Final deliverable to provide pre-con and post-con GIS asset inventory
4 mile stretch of SR 836 for MDX improvements
Included as a sub to the design/build team
![Page 3: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/3.jpg)
MDX 5 Year Work Program
TIP• Planning• Capacity• ITS • ORT
CIP• Asset
Upgrades• No roads • No facilities
R&R• Maintenance• Emergency
repairs• Improvements
![Page 4: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/4.jpg)
MDX 5 Year Work Program Funding Priorities
MDX Systematic Safety Program
System Preservation
Mobility Improvements
• Reduce traffic crashes and injuries• Funds allocated to every MDX
project
• Preserve roadways and bridges• Annually funds renewal and
replacement projects
• Reduce congestion by adding capacity
• Increase capacity by expanding current network
• Funded after safety and system preservation projects
![Page 5: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/5.jpg)
![Page 6: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/6.jpg)
SR 836 Operational, Capacity & Interchange Improvements (83628)
![Page 7: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/7.jpg)
• ORT Conversion
• Exit/entrance conversions
• Divergent Diamond • Express bus service
“Connectivity, Technology, & Transit”
![Page 8: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/8.jpg)
Phase I
Our Role
Capture Collaboration
![Page 9: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/9.jpg)
Special Considerations
• Multiple Agency assets
• Environmental aspects
• Major E-W commuter route
![Page 10: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/10.jpg)
PROJECT COORDINATION
COLLABORATION
DATA MANAGEMENT
DATA EXPANSION
PROJECT DELIVERABLES
![Page 11: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/11.jpg)
Phase I• Laser scan completed April 2015• Construction started October 2015
Our Role
![Page 12: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/12.jpg)
Our Role
Phase I - Standard MDX attribute fields
• Unique ID• MDX Route ID• Mile Marker • Lat/Long
![Page 13: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/13.jpg)
Data Overview
Roadways & Ramps
![Page 14: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/14.jpg)
Data Overview
• Guardrails• Guardrail Type• Nodes• Beginning/End
attachment type
![Page 15: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/15.jpg)
Data Overview
• Walls• Wall Type, Height• Attenuators• Type
![Page 16: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/16.jpg)
Data Overview
• Fences/Gates• Height, Type
![Page 17: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/17.jpg)
Data OverviewFences/Gates
![Page 18: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/18.jpg)
Data Overview• Sign Supports/Panels
![Page 19: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/19.jpg)
Data Overview• Sign Supports/PanelsLighted
Linked & Listed
![Page 20: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/20.jpg)
Data Overview
ORT structures treated as sign supports
![Page 21: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/21.jpg)
Data Overview• Drainage Structures• Pipes/Outfalls
![Page 22: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/22.jpg)
Data Overview
• Lighting• Type, Height,
Support• Power Supply
![Page 23: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/23.jpg)
Data Overview
![Page 24: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/24.jpg)
Data Overview
• ITS/ ORT Devices• Detailed attributes• Supporting Poles• Support/Cabinet ID
![Page 25: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/25.jpg)
Data Overview
• MDX 5-Yr Plan
• ITS/ORT• Detailed
data• Physical• Financial• Detectives• As-builts, survey
![Page 26: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/26.jpg)
Data Overview
![Page 27: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/27.jpg)
Phase I Overview• 1,683 asset locations & info added• 4,668 total baseline assets• 342 assets removed
![Page 28: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/28.jpg)
Phase II Overview
• Concurrent project work • Post project scan
PROJECT COORDINATION
COLLABORATION
DATA MANAGEMENT
DATA EXPANSION
PROJECT DELIVERABLE
S
• Team Coordination • Final review &
acceptance
![Page 29: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/29.jpg)
Phase II Overview
• Completion Date & Required MDX data• Capital Asset Financial Code• Asset Costs
“Soft” Cost Direct Construction CostIndirect Construction Cost
Asset Cost =
![Page 30: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/30.jpg)
Phase II Overview• Soft Cost• Design services• Direct Cost• Cost of the asset itself• Indirect Cost• Mobilization, clearing/grubbing, MOT, etc.
“Soft” Cost Direct Construction CostIndirect Construction Cost
Asset Cost =
![Page 31: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/31.jpg)
Phase II Overview
• Concurrent project work • Post project scan
• Team Coordination • Final review &
acceptance
PROJECT COORDINATION
COLLABORATION
DATA MANAGEMENT
DATA EXPANSION
PROJECT DELIVERABLE
S
![Page 32: Gilreath diving into the details apwa_presentation_final](https://reader036.vdocument.in/reader036/viewer/2022070603/58720a491a28ab176b8b71e1/html5/thumbnails/32.jpg)
John Gilreath GISPDRMP GIS [email protected]