detour route• Innovations included
Pre-detour work Hybrid-phased construction – Commission half
of new bridge during detour Precast elements for bascule pier footing Preassembly of bascule leaves Simplified machinery and electrical installation
Location Map
![Page 5: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/5.jpg)
Florida Department of Transportation
INTERSECTION IMPROVEMENT 1US 1 at Beach Rd/Alt A1A at Old Dixie Hwy
INTERSECTION IMPROVEMENT 3US 1 at SR 706
INTERSECTION IMPROVEMENT 2ALT A1A at SR 706
Intersection improvements along detour route
Mitigate community impacts during detour
New ITS features along detour route
SR 5/US-1 Federal Highway Bridge
![Page 6: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/6.jpg)
Florida Department of Transportation
Improved Navigational Clearances
90’ between fenders
25’ @ Center
Existing Bridge Navigational Clearances
21’ @ Fender
Proposed Bridge Navigational Clearances
125’ between fenders
42’ @ Center38’ @ Fender
Florida Department of Transportation
![Page 7: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/7.jpg)
Florida Department of Transportation 7Florida Department of Transportation
SR 5/US-1 Federal Highway Bridge
Twin Double Leaf Bascule Span
![Page 8: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/8.jpg)
Florida Department of Transportation 8Florida Department of Transportation
SR 5/US-1 Federal Highway BridgeTwin Double Leaf Bascule Span
![Page 9: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/9.jpg)
Florida Department of TransportationFlorida Department of Transportation
SR 5/US-1 Federal Highway BridgeProject Status/Schedule
Initial Plans (30%)January 2018
Constructability Review(60%)November 2019
Biddability Preparation(90%)May 2020
Plans CompleteDecember 2020
Bid OpeningMay 26, 2021
Construction Phase beginsJuly 2021
• Design-Bid-Build Project• Current Estimate $126 Million• FDOT PM Bing Wang• Project Website: https://www.fdot.gov/projects/jupiterus1bridge/main
![Page 10: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/10.jpg)
Florida Department of Transportation
Project Location Map
• SR 710 Roadway Reconstruction –3.1 miles
• Northlake Blvd Roadway Reconstruction - 4000 ft.
• Turnpike Bridge Length – 320 ft. 10 Lanes (180 ft. wide) Pre-Stress Concrete
• Lighting, Mast Arm Signalization, Closed Drainage System with Ponds, and Railroad Crossing
SR 710 Beeline Highway Reconstruction / Widening
![Page 11: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/11.jpg)
Florida Department of Transportation
Partial Continuous Flow Intersection• The partial continuous flow intersection will direct vehicles turning left from SR 710 / Beeline
Highway to Northlake Blvd. away from the main intersection to relieve congestion • U-turn movements introduced for left turn movements:
o WBL from Northlake Blvd. to SB SR 710o SBL from SR 710 to EB Northlake Blvd.
• Level of Service improvements for peak hour design year 2042• Reduces Right of Way impacts
![Page 12: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/12.jpg)
Florida Department of Transportation
Partial Continuous Flow Intersection
![Page 13: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/13.jpg)
Florida Department of Transportation
Partial Continuous Flow Intersection N
![Page 14: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/14.jpg)
Florida Department of Transportation
Initial Plans (30%)March 2019
Constructability Review(60%)Feb 2020
Biddability Preparation(90%)April 2021
Plans CompleteNov 2021
Bid OpeningMarch 2022
Construction Phase beginsAugust 2022
Project Status/ScheduleSR 710 – Beeline Highway
• Design-Bid-Build Project• Current Estimate $117 Million• FDOT PM Donovan Pessoa
![Page 15: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/15.jpg)
Florida Department of TransportationFlorida Department of Transportation
SR A1A North Bridge Over ICWWLocation Map
15
SR A1A North Causeway Bridge
15
![Page 16: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/16.jpg)
Florida Department of TransportationFlorida Department of Transportation
Channel Vertical ClearanceSR A1A North Bridge Over ICWW
New SR A1A Bridge length: 4152.5 ft
85 ft Channel Clearance
Replacement of structurally and functionally deficient bridge
85 ft
125 ft
85 ft
125 ft
25 ft
90 ft
85 ft
![Page 17: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/17.jpg)
Florida Department of Transportation
• Roadway Reconstruction • Juanita Ave Extension – 520 ft. – New Construction• Marina Access Rd. – 560 ft. – New Construction • Old Dixie Hwy – 2000 ft. – Reconstruction• Sunny Lane – 500 ft. – New Construction• Pedestrian Ramp for East Coast Greenway – 800 ft. – New Construction
