Green Product
Management system
User's Manual & FAQ
Fardon-Chen
1
Menu 1、E-mail notification
2、Login
3、GPM Home
4、Pending issues Page
5、Write Part’s MCD Page
5-1 Upload Certificate
5-2 Split parts Page
5-3 Upload Part’s MSDS (Materials Substance Data Sheet)
5-4 Upload & Write Test report information
5.5 Green Policy Standards and Testing Results
6、Submitted for review
Appendix I
How to setting for the drop-down menu cannot be displayed? (Only Chinese)
Appendix II
The pop-security settings. (Only Chinese)
Appendix III
How to setting IE8?
If this manual have any questions, or contact the e-mail ([email protected])
2
1、E-mail Notification
(1) Suppliers receive notify
(Sample e-mail)
(2)Please Check
1. Company name
2. ASKEY’s Vender Code for your company
3. Part No.
Q1: Part number is incorrect
Q2: The part has two P/N.
Q3: One year the part have no trading .
Q4: Different materials of the transaction or no specifications content.
Above questions, please send mail to [email protected]
3
2、Login
(1) Login through B2B platform
https://b2b.askey.com.tw/
Q1: Web locations select Taiwan or China
A1: Please selects Taiwan
Q2: Forgot your password or a personnel transaction
A2: please send mail to [email protected] and inform personnel transaction
Q3: Unable to open the B2B website
Please try using Firefoxhttp://moztw.org/
Or IE 9.0 http://www.microsoft.com/en-us/download/details.aspx?id=13950
And your company MIS officers to help install
4
(2) Click GPM into the B2B platform
Q1: The pull-down menu can not be displayed
A1: Refer to Annex(Appendix I)
下拉式選單無法顯示設定.docx
Q2: "Drop-down menu to" tap did not respond
A2: Reload the page;
If it cannot be displayed, your company’s MIS to help adjust your browser settings.
(3)Download user’s manual
Q1: Attachments cannot be opened
A1:請下在免費 Adobe reader
http://get.adobe.com/tw/reader/
Q2: Click “GPM”, the windows does not have any reaction & nor open a new window.
A2: Please change your browser settings to accept this website's popup window or refer to
the attached.( Appendix II)
接受彈跳視窗 修改安全性設定.docx
5
3、Into the GPM Home
(1)Home
(2) Configuration instructions
② The left arrow, Press can reduce the window
(3) System home page ③ Bulletin
In this download operation manual Askey environmental banned substances Management
Specification, HSF and halogen-free certificates (letter of guarantee).
1
.
2
.
3
.
4
.
6
Into direct point into the materials and parts to fill the screen.
Q1: B2B page goes blank pages after enter the GPM system.
A1: This is a normal situation, blank page close.
Q2: To "0" awaiting reply you still need jobs?
A2: Do not.
Q3: To "0" awaiting reply, but the notification letter notice there is item numbers?
A3: The notification letter screenshots screen, Please send to mail
4,Awaiting Reply Page
(1) Selection “awaiting reply”, enter the parts to fill the page.
Please check
/1/Part No.
/2/Spec of the part (or Directions)
/3/Vender code of your company
/4/Vender name of your company
Q1: Above who can notice any errors?
1. 2. 3. 4.
7
A1: please send mail to [email protected]
(2) Search page
(3) At “1.” Check, Push “2.” Modify; into MCD page.
5、MCD Page
Main Page
1.
2.
8
(1) Fill in the weight of the material
Q1: If the parts dismantling inconsistent weight of the total weight of the material
A2: Please coudao same weight.
5.1Upload the certificate
(1)Modify or upload the “ASKEY Certificate of the Non-Use Hazardous Substances”
(2)Selection” Pencil logo”
The “Tick” –have confirmed that
The “Crossed”-Delete file
9
(3)Selection into Document Center
(4)Upload the new certificate
(5)Selection “New”
(6) Select guaranteed - the title of the document / declared scope
10
Please selection
/1/ HSF product
No2 亞旭環保管理不使用證明書/ASKEY 亞旭環保禁用物質管理規範
/2/ HF Product
No4 亞旭環