FUTURE DIRECTIONS OFRADON AND TRITIUM
MONITORING
Diablo Canyon Nuclear Power Plant
![Page 2: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/2.jpg)
James T. (Tom) Voss, NRRPT, CHP
Fellow of the Health Physics Society
PO Box 1362
Los Alamos, NM 87544
505-920-1470
WWW.VOSS-ASSOCIATES.COM
![Page 3: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/3.jpg)
What are the Current Applicationsfor Radon and Tritium Monitoring
• Current Nuclear Power Reactors• Current Research and Test Reactors• New Nuclear Power Reactors• Small Transportable Nuclear Reactors
![Page 4: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/4.jpg)
What are the Current Applicationsfor Radon and Tritium Monitoring
• International Thermonuclear Experimental
Reactor (ITER)• DOE Operations • Medical • Resurgence in Uranium Mining
![Page 5: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/5.jpg)
What are the Current Applicationsfor Radon and Tritium Monitoring
• Uranium Fuel Fabrication• Thorium as a Reactor Fuel• Nuclear Fuel Reprocessing• Need for Remote Real-time Monitoring of
Nuclear Facilities
![Page 6: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/6.jpg)
Current Nuclear Power Reactors
![Page 7: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/7.jpg)
Current Research and Test Reactors
![Page 8: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/8.jpg)
New Nuclear Power Reactors
![Page 9: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/9.jpg)
Applications for License Renewal
Calvert Cliffs, Units 1 and 2Oconee Nuclear Station, Units 1, 2 and 3Arkansas Nuclear One, Unit 1Edwin I. Hatch Nuclear Plant, Units 1 and 2 Turkey Point Nuclear Plant, Units 3 and 4North Anna, Units 1 and 2, and Surry, Units 1 and 2Peach Bottom, Units 2 and 3St. Lucie, Units 1 and 2Fort Calhoun Station, Unit 1McGuire, Units 1 and 2, and Catawba, Units 1 and 2H.B. Robinson Nuclear Plant, Unit 2
![Page 10: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/10.jpg)
Applications for License Renewal
R.E. Ginna Nuclear Power Plant, Unit 1V.C. Summer Nuclear Station, Unit 1 Dresden, Units 2 and 3, and Quad Cities, Units 1 & 2Farley, Units 1 and 2Arkansas Nuclear One, Unit 2D.C. Cook, Units 1 and 2Millstone, Units 2 and 3Point Beach, Units 1 and 2Browns Ferry, Units 1, 2, and 3Brunswick, Units 1 and 2Nine Mile Point, Units 1 and 2
![Page 11: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/11.jpg)
Applications for License Renewal
MonticelloPalisadesJames A. FitzPatrickWolf Creek, Unit 1Harris, Unit 1Oyster CreekVogtle, Units 1 and 2Three Mile Island, Unit 1Beaver Valley, Units 1 and 2Susquehanna, Units 1 and 2
59 APPLICATIONS FOR LICENSE RENEWAL HAVE BEEN ACCEPTED
![Page 12: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/12.jpg)
Applications Currently Under Review
Pilgrim 1, Unit 1Vermont YankeeIndian Point, Units 2 and 3Prairie Island, Units 1 and 2Kewaunee Power StationCooper Nuclear StationDuane Arnold Energy Center
![Page 13: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/13.jpg)
Applications Currently Under Review
Palo Verde, Units 1, 2, and 3Crystal River, Unit 3Hope CreekSalem, Units 1 and 2Diablo Canyon, Units 1 and 2Columbia Generating Station
19 APPLICATIONS FOR LICENSE RENEWAL ARE UNDER REVIEW
![Page 14: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/14.jpg)
Radon and Tritium Monitoring in Nuclear Reactor Facilities
Radon monitoring is performed to;• alert personnel to the potential for personal contamination due to radon• alert personnel to the potential for degradation in the performance of alpha CAMs• alert personnel to unacceptably high levels of radon in the facility
![Page 15: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/15.jpg)
Radon and Tritium Monitoring in Nuclear Reactor Facilities
Tritium monitoring is performed to;• alert personnel to the potential for inhalation of tritium• alert personnel to the potential malfunction of plant liquid process equipment
![Page 16: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/16.jpg)
Radon and Tritium Monitoring Outside Nuclear Reactor Facilities
Radon monitoring is performed to establish environmental background levels of alpha and beta emitters in the ambient air.
![Page 17: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/17.jpg)
Radon and Tritium Monitoring Outside Nuclear Reactor Facilities
Tritium monitoring is performed to;• establish a baseline level of tritium in the ambient air and water outside the facility boundary• alert personnel to the potential malfunction of plant liquid process equipment
![Page 18: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/18.jpg)
Special Applications for Tritium Monitors Inside Nuclear Reactor Facilities
Simultaneous and separate monitoring of elemental tritium and tritium oxide can be used to identify the presence of leaks in the hydrogen recombiner in the facility. Elemental tritium will only exist for a short period of time before it either combines with an oxygen atom or it replaces a hydrogen atom on a water molecule.
