Download - Green Building Conference Jbm
![Page 1: Green Building Conference Jbm](https://reader033.vdocument.in/reader033/viewer/2022061220/54bb44ba4a7959c05b8b483a/html5/thumbnails/1.jpg)
© 2008 Bentley Systems, Incorporated
JB Monnier, PhDSr VP, Bentley Asia Pacific
Sustaining TALL Infrastructure
![Page 2: Green Building Conference Jbm](https://reader033.vdocument.in/reader033/viewer/2022061220/54bb44ba4a7959c05b8b483a/html5/thumbnails/2.jpg)
© 2008 Bentley Systems, Incorporated
San Francisco Federal Building
•600k sq ft•18 Stories•154k sq ft skin
GSA sought exceptional:•Architectural design•Building performance•Project delivery•Lifecycle cost benefits•Avoid negative impact in first cost
•600k sq ft•18 Stories•154k sq ft skin
GSA sought exceptional:•Architectural design•Building performance•Project delivery•Lifecycle cost benefits•Avoid negative impact in first cost
"The San Francisco Federal Building establishes a new benchmark for the intelligent use of natural resources in the United States."
-Pritzker
![Page 3: Green Building Conference Jbm](https://reader033.vdocument.in/reader033/viewer/2022061220/54bb44ba4a7959c05b8b483a/html5/thumbnails/3.jpg)
© 2008 Bentley Systems, Incorporated
BIM for design, analysis,documentation and fabrication
•Shared architectural & structural model•Passed to fabrication•Virtual shop drawings
![Page 4: Green Building Conference Jbm](https://reader033.vdocument.in/reader033/viewer/2022061220/54bb44ba4a7959c05b8b483a/html5/thumbnails/4.jpg)
© 2008 Bentley Systems, Incorporated
High Performance Building
• first tower in the United States to forgo air-conditioning in favor of natural ventilation
• design boasts energy performance at more than 50 percent below the GSA’s criteria
• influence the productivity and health of the working population through natural ventilation, operable windows, non- hierarchical space planning, and day-lit interiors
San Francisco Federal BuildingMorphosis Architects
![Page 5: Green Building Conference Jbm](https://reader033.vdocument.in/reader033/viewer/2022061220/54bb44ba4a7959c05b8b483a/html5/thumbnails/5.jpg)
© 2008 Bentley Systems, Incorporated
Building Performance
• Building Performance Simulation– Large number of simultaneous green strategies– More interactions w/ owner– Multi-discipline Integration– Faster Iterative analysis (what ifs)– Advanced “Front End” (early) design
• Take Building Information Modeling (BIM) to the next level
![Page 6: Green Building Conference Jbm](https://reader033.vdocument.in/reader033/viewer/2022061220/54bb44ba4a7959c05b8b483a/html5/thumbnails/6.jpg)
© 2008 Bentley Systems, Incorporated
![Page 7: Green Building Conference Jbm](https://reader033.vdocument.in/reader033/viewer/2022061220/54bb44ba4a7959c05b8b483a/html5/thumbnails/7.jpg)
© 2008 Bentley Systems, Incorporated
JB Monnier, PhDSr VP, Bentley Asia Pacific
Sustaining TALL Infrastructure