Transcript
Page 1: Framework Master Plan - Northstowe · 0 50 100 200 300 400 500m 1;5,000 0 50 100 200 300 400 500m Northstowe 1;5,000 Gallagher & Homes and Framework Master Plan Communities Agency

0 100 200 300 400 500m50

1;5,000

0 100 200 300 400 500m50

1;5,000Northstowe

Framework Master PlanGallagher & Homes and Communities Agency

Links to A14

Wildlife habitat corridor

Town centre

Greenways

Linear park / water park

Primary street

Green buffer

Secondary school

Primary school

Local centre

Sports hub / community building

PS

PS

PS

PS

SS

PS

PS

PS

Cambridgeshire Guided Busway

Development areas

Employment

Movement network of primary and secondary streets

Town centre & local centres

Secondary school site

Primary school sites

Sports hubs

Existing settlements

Green infrastructure, exsiting and proposed key vegetation, greenways, green buffer & linear park

Strategic footpath / cycle links to neighbourhoods

Attenuation ponds (additional ponds north of the A14)

Potentially retained buildings in old barracks area

Existing trees within former barracks area

Allotments

Listed pillboxes

Bus stops on dedicated busway

SS

PS

KEY:

Town centre catchment

Local centre catchment

Top Related