Globe, Arizona District Snow Effort
Joel Miller , John Wakefield, Tim Fox
Mobile
Resource
Management
![Page 2: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/2.jpg)
GLOBE District
To construct, maintain and manage the state To construct, maintain and manage the state transportation system in the Globe District, to meet or transportation system in the Globe District, to meet or
exceed the expectations of our customers.exceed the expectations of our customers.
Snow MissionSnow Mission
Mission Statement:Mission Statement:
•Keep the roads open and safe during snow storms. Keep the roads open and safe during snow storms. •Clear the roads of snow efficiently and safely. Clear the roads of snow efficiently and safely. •Maximize use of limited resources for winter storm events.Maximize use of limited resources for winter storm events.
![Page 3: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/3.jpg)
Snowfall Distribution
State of Arizona
Globe District Snow Coverage
![Page 4: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/4.jpg)
Snow Removal Program - GlobeSnow Removal Program - Globe
7 Departments (ORGS)7 Departments (ORGS)
30 Plow Trucks30 Plow Trucks
65 Operators65 Operators
21 State Routes21 State Routes
2507 miles2507 miles
![Page 5: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/5.jpg)
PRIORITY ROUTES
![Page 6: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/6.jpg)
Maintenance Expenditures - Globe
Snow and Ice Control = 21 Percent!
![Page 7: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/7.jpg)
Challenges in Managing Snow OperationsChallenges in Managing Snow Operations
1. Legal – Showing when & where we plowed and 1. Legal – Showing when & where we plowed and applied chemical.applied chemical.
2. Public Relations – Showing the public in real time, 2. Public Relations – Showing the public in real time, when & where we’ve plowed and applied chemical. when & where we’ve plowed and applied chemical.
3. Reviewing our storm operation for improvements.3. Reviewing our storm operation for improvements.
4. Maximum efficiency with our limited resources.4. Maximum efficiency with our limited resources.
5. Storm scheduling issues – Crews, Plows, Routes, 5. Storm scheduling issues – Crews, Plows, Routes, and Materials.and Materials.
6. Operator safety – Many areas without radio 6. Operator safety – Many areas without radio coverage.coverage.
![Page 8: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/8.jpg)
SolutionMobile
ResourceManagement
![Page 9: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/9.jpg)
MRM DefinitionMobile – An “on-board”, near real-time solution
Resource – Trucks, People, Data
Management – Utilizing information collected above.
![Page 10: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/10.jpg)
Project will eventually deploy 30 MRM units with cellular based communication devices in plows across the Globe District in 2 phases.
Key Goal: Determine potential value added for equipping entire ADOT snowplow fleet w/ MRM units.
Duration 12 MonthATRC Funding $125,000
+Globe’s $60,000
Total Program $185,000
MRM for Snow Operations
![Page 11: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/11.jpg)
Consisted of FORCE America DATA Commander installations in 12 current trucks with existing SSC5100 controllers (COMPLETE)
Partnering with the Equipment Shop, installs and fabrication was performed internally producing $11,227 in labor cost savings.
Started 12-11-2007 ~ Finished 4-1-2008
Total Labor hrs = 538.5Total Cost $ 34,544Avg Labor+Parts per - $2601Avg Labor per unit - $2080Avg Parts Cost per Unit - $520
MRM for Snow Operations Phase 1
![Page 12: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/12.jpg)
Consist of FORCE America DATA Commander AND SSC5100 controller installations in 16 current trucks with existing Dickey-John and Raven controllers (31%)5 trucks complete -
MRM for Snow Operations Phase 2
Total Labor hrs = 453
Total Cost $ 29,352
![Page 13: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/13.jpg)
Typical Work Report from storm activity
![Page 14: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/14.jpg)
ReportCommand - ForceAmericaGranular Report showing material application
![Page 15: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/15.jpg)
ReportCommand - ForceAmericaRouteReport distance
traveled by route input on SSC5100
![Page 16: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/16.jpg)
Material Usage Material Usage ReportReport
Project Annual Cost SavingsProject Annual Cost Savings
$ 62,920.00$ 62,920.00
•Assumes Five month storm seasonAssumes Five month storm season
•Assumes operators 30 min paperwork effortAssumes operators 30 min paperwork effort
![Page 17: Globe, Arizona District Snow Effort](https://reader036.vdocument.in/reader036/viewer/2022062409/56815123550346895dbf407f/html5/thumbnails/17.jpg)