kiddermathews.comThis information supplied herein is from sources we deem reliable. It is provided without any representation, warranty or guarantee, expressed or implied as to its accuracy. Prospective Buyer or Tenant should conduct an independent investigation and verification of all matters deemed to be material, including, but not limited to, statements of income and expenses. Consult your attorney, accountant, or other professional advisor.
For LeaseHeart of the Pearl
914 NW Everett Street Portland, OR
Location ContactRetail-showroom-restaurant
±5,400 SF is $26.50/SF NNN
Plus outdoor pocket park ±2,400
SF is $12.00/SF NNN
NNN’s ±$4.00 SF
Zoned EXD
Rare one level Pearl District
Building with open floor plan
Built in 1917
Classic brick and timber
construction with exposed
beam ceiling with Skylights
Caryl [email protected]
NW Hoyt St
NW Lovejoy St
NW
Bro
adw
ay
NW Glisan St
W Burnside St
NW Everett St
NW Davis St
NW Couch St
NW Irving St
NW Kearney St
NW
9th Ave
NW
11th Ave
PEARLDISTRICT
For Lease
Caryl [email protected]
SITE
PEARL DISTRICT
BROADWAY BRIDGE
STEEL BRIDGE BURNSIDE
BRIDGE
W Burnside St
W Burnside St
HEART OF THE PEARL
DEMOGRAPHICS
.5 mile 1 mile 2 miles
Population 11,624 35,046 80,077
Total Employees (daytime employment)
47,076 115,959 214,961
Average Income $52,990 $56,103 $69,904
Education (some college+)
22.1% 21.2% 20.3%
Contact
Aerial
kiddermathews.comThis information supplied herein is from sources we deem reliable. It is provided without any representation, warranty or guarantee, expressed or implied as to its accuracy. Prospective Buyer or Tenant should conduct an independent investigation and verification of all matters deemed to be material, including, but not limited to, statements of income and expenses. Consult your attorney, accountant, or other professional advisor.
For LeaseSite Plan
New HVAC to be combined with existing units
600 AMP, 3 phase power
In ground plumbing, to suit Tenant
Two 75 gallon grease traps
2 ADA and 1 GN ADA restroom in common exit
New concrete floor
Fully sprinklered and seismic completed 2016
Building permit in hand for restaurant/night club
Premises
222 NW 10th
Otis Elevator Building
Halo Shoes
Urban StudioCuRate
Bella Casa
Yoga Pearl
Christopher David
For Lease
Gallery 903
Gallery 903 903 NW Davis
Yoga Pearl 925 NW Davis
Urban Studio935 NW Davis
NW 10th Ave
NW 9th Ave
NW
Davis S
t
NW
Everett
Otis Elevator Building230 NW 10th
Halo Shoes938 NW Everett
228 NW10th
Pocket Park
222 NW10th
Bella Casa 223 NW 9th
For Lease914 NW Everett±5,400 SF
CuRate
Christopher David901 NW Davis
N
Construction