Fire Protection SystemInspection and Test
อั�งกุ�ศ รุ่� �งแสงจั�นทรุ่�
![Page 2: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/2.jpg)
Fire Protection Systems
• มี�โอักุาสใช้�งานน�อัย• จัะต้�อังใช้�งานได้�เมี��อัต้�อังใช้�งาน
• ผู้��อัอักุแบบ จัะต้�อัง อัอักุแบบรุ่ะบบท��ใช้�งานได้�
เท�าน�!น• รุ่ะบบจัะต้�อังต้รุ่วจัสอับและทด้สอับได้�
![Page 3: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/3.jpg)
Inspection and Test
• Inspection• Test– Periodic Test– Acceptance Test
![Page 4: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/4.jpg)
Fire Protection Systems
• Sprinkler• Water Spray• Clean Agent
![Page 5: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/5.jpg)
Sprinkler System
• Wet pipe• Preaction– Single Interlock– Double Interlock
![Page 6: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/6.jpg)
Sprinkler System
• ปกุต้%ไมี�มี�กุารุ่ไหลในท�อั• ไมี�มี�กุารุ่ท'างานในแบบ
Manual
![Page 7: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/7.jpg)
Automatic Sprinkler
• Listed spray pattern• Sensitive to obstruction
![Page 8: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/8.jpg)
Automatic Sprinkler
• Listed temperature rating
• Listed discharge coefficient
![Page 9: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/9.jpg)
Wet Pipe
• Continuously charged• Immediate discharge
![Page 10: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/10.jpg)
Preaction
• Continuously monitored by compressed air
• Require fire detection system
![Page 11: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/11.jpg)
Single Interlock
• Water charge in system piping upon operation of alarm device
![Page 12: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/12.jpg)
Double Interlock
• Water charge in system piping upon operation of alarm device and sprinkler opening
![Page 13: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/13.jpg)
Preaction sprinkler
• Upright sprinkler• Dry sprinkler• Pendent sprinkler in
return bends and branch lines are above 4C
• Horizontal sidewall sprinkler installed so that water is not trapped
![Page 14: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/14.jpg)
Required Information
• As-Built drawings• AHJ additional
requirements• Calculation sheets• Data sheets• User Manual• Maintenance Manual
![Page 15: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/15.jpg)
Inspection
• Occupancy classification
• Protected area• Discharge area• System demand• Flow at most
remote sprinkler
• Flow at system riser
![Page 16: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/16.jpg)
Inspection
• Location and quantity of equipments
• Pipe size and routing
• Sprinkler obstructions– Pattern
development obstruction
– Water distribution obstruction
![Page 17: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/17.jpg)
Inspection
Sprinkler obstructions• Pattern development• Water distribution
![Page 18: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/18.jpg)
Sprinkler obstruction
![Page 19: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/19.jpg)
Sprinkler obstruction
![Page 20: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/20.jpg)
Sprinkler obstruction
![Page 21: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/21.jpg)
Hydrostatic test• 200 psi (13.8
bar) without loss for 2 hours
• Test pressure shall be read from a gauge located at the low elevation point of the system
![Page 22: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/22.jpg)
Air test (Preaction)
• 40 psi (2.8 bar) with less than 1-1/2 psi (0.1 bar) in 24 hours
![Page 23: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/23.jpg)
Operational test• Open Inspector’s test
connection• Alarm expected
within 5 minutesPreaction• Activate alarm device• Open Inspector’s test
connection• Water discharge
expected within 1 minute
![Page 24: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/24.jpg)
Operational test
• Open main drain valve and leave open until pressure stabilized
• Close and open each control valves under system water pressure
• Open and flow test all pressure reducing valve
![Page 25: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/25.jpg)
Water Spray System
• Open nozzle• Normally empty pipe
![Page 26: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/26.jpg)
Water Spray Nozzle
• Predetermined pattern• Sensitive to wind draft
![Page 27: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/27.jpg)
Required Information
• As-Built drawings• AHJ additional
