![Page 1: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/1.jpg)
Geoflow GEO Control Panels
![Page 2: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/2.jpg)
●Wiring Diagrams
Follow the Slides
● Install Your Geoflow control Panel
● Enter Field Settings)
● Basic Troubleshooting
![Page 3: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/3.jpg)
Installing your Geoflow Control Panel
Step 1: Location, Location and Location…
● Easy to Access for installation & maintenance● Ground panel
![Page 4: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/4.jpg)
Step 2: Read your Documentation (instructions & Diagrams)
Installing your Geoflow Control Panel
![Page 5: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/5.jpg)
Instructor: GT
Installing your Geoflow Control Panel
![Page 6: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/6.jpg)
Step 3: Run your field wires and Identify them
Good Better
Color wire Numbered Wire
Installing your Geoflow Control Panel
![Page 7: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/7.jpg)
Installing your Geoflow Control Panel
![Page 8: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/8.jpg)
• Wire Sizing
Installing your Geoflow Control Panel
![Page 9: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/9.jpg)
• Wire Sizing
Installing your Geoflow Control Panel
![Page 10: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/10.jpg)
DATE AND TIME SCREEN IS HOME BASE
Enter Field Settings
![Page 11: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/11.jpg)
• Press “ >” (Right Arrow Key)
>>
Enter Field Settings
![Page 12: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/12.jpg)
>>
Field SettingsI = Input Screen
LOGO Input Screen Activation Condition1 = Low Water Alarm float Float up2 = Primary Timer on & off float Float up3 = Secondary Timer on & off float Float up4 = High Water Alarm float Float up
Inputs 1-9Inputs 10-19Inputs 20-24
ActivatedInput
![Page 13: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/13.jpg)
>>
LOGO Output Screen Conditions for Activation1 = Pump Pump is on2 = General alarm Alarm condition exists3 = Filter flush Filter flush valve is activated4 = Dripfield flush Dripfield flush valve is activated
Field SettingsQ = Output Screen
Output 1-9Output 10-16
If highlighted, Output isactivated
![Page 14: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/14.jpg)
• Everyone go back to home Base (<<,<<,)
Lets start Entering Field Data Press “ESC” (Escape)
Enter Field Settings
![Page 15: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/15.jpg)
Use the down key Select “Set Param” press “OK” to enter
Enter Field Settings
![Page 16: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/16.jpg)
To change settings press “ok” and use directional <> to navigateUse Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Primary Off Timer (Pump rest time between doses). Ta = Elapsed time for cycle currently in progress. Not programmable
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
Enter Field Settings
Primary off time varies for each drip site. Please check the design provided.
Off Time
![Page 17: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/17.jpg)
To change settings press “ok” and use directional <> to navigateUse Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Primary On Timer (Pump run time or Dose Time)Ta = Elapsed time for cycle currently in progress. Not programmable.
Enter Field Settings
Primary On time varies for each drip site. Please check the design provided.
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
On Time
![Page 18: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/18.jpg)
To change settings press “ok” and use directional < > to navigate Use Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Secondary/ Override Off Timer (Rest Time between Dose’s when 3rd float is up and timer is in override mode)
Ta = Elapsed time for cycle currently in progress. Not programmable
Enter Field Settings
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
Secondary Off time varies for each site. Usually half of Primary Rest Time
Off Time 2
![Page 19: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/19.jpg)
To change settings press “ok” and use directional <> to navigateUse Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Secondary/ Override On Timer (Dose Time when 3rd float is up and timer is in override mode)Elapsed time for cycle currently in progress. Not programmable
Enter Field Settings
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
Secondary On time varies for each drip site. If secondary off time is half of primary off time, then secondary on time is the same as primary on time
On Time 2
![Page 20: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/20.jpg)
To change settings press “ok” and use directional <> to navigateUse Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Filter Flush Time Settings (amount of time the filter will flush for)Ta = Elapsed time for cycle currently in progress. Not programmable
Enter Field Settings
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
Filter Flush
Usually set between 15 seconds and 1 minute
![Page 21: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/21.jpg)
Instructor: GT
To change settings press “ok” and use directional <> to navigateUse Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Pump Delay Time (Primary Float De-bounce timer)Ta = Elapsed time for cycle currently in progress. Not programmable
Enter Field Settings
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
Pump Delay
Usually not changed in field from factory setting
![Page 22: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/22.jpg)
To change settings press “ok” and use directional <> to navigate Use Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Drain Timer (Opens valves to drain system at the end of each cycle)Ta = Elapsed time for cycle currently in progress. Not programmable
Enter Field Settings
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
If system is not required to drain at the end of each dose, i.e. non-freezing conditions, then set to 1 second (00:01).
