OBJECTIVES1. Identify the major components included in
the primary and secondary cycles.
2. Describe what is meant by the integrated control system.
3. Describe how reactor coolant temperature 3 esc be o eac o coo a e pe a u eand secondary system pressure change with load.
2
![Page 3: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/3.jpg)
General Description• Light-water PWR, dual-cycle plant.• Dual cycle keeps potentially radioactive
coolant separate from the main turbine, condenser, and other secondary plant components.
3
• Babcock & Wilcox reactors:ANO U-1Crystal River U-3Oconee 1, 2 & 3TMI U-1Davis-Besse
![Page 4: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/4.jpg)
Primary Cycle (1)
• Reactor, Two loops, Pressurizer (PZR).o Operating plants have 177 fuel assemblies.
TTC U-3 (i.e., WNP-1) is 205 FA plant.
Bellefonte is a 205 FA plant.
• Each loop consists of one hot leg one
4
Each loop consists of one hot leg, one OTSG, two cold legs, & two RCPs (1 per cold leg).o Operating plants are either raised loop or
lowered loop.
![Page 5: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/5.jpg)
Partial LayoutFig 1 1
5
Fig. 1-1
![Page 6: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/6.jpg)
Simplified PlantComposite Flow
6
Composite Flow DiagramFig. 1-2
![Page 7: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/7.jpg)
Primary Cycle (2)
• Once Through Steam Generator (OTSG)Hot RCS leaves vessel and enters top of OTSG.
Energy inside tubes transferred to secondary coolant to produce steam.
Flow splits into two cold legs at bottom of OTSG
7
Flow splits into two cold legs at bottom of OTSG.
One RCP per cold leg returns coolant to vessel.
![Page 8: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/8.jpg)
Secondary Cycle
• Steam cycle basically the same as any PWR.
• Feedwater is boiled & superheated as it picks up heat from RCS in OTSG.
• OTSG does not have moisture separators because steam is superheated
8
because steam is superheated.
• Steam flow is not measured.
• AFW (or EFW) has separate penetration.
![Page 9: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/9.jpg)
9
Simplified Secondary Plant
Fig. 1-3
![Page 10: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/10.jpg)
High Pressure Main Steam System
Fig. 1-3a
10
![Page 11: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/11.jpg)
Condensate SystemFig. 1-3b
![Page 12: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/12.jpg)
Feedwater SystemFig. 1-3c
12
![Page 13: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/13.jpg)
Tave and Steam Pressure Control
• Constant Tave 15% - 100% (601o F) [205 FA] maintained by the Integrated Control System (ICS).o 0% - 15% Tave is operator controlled (551 – 601)
13
o 177 FA plants:15% - 100% (Tave = 579o F) (DB - 582o F)
0% - 15% (Tave is 532 - 579o F) (DB – 532-582o F)
• Constant steam header pressure.o 1035 psia (205 FA) (~900 psia – 177 FA)
o Maintained constant by ICS.
![Page 14: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/14.jpg)
Basic Integrated Control System
Fig. 1-4
![Page 15: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/15.jpg)
Reactor Coolant and Steam
15
and Steam Temperature vs.
LoadFig. 1-5
![Page 16: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/16.jpg)
Integrated Control System (ICS)• Provides simultaneous control of:
Turbine load (MWe)
Turbine bypass valves & atmospheric dump valves.
Feedwater control valves
16
MFP speed
Control rod position
• Allows plant to automatically maneuver from 15% - 100%.
Up to 5% per min.
![Page 17: General Plant Description: Chapter 1.0 — B&W ... - nrc.gov · General Plant Description Chapter 1.0 B&W Cross Training Course 1 B&W Cross-Training Course R-326C](https://reader036.vdocument.in/reader036/viewer/2022062317/5c04348709d3f2183a8b5034/html5/thumbnails/17.jpg)
ICS
• Basic function is to match generated MWe w/ demanded MWe.
• Ensures that heat generation & heat removal are matched with appropriate parameter values
17
values.
• Many “adjusting” features:RCS can be operated with unequal loop flows.
OTSGs do not have moisture separation equipment and must superheat steam sufficiently.