![Page 1: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/1.jpg)
MODULAR INTEGRATED CONSTRUCTION
![Page 2: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/2.jpg)
SCOPES
• Fire Service Installations
Requirements
• Fire Service Installations
Acceptance Inspection
![Page 3: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/3.jpg)
Productivity Improvement
Reduction of On-site Manpower
Better Construction Environment
Better Quality Control
Benefits of
MiC
![Page 4: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/4.jpg)
10-STOREY HOTEL BUILDING
![Page 5: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/5.jpg)
4.28 Hotels — high rise
1) Audio/visual advisory system
2) Automatic actuating devices
3) Automatic fixed installation other than water
4) Emergency generator
5) Emergency lighting
6) Exit sign
7) Fire alarm system
8) Fire control centre
9) Fire detection system
10) Fire hydrant/hose reel system
11) Fireman‘s lift
12) Portable hand-operated approved appliance
13) Pressurization of staircase
14) Sprinkler system
15) Static or dynamic smoke extraction system
16) Ventilation/air conditioning control system
FIRE SERVICE INSTALLATIONS AND EQUIPMENT
![Page 6: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/6.jpg)
FSI ACCEPTANCE INSPECTION
• The arrangement of FSI compliance inspection for MiC
projects is the same as conventional buildings
• FSIC has responsibility to ensure the efficient working
order of FSI, regardless of the building method
• FSD encourages FSIC to monitor, test and audit any
FSI work in off-site factories
• FSIC is required to ensure the quality and functionality
of the FSI delivered to the building site prior to
installation
• Guidance Notes on MiC projects involving FSI will be
issued
![Page 7: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/7.jpg)
WORKFLOW FOR FSI ACCEPTANCE INSPECTION
FSI/314
FSI/501
Initial Inspection within 15
working days
On-site
Acceptance
Inspection
Any defects?
Issue FS 172 or
Acceptance
Letter/Memo
Issue defect list
(FSI/507B)
Yes No
Re-inspect
Full compliance with
Fire Services
requirements
Pre-inspection
Meeting
(If necessary)
Document checking
![Page 8: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/8.jpg)
FSD CIRCULAR LETTER NO. 1/2015
• Form FSI/501 - Application Form
• Form FSI/314 with two sets of as-fitted FSI layout
plans
• Testing and Commissioning (T&C) Checklists
• FSIs Equipment List
1. Listing certificates/ records/ documents/ printouts
from product certification bodies;
2. FSD approval/ acceptance letters;
3. Test certificates/ data sheets/ catalogues/
calculations; and
4. Other necessary technical information.
![Page 9: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/9.jpg)
IMPORTANT DOCUMENT/
INFORMATION REQUIRED FOR INSPECTION
• Approved General Building Plans
• Approved Smoke Control Submission
(Form FSI/314)
• Approval for Fire Engineering Report
(if applicable)
![Page 10: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/10.jpg)
IMPORTANT DOCUMENT/
INFORMATION REQUIRED FOR INSPECTION
• Approval for Non-provision/exemptions of FSI
(if applicable)
• Approval for Non-FSI Load Connection (if
applicable)
• Approval/License for DG Store (Fuel Tank
Room)
• Approval for method statement of FSIs (e.g.
• Extended coverage sidewall sprinkler, long
throw sprinkler, hot smoke test, etc.)
![Page 11: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/11.jpg)
FSD CONNECTS WITH THE CONSTRUCTION INDUSTRY EXPERIENCE
SHARING ON ACCEPTANCE INSPECTION OF FSI
• FSD Home Page > Fire Protection > Licensing and
Certification
• 2017.11.24
https://www.hkfsd.gov.hk/eng/source/licensing/Conn
ects_Construction_Industry_Building_Plan_Acceptanc
e_Inspection_FSI.pdf
• 2018.06.25
https://www.hkfsd.gov.hk/eng/source/licensing/Conn
ects_Construction_Industry_Building_Plan_Acceptanc
e_Inspection_FSI_20180625.pdf
![Page 12: Fire Service Installations Requirements Acceptance Inspectioncic.hk/files/page/10307/20181106_1540_FS.pdf2018/11/06 · FSD CIRCULAR LETTER NO. 1/2015 • Form FSI/501 - Application](https://reader036.vdocument.in/reader036/viewer/2022071115/5ffaec97c219dc52673a9656/html5/thumbnails/12.jpg)
For further clarification, please contact:
• Mr. LEE Kin-chungDivisional Officer (New Projects)3Tel.: 3971 4601