Download - Gestamp renewables eng july 2015
GESTAMP RENEWABLES July 2015| 1
July 2015
GESTAMP RENEWABLES July 2015| 2
INDEX 1. Gestamp Renewables
2. Gestamp Solar
3. Gestamp Wind
4. Gestamp Biomass
GESTAMP RENEWABLES July 2015| 3
GESTAMPRENEWABLES
GESTAMP RENEWABLES July 2015| 4 GE
STA
MP
RE
NE
WA
BLE
S –
GLO
BA
L P
RE
SE
NC
E
Gestamp BiomassGestamp WindGestampSolar
GESTAMP RENEWABLES July 2015| 5
Design, engineering and manufacturing of industrial components
• Systems of precisely defined processes, including equipment, tools and control procedures.
• Lins design and stress calculation of them.
• Preparation of basic projects and legal approval.
• Design and calculation for metal structures.
Development
• Location of sites• Feasibility studies• Project definition• Management of permits and licenses• Financial and investment analysis
Construction
• Earth removal.• Design and manufacture of
structures. • Modules supply• Transport and assembly.• Wiring.• Negotiation with suppliers• Project legal approval
• Plant Operation.• Plant monitoring and
Maintenance.• Compiling of information for
investors about planned activity.
• Fuel management
Maintenance
GE
STA
MP
RE
NE
WA
BLE
S –
VA
LUE
CH
AIN
GESTAMP RENEWABLES July 2015| 6
GESTAMP
SOLAR
GESTAMP RENEWABLES July 2015| 7
Solar Plants
Roof top Projects
GE
STA
MP
SO
LAR
– L
INE
S O
F A
CT
IVIT
Y
Gestamp Solar has participated in more than 500 MW of photovoltaic installations, manufacturing and supplying steel structures
to support this capacity
Employs over 150 people.
Solutions for solar systems
GESTAMP RENEWABLES July 2015| 8 GE
STA
MP
SO
LAR
– L
INE
S O
F A
CT
IVIT
Y
... And 120MW projected, mostly on parking shelters. Gestamp solar has installed over 75W of PV electricity generation facilities of some of the most important automobile makers in the world.
+ 75 MW in large Roof Tops
1 Vehicle and material protection against
meteorological elements
2 Cost reduction in insurances
3 Infrastructure improvements
4 Ecological and green image
5 Availability of electricity
GESTAMP RENEWABLES July 2015| 9 GE
STA
MP
SO
LAR
– G
LOB
AL
PR
ES
EN
CE
GESTAMP RENEWABLES July 2015| 10 GE
STA
MP
SO
LAR
– E
VO
LUT
ION
477 mw
2011 2012 2013 2014
390 mw 514 mw 684 mw
GESTAMP RENEWABLES July 2015| 11
Development
• Location of sites• Feasibility studies• Project definition• Management of permits and licenses• Financial and investment analysis
Construction
• Earth removal.• Design and manufacture of
structures. • Modules supply• Transport and assembly.• Wiring.• Negotiation with suppliers• Project legal approval
• Plant Operation.• Plant monitoring and
Maintenance.• Compiling of information for
investors about planned activity.
• Fuel management
Maintenance
GE
STA
MP
SO
LAR
– V
ALU
E C
HA
IN
GESTAMP RENEWABLES July 2015| 12
GESTAMP
WIND
GESTAMP RENEWABLES July 2015| 13
Development Construction Maintenance
GE
STA
MP
WIN
D –
KE
Y T
O S
UC
CE
SS
Gestamp Wind’s mission is to develop, construct, and operate its own wind farms through out the world, with the goal of becoming a significant player in the Wind Energy sector over the next few years.
In order to achieve this, Gestamp Wind has to rely on the international platform and industrial capabilities of Corporación Gestamp as well as in a team of highly qualified and experienced professionals.
Gestamp Wind is composed by a work force with extensive experience in the renewable energy sector especially in developing wind energy in the international market.
Design
Construction
Operation & Maintenance
GESTAMP RENEWABLES July 2015| 14 GE
STA
MP
WIN
D –
VA
LUE
CH
AIN
ManagementTeam
IndustrialProjects
With a Track record Management Team of more than 3.500 MW of wind power development from greenfield until its commercial operation, Gestamp Wind is a specialist in wind farm projects in strategic markets.
Deep knowledge of target markets
Wide experience in corporate operations with success in fulfilling the expectations of generating more value for more than 2.450 MW acquired.
Control of all phases of the business value chain
Gestamp Wind & Gonvarri Steel Industries.
Annual production target of 1.750 wind towers in 2013 with plants in 10 countries.
Planned investment of 110 MM€ in 4 years.
Supported by the strengths of Corporación Gestamp and their market knowledge on wind energy.
Strategic positioning differential:
Development linked to local, social and economic impact on investment.
Relationship with WTG manufacturers, improving the supply agreements and offering opportunities for joint development.
GESTAMP RENEWABLES July 2015| 15 GE
STA
MP
WIN
D –
TO
TAL
MW
Gestamp Wind Commercial Offices
Countries with Gestamp Wind Projects
MW IN OPERATION
2013
548
450
MW IN OPERATION
2014
784 MW IN OPERATION
2015
GESTAMP RENEWABLES July 2015| 16 GE
STA
MP
WIN
D –
VA
LUE
CH
AIN
Developiment Construction Maintenance
Sale of Energy
Towers construction
GESTAMP RENEWABLES July 2015| 17
GESTAMPBIOMASSGESTAMP
BIOMASS
GESTAMP RENEWABLES July 2015| 18 GE
STA
MP
BIO
MA
SS
– M
W U
ND
ER
CO
NS
TR
UC
TIO
N
has. forest
40,000
2013
Toneladas
90,0002013
Biomass energy production
Biomass energy production
HIASAFirst Facility
10M€Invest
Saves+3M€/year
2013 has. forest
40,000
GESTAMP RENEWABLES July 2015| 19 GE
STA
MP
BIO
MA
SS
– A
CT
IVIT
Y
USANewco Energy Holding
(33%)
75 Mwe
Uruguay
50 Mwe
In operation projects
Under development projects
UK
15 MW
Over 100 Mwe under development
92 Mwe in operation
17 3317
17
SPAINBioelectric Garray
(90%)
17Mwe
201367 MW
Underdevelopment
GESTAMP RENEWABLES July 2015| 20 GE
STA
MP
BIO
MA
SS
– A
CT
IVIT
Y
20 Mwe Spain
75 MweBerlin
15 Mwe United Kindom
50 MweUruguay
Garray Plant
GESTAMP RENEWABLES July 2015| 21
July 2015