Drain Timer
![Page 23: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/23.jpg)
To change settings press “ok” and use directional <> to navigate Use Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
T = Field Flush Timer (Drip field flush)Ta = Elapsed time for cycle currently in progress. Not programmable
Enter Field Settings
NOTE01:55h = HH:MM01:55m = MM:SS01:55s = SS:1/10s
Field Flush
![Page 24: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/24.jpg)
To change settings press “ok” and use directional <> to navigate Use Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
On = Frequency of Cycles between FlushingCnt = Number of counts it has left to next flush
Enter Field Settings
Flush Cycle Counter
![Page 25: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/25.jpg)
To change settings press “ok” and use directional <> to navigate Use Up and Down to Increase and Decrease value.Press “ok” When desired changes are made.
Field Settings Completed Press “ESC”
On = Number of zones serviced by this controller so each zone is flushed. With a Geo1 the default is 1, but if using an index (hydraulic) valve, this number should be changed to reflect the number of zones after the index valve
Enter Field Settings
Zone Count
![Page 26: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/26.jpg)
Timers and Counter in Geoflow Controllers
Block Names Description Factory Time Block Default Range Type
Off Time Primary timer off 1 hr 55 min HH:MM Timer
On Time Primary timer on 5 min MM:SS Timer
Off Time 2 Secondary timer off 55 min HH:MM Timer
On Time 2 Secondary timer on 5 min MM:SS Timer
FltrFlsh Filter flush timer 15 sec MM:SS Timer
PmpDlyTm Pump off delay 5 sec MM:SS Timer
DrainTmr* System drain Timer 5 min MM:SS Timer
FlshTmr System flush timer 5 min MM:SS Timer
Flsh CT System flush counter 10 cycles Counter
Zone CT System zone counter 1 zone Counter
* Set to 00:01 (1 second) if there is no risk of freezing
![Page 27: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/27.jpg)
Entering Time & Date
Use the down key Select “Set..” press “OK” to enter
![Page 28: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/28.jpg)
Use the down key Select “Clock” press “OK” to enter
Entering Time & Date
![Page 29: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/29.jpg)
To change settings press “ok” and use directional <> to navigate Use Up and Down to Increase and Decrease value.Push right arrow to get to year.Press “ok” When desired changes are made.
Entering Time & Date
![Page 30: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/30.jpg)
Use the ESC to Return to the Main Menu
Entering Time & Date
![Page 31: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/31.jpg)
Field Settings Complete.
Use the “ESC” key Select To Exit Screen
![Page 32: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/32.jpg)
Basic Trouble Shooting
Tools OF the Trade
• Volt Meter with amp Probe and Ohms settings.• Wiring Diagram Of Panel• Jumper Wire• Input/Output Screen of your PLC• Set of eye balls
The above is the bailing wire and duct tape of Control Panels
![Page 33: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/33.jpg)
Basic Trouble Shooting
• Open Pump Chamber and compare Floats with PLC Inputs lights• Use HOA switches to determent if equipment is working• Use amp Probe to confirm Signals, Current & Amps on field Equipment•Check continuity Between I/O and Panel Components.
![Page 34: Geoflow GEO Control Panelsgeoflow.com/wp-content/uploads/2017/pdfs/Controller... · The above is the bailing wire and duct tape of Control Panels. Basic Trouble Shooting • Open](https://reader036.vdocument.in/reader036/viewer/2022062506/5fba0ec94338c30a2d460a94/html5/thumbnails/34.jpg)
Instructor: GT
• Use wiring Diagram to locate possibleCause
• Call For Technical Support• Turn off power for 10 Seconds• Whack it with your shoe…._____________________