• Lighting, Mast Arm Signalization, Drainage, and Railroad Crossing Gates
SR A1A North Bridge Over ICWW
![Page 18: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/18.jpg)
Florida Department of TransportationFlorida Department of Transportation
SR A1A North Bridge Over ICWW
18
Observation Deck
Observation Deck Path
East CoastGreenway
Ramp
SR A1A Bridge
Indian River Lagoon
![Page 19: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/19.jpg)
Florida Department of TransportationFlorida Department of Transportation
SR A1A North Bridge Over ICWW
Observation DeckEast CoastGreenwayRamp
SR A1A Bridge
Indian River Lagoon
![Page 20: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/20.jpg)
Florida Department of TransportationFlorida Department of Transportation
Project Status/ScheduleSR A1A North Bridge
Initial Plans (30% Complete)
March 2018
Biddability Submittal (90%
Complete)January 2021
Construction Complete
2026
Constructability Submittal (60%
Complete)May 2020
Plans CompleteJune 2021
Letting (Bid Opening)
October 27, 2021
Construction Begins
January 2022
• Design Bid Build Project• Current Cost Estimate: $79 Million• FDOT PM Donovan Pessoa, PE• Website: www.SRA1ANorthBridge.com
![Page 21: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/21.jpg)
Florida Department of TransportationFlorida Department of Transportation
Project LocationSW 10th Street Connector
869
T O L L
Regional Linkage Need
Limited Access Highway System
Hillsboro Blvd
SW 10th Street Connector PD&E
Study
I-95 PD&E Study
Sawgrass / Turnpike InterchangePD&E Study Po
wer
line
Rd
PD&E Project FPIDs and Limits
FPID # 437153-1 – Sawgrass / Turnpike Interchange Study
FPID # 439891-1 – SW 10th Street
FPID # 436964-2 – I-95 from SW 10th
Street to Hillsboro Blvd
![Page 22: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/22.jpg)
Florida Department of TransportationFlorida Department of Transportation
Connections to I-95SW 10th Street Connector
I-95 General Use Lanes
845
SW 10th St.
SW 12
thAv
e.
WB Sawgrass Expressway
EB Sawgrass Expressway
Powe
rline R
d.
LEGENDConnector LanesLocal/General Use LanesI-95 Express Lanes
Florid
a’s Tu
rnpik
e
Newport Center
Connector Lanes
Local SW 10th Street
I-95 Express Lanes
EB Egress
WB Ingress
EB IngressWB Egress
Two Alternatives:One with Ramps
One without Ramps, serving Powerline Road
EB Connector to BothI-95 General Use and
Express Lanes NB and SB
Both I-95 General Use and Express Lanes NB and SB
to WB Connector
![Page 23: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/23.jpg)
Florida Department of TransportationFlorida Department of Transportation
I-95/SW 10th St Connector – Direct ConnectionsSW 10th Street Connector
![Page 24: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/24.jpg)
Florida Department of TransportationFlorida Department of Transportation
Program Delivery ApproachSW 10th Street Connector
![Page 25: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/25.jpg)
Florida Department of TransportationFlorida Department of Transportation
Program Delivery ApproachSW 10th Street Connector
![Page 26: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/26.jpg)
Florida Department of TransportationFlorida Department of Transportation
TSM&O 7-Corridors Smart Work Zone/ATMSSW 10th Street Connector
![Page 27: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/27.jpg)
Florida Department of TransportationFlorida Department of Transportation
Rendering Comparison – SW 10th StreetSW 10th Street Connector
![Page 28: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/28.jpg)
Florida Department of TransportationFlorida Department of Transportation
Project Status/ScheduleSW 10th Street Connector
• Design-Build Projects• Current Estimate $821 Million (all five projects)• FDOT PM Vanita Saini, PE• Website: www.SW10Street.com
PD&E StudyComplete –Fall 2021
I-95/SW 10th StInterchangeAdvertisement –Summer 2022
I-95/SW 10th StInterchangeLetting –Summer 2023
I-95/SW 10th StInterchangeBegin Construction –Spring 2024
Smart WorkZone EndConstruction –Summer 2025
Smart WorkZone ProjectAdvertisement –Spring 2022
Smart WorkZone Letting –Winter 2023
SW 10th StConnectorAdvertisement –Fall 2023
SW 10th StConnectorLetting –Summer 2024
![Page 29: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/29.jpg)
Florida Department of TransportationFlorida Department of Transportation
SW 10th Street Video
![Page 30: FDOT District Four Major Projects](https://reader030.vdocument.in/reader030/viewer/2022040822/624dd5b8ecaf61155f5ba2b8/html5/thumbnails/30.jpg)
Florida Department of Transportation