Download - Final year project
FINAL YEAR PROJECT
MARINE ENGINEERING
DONE BY: MOHD KADAPPI BIN BIN MOHD SAPIE
DIP 1 MRE A 2012/2013
CONTENT
INTRODUCTION
AIM & OBJECTIVE
CONCEPT
MATERIAL
MANAGEMENT
CONCLUSION
INTRODUCTION
• WHY??
- Easy for instructor to explain more details and clearly by using the model.
AIM & OBJECTIVE
AIM
TO DEVELOP AN UNDERSTANDING THE FUNCTION OF STEERING GEAR
TO KNOW THE OPERATION OF STEERING GEAR
TO ENSURE THIS PROJECT OPERATE SUCCESSFULLY
DESIGN
• MADE FROM- PERSPEX
- VISIBLE HOSE
• FOCUS ON 3 PLACES
- MONITOR
- CONTROL ROOM
- ACTUAL PLACE
(RUDDER)
MATERIAL
ALUMINIUM ROD
PVC PIPE
‘O’ RING
OIL SEAL
MATERIAL
VISIBLE HOSE PERSPEX
FUEL PUMPWIRE
BATTERY
MANAGEMENT
• TIME: 3 MONTHS- (FIRST 1 MONTH & HALF-DO THE PROJECT)
- (LAST 1 MONTH & A HALF-RECHECK IF IT IS
WORKING OR NOT)
• WORKFORCE- ( 5 PEOPLE)
• COST- ( MORE OR LESS THAN $100)
CONCLUSION
• IF THIS PROJECT SUCCEED, IT CAN BEUSE AS REFERENCE AND GUIDE FOR THENEXT GENERATION IN TERMS OFUNDERSTANDING THIS TOPIC.