![Page 19: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/19.jpg)
Special Applications For Tritium Monitors For The ITER Project
ITER will require a lot of tritium to start. This leads to the need for tritium monitors inside the facility, around its perimeter, and at those locations producing tritium for ITER. Tritium monitors with high working ranges will be needed for ITER in addition to conventional tritium monitors
ITER is scheduled to start producing power in 2018.
![Page 20: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/20.jpg)
Special Applications For Tritium Monitors For DOE
DOE is continuing with refurbishing the US nuclear arsenal. The tritium in those devices must be replaced about every 15 years. The gamma radiation from the device drives the need for tritium monitors with active gamma compensation.
![Page 21: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/21.jpg)
Special Applications For Tritium Monitors For DOE
DOE produces and maintains a supply of elemental tritium for our weapons program. Since the elemental tritium combines with oxygen readily there is a need to simultaneously monitor for elemental tritium and tritium oxide. The presence of elemental tritium outside its containment indicates that tritium is leaking from its containment.
![Page 22: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/22.jpg)
Small Transportable Nuclear Power Reactors
![Page 23: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/23.jpg)
What is in the future for these power reactors ?
It seem unlikely the NRC will grant operating licenses for these types of nuclear power reactors.
It seems unlikely the final cost for these types of nuclear power reactors could equal that of the new commercial nuclear power reactors.
Small Transportable Nuclear Power Reactors
![Page 24: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/24.jpg)
Resurgence in Uranium Mining
![Page 25: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/25.jpg)
Resurgence in Uranium Mining
The EPA estimates there will be 10,000 to 15,000 more uranium miners in the US by 2015.
The EPA is considering lowering the allowable radon exposures for uranium miners.
![Page 26: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/26.jpg)
World Uranium Production
Tons of Uranium2007 2008
Canada 9476 9000Kazakhstan 6637 8521Australia 8611 8430Namibia 2879 4366Russia 3413 3521Niger 3153 3032Uzbekistan 2320 2338USA 1654 1430 World total 41,282 43,853
![Page 27: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/27.jpg)
United States Uranium Production
Tons of Uranium
2007 2008 USA 1654 1430 World total 41,282 43,853
US Uranium Current Production is PrimarilyFrom 4 Mines.
90% of US Uranium Mining is In-Situ.
![Page 28: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/28.jpg)
Uranium Mines in Canada
![Page 29: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/29.jpg)
Uranium Mines in Australia
![Page 30: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/30.jpg)
Worker, Public, and Environmental Protection for Uranium Mining
• Controlled Ventilation
• Radon and Airborne Uranium Monitoring
• Portable and Personal Continuous Air Monitors
• In-Situ Mining
• Open Pit Mining
![Page 31: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/31.jpg)
Worker Protection for Uranium Mining
Radon and Airborne Uranium Monitoring
• Routine area radon and uranium monitoring with sophisticated instruments
• Radon monitoring before opening a new area to workers
• Personal radon and uranium monitors for workers
![Page 32: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/32.jpg)
Public and Environmental Protectionfor Uranium Mining
There is a need for a CAM for Continuously Monitoring for Airborne Alpha and Beta Activity at High Volumetric Sampling Rates.
![Page 33: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/33.jpg)
Public and Environmental Protectionfor Uranium Mining
In-Situ Mining
In-Situ mining leaches the uranium ore from the underground deposit and greatly reduces the volume of above ground waste.
![Page 34: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/34.jpg)
Public and Environmental Protectionfor Uranium Mining
Open Pit Mining
• Reduces the risk to the workers by providing better ventilation and reduces other risks in underground mining
• Exposes more rock dust and uranium ore that could increase the spread of those into the environment
• Australia’s Olympic Dam mine is converting to an open pit operation
![Page 35: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/35.jpg)
Public and Environmental Protectionfor Uranium Mining
Closing and covering an open pit mine at the end of its useful life could provide the best permanent solution for protecting the public and the environment.
In-Situ mining could also minimize the mine’s affect on the public and the environment.
![Page 36: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/36.jpg)
Uranium Fuel Cycle Facilities
![Page 37: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/37.jpg)
Uranium Fuel Cycle Facilities
Uranium Hexafluoride Production Honeywell International, Inc. Metropolis, IL
![Page 38: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/38.jpg)
Uranium Fuel Cycle Facilities
Gas Centrifuge Uranium Enrichment
Areva Enrichment Services Idaho Falls, ID(under review)
Louisiana Energy Services Eunice, NM(in construction)
U.S. Enrichment Corporation Piketon, OH(in construction)
![Page 39: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/39.jpg)
Uranium Fuel Cycle Facilities
Gaseous Diffusion Uranium Enrichment
U.S. Enrichment Corporation Paducah, KY
U.S. Enrichment Corporation Piketon, OH (cold standby)
![Page 40: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/40.jpg)
Uranium Fuel Cycle Facilities
Laser Separation Uranium Enrichment
GE-Hitachi Wilmington, NC (under review)
![Page 41: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/41.jpg)
Uranium Fuel Cycle Facilities Uranium Fuel Fabrication
AREVA NP, Inc. Lynchburg, VA
AREVA NP, Inc. Richland, WA
B&W Nuclear Operations Group Lynchburg, VA
Global Nuclear Fuel-Americas, LLC Wilmington, NC
Nuclear Fuel Services Erwin, TN (license renewal application submitted)
Westinghouse Electric Company, LLC Columbia, SC
![Page 42: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/42.jpg)
Uranium Fuel Cycle Facilities
Mixed-Oxide Fuel Fabrication
Shaw AREVA MOX Services , LLC Aiken, SC (in construction/under licensing review)
![Page 43: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/43.jpg)
Uranium Fuel Cycle Facilities
• Better Ventilation
• Radiation Monitoring
• Airborne Radioactivity Monitoring
• Criticality Monitoring
![Page 44: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/44.jpg)
Uranium Fuel Cycle Facilities
These Facilities need Radon and Airborne Radioactivity Monitoring.
Due to the presence of gamma radiation from the uranium the radon monitors need active gamma compensation.
![Page 45: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/45.jpg)
Nuclear Fuel Reprocessing
• Better Ventilation
• Radiation Monitoring
• Airborne Radioactivity Monitoring
• Criticality Monitoring
![Page 46: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/46.jpg)
Nuclear Fuel Reprocessing
The present US political position is to NOT reprocess nuclear fuel.
A small amount of plutonium and uranium are being used to produce MOX (mixed oxide fuel) but the output is small compared to the need.
![Page 47: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/47.jpg)
Thorium as a Nuclear FuelWorld Supplies in Tons
Australia 340,000 India 300,000 United States 300,000 Norway 180,000 Canada 100,000 South Africa 39,000 Brazil 18,000 Malaysia 4,500 Other Countries 100,000World Total 1,400,000
![Page 48: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/48.jpg)
Benefits of Thorium as a Nuclear Fuel
• Greater Abundance than Uranium
• Production of Thorium Fuel Does Not Require Isotopic Separation
• Use of Thorium Fuel Produces Much Less Long-Lived Transuranics Than Uranium Fuel
![Page 49: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/49.jpg)
Thorium Fueled Nuclear Power Reactors
Thorium reactors have been used for more than 40 years.
Shippingport Atomic Power Station commenced producing electrical power from its thorium-232, uranium-233 powered reactor in 1957 and was decommissioned in 1982.
![Page 50: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/50.jpg)
Thorium Fueled Nuclear Power Reactors
These nuclear power reactors will have the same radon and tritium monitoring needs as other nuclear power reactors do.
![Page 51: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/51.jpg)
Need For Remote Real-Time Radiological Monitoring of Nuclear Facilities
• Notification of an Unplanned Release
• Identification and Quantification of Unplanned Releases
• Tracking of Unplanned Releases to the Environment
• Prediction of the Path of Unplanned Releases
![Page 52: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/52.jpg)
Radon Potential Map of the US
![Page 53: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/53.jpg)
Surface Uranium Deposits
![Page 54: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/54.jpg)
Surface Thorium Deposits
![Page 55: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/55.jpg)
Some Unplanned Releases from Nuclear Facilities
Three Mile Island - 1979Contributing Factors
• Facility Design
• Equipment Malfunction
• Operator Training
![Page 56: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/56.jpg)
Some Unplanned Releases from Nuclear Facilities
Chernobyl - 1986Contributing Factors
• Facility Design
• Equipment Malfunction
• Operator Training
![Page 57: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/57.jpg)
Some Unplanned Releases from Nuclear Facilities
Japan, Tokaimura - 1999Contributing Factors
• Facility Design
• Operator Training
![Page 58: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/58.jpg)
Some Unplanned Releases from Nuclear Facilities
Practices to Prevent and/orMitigate the Consequences
• Better Facility Designs
• Better Equipment Designs
• Better Operator Training
• Better Radiological Monitoring Inside and Outside the Facilities
![Page 59: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/59.jpg)
Summary
Portable, Stationary, High Sampling Rate, and Energy Compensated Radon Monitors are needed.
Portable, Stationary, Elemental vs. Oxide, and Energy Compensated Tritium in Air Monitors are needed.
Stationary Tritium in Water Monitors are needed.
![Page 60: FUTURE DIRECTIONS OF RADON AND TRITIUM MONITORING Diablo Canyon Nuclear Power Plant](https://reader036.vdocument.in/reader036/viewer/2022081516/56649b47550346318e8be293/html5/thumbnails/60.jpg)
References
American Nuclear Society www.ans.orgHealth Physics Society www.hps.orgInstitute of Nuclear Power Operations
www.inpo.infoNuclear Energy Institute www.nei.org US Department Of Energy www.doe.govUS Nuclear Regulatory Commission
www.nrc.org