![Page 1: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/1.jpg)
1G070515-00-M
Advanced LIGO UpdateDavid Shoemaker
LSC/Virgo MIT July 2007
![Page 2: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/2.jpg)
2G070515-00-M
101
102
103
104
10-25
10-24
10-23
10-22
Frequency (Hz)
h(f)
/ H
z1/2
Stochastic,BHBH
NSNS
Burst
Pulsar
SuspensionSubstrate
Coating
Quantum
Gradient,Gas
Advanced LIGO
Significant step forward:Review in June, 2007
‘Update baseline review’ Confirmation of cost, schedule Technical progress recounted Review committee content
“Overall the committee was confident that AdvLIGO was prepared to move into the construction phase”
….and now: a quick run through of progress highlights and active questions
![Page 3: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/3.jpg)
3G070515-00-M
Systems
Horizontal wedge chosen for Beamsplitter» Reduces coupling to vertical motion (seismic, or more importantly
thermal noise)» Allows use of steel fibers: simpler to design, assemble, install
Recycling Cavity Geometries (power & signal, stable vs marginally stable): on-going study» Simulations team completed development of the coupled cavity FFT code
and is using it to examine sensitivity of the stable geometry to radius of curvature tolerance, etc.
» Plan to have a decision by late August
![Page 4: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/4.jpg)
4G070515-00-M
HAM chamberSuspensions
Output mode cleaner suspension» One assembled, in test
» Modes, damping ok Recycling mirror suspension
» Detailed design underway Confirm using simple initial-LIGO
style SOS for auxiliary optics
Interferometry using AdL suspensions» A mode-cleaner triple facing a test
mass quad suspensions set up as 10m cavity
» Improved matching, better locking
» Trying out electrostatic actuator
![Page 5: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/5.jpg)
5G070515-00-M
Test Mass Suspensions
Controls quad suspension in detailed characterization» Looks good for basic design
UK has delivered ‘Noise’ quad» Suspension assembly started
» Maybe mounted to isolation system this week as ‘dead weight’ (masses locked) as a first testing step
Creation of installation ‘lab’ – welding, bonding, etc. – at LASTI
![Page 6: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/6.jpg)
6G070515-00-M
Test Mass (BSC) isolation system in clean assembly, ~50% complete» Several layers complete, to be integrated
» Sensors in pods
» Electronics/controls together
» Race to meet SUS Quad schedule
Design for baseline ‘stiff’ HAM isolation deep into fabrication» Prototype test of low-natural-resonant-
frequency system carried out
» Confirmed use of high gain servo, high natural frequency system for Advanced LIGO
» Race to meet both ELI and AdL schedules
» Start first assembly in September (at Vendor)
Seismic Isolation
![Page 7: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/7.jpg)
7G070515-00-M
Core Optics/Coatings
Full sized Optic for integration testing» Coated by LMA; now being characterized» Looks like a good, low-loss coating
To be joined to the UKsoon to the quad suspension,installed at LASTI on theBSC Seismic Isolation
CSIRO developing metrology to support pathfinder polishing » Final polish of the pathfinder substrate will commence within the month
At CIT, improving metrology » can now be fairly certain that the roughness of the LIGO1 ETM03 is less than or equal
to .15 nm rms over the spatial frequency range ~.5 to 21/mm – better than thought Charging – meeting here after the L-V meeting Optimized-thickness coating made at LMA for Thermal Noise Ifo test Both Coaters – CSIRO and LMA Lyon – eager and available to play continuing role
![Page 8: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/8.jpg)
8G070515-00-M
Auxiliary Optics
Designs of suspended baffles» Needed to reduce motion
» Simple damping system
» Plans for a full-scale prototype, installation at LASTI Lots of other Stray Light Control design work going on Rai pulling together observations of scatter from end covers of 4km
arms» May need an additional baffle
![Page 9: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/9.jpg)
9G070515-00-M
Advanced LIGO Status, Trajectory
Appears as the one Major Facility ‘start’ in FY2008 in the Office of Management and Budget request, with the cost and schedule that we wanted
Senate and House appropriation committees include Advanced LIGO; still a couple of steps to go…then…
NSF Review in Fall after Congress allocates budget – one last check of situation (theirs and ours)
….Funding in ~October 2007… Start turning off ELI in 2010, start turning on AdL in 2013
![Page 10: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/10.jpg)
10G070515-00-M
Schedule
![Page 11: G070515-00-M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ec45503460f94bcf0ac/html5/thumbnails/11.jpg)
11G070515-00-M
Advanced LIGO
Good progress on designs and prototype tests R&D program picking up, in some nice measure due to ELI’s
near-term deadlines Need to take our dates for completion of development seriously,
because….
Advanced LIGO has an ever-better chance of seeing FY 2007 funding!