requirements• Calculation sheets• Data sheets• User Manual• Maintenance Manual
![Page 28: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/28.jpg)
Inspection
• Protected hazard• Design density• Protected area• System demand
![Page 29: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/29.jpg)
Inspection
• Location and quantity of equipments
• Nozzle pattern and location
• Pipe size and routing
![Page 30: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/30.jpg)
Hydrostatic test
• 200 psi (13.8 bar) without loss for 2 hours
• Test pressure shall be read from a gauge located at the low elevation point of the system
![Page 31: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/31.jpg)
Operational test
• Test system actuation as per manufacturer’s manual
• Discharge test (Automatic, Manual, Emergency)
![Page 32: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/32.jpg)
Clean Agent System
• Carbon Dioxide• Inert Gases• Synthetic Gases
![Page 33: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/33.jpg)
Clean Agent System
• Normally empty pipe• 10 seconds – 60
seconds discharge• Require Automatic
detection and control
![Page 34: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/34.jpg)
Carbon Dioxide
• Stored in liquid or superheated gas state
• No pressure gauge• Quantity check only by
weighing• Flow in two phases• Very low temperature
discharge• Nominal 60 seconds
discharge
![Page 35: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/35.jpg)
Inert Gas
• Stored in high pressure compressed gas state
• Pressure gauge represent gas quantity
• Flow in gas state• Nominal 60 seconds
discharge
![Page 36: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/36.jpg)
Synthetic Gas
• Stored in liquid state under Nitrogen propellant
• Pressure gauge represent propellant quantity
• Weighing or liquid level measuring for agent quantity
• Discharge within 10 seconds to prevent decomposition products
![Page 37: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/37.jpg)
Required Information
• As-Built drawings• AHJ additional
requirements• Calculation sheets• Data sheets• User Manual• Maintenance Manual
![Page 38: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/38.jpg)
Inspection
• Protected hazard
• Design concentration
• Protected volume
• System demand
• Discharge duration
• Operation sequence
![Page 39: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/39.jpg)
Inspection• Location and
quantity of equipments
• Cylinder fills• Propellant pressure
level (if available)• Cylinders are secured
as per the design• Nozzle pattern and
location• Pipe size and routing• Protected area
dimensions
![Page 40: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/40.jpg)
Inspection• Location of control panel• Location of field devices• Location of interface
control panel• Location of field devices• Wiring gauge and
conduit size• Dedicated power source• Standby power source or
integral battery
![Page 41: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/41.jpg)
Inspection
Carbon Dioxide• Lock out valve MUST be
provided in each protected volume
• NO Abort switch
Inert and Synthetic Gas• Maintenance lockout
switch shall be provided• Abort switch shall be
provided
![Page 42: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/42.jpg)
Hydrostatic test
Carbon dioxide• Not required
Inert or Synthetic Gas• 40 psi (2.7 bar) with no
more than 20% for 10 minute
![Page 43: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/43.jpg)
Discharge test (Carbon Dioxide)
• Oxygen sensor with data logger
• Less than 10% Oxygen concentration
• 10 minute retention time
![Page 44: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/44.jpg)
Room integrity test• Maximum
protected height
• Retention period
![Page 45: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/45.jpg)
Operational test
• Notify all concerning parties
• Disarm the system
![Page 46: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/46.jpg)
Operational test• Alarm device and
alarm response• Automatic actuation
sequence• Abort function• Manual actuation• Emergency
actuation• Main/Reserve
changeover• Supervisory devices• Interface
verifications
![Page 47: Fire protection system, inspection and test](https://reader033.vdocument.in/reader033/viewer/2022061115/5464b036af7959f22f8b7e07/html5/thumbnails/47.jpg)
Operational test
Trouble supervision• Initiating circuits• Indication
circuits• Release circuits• Main power
supply• Standby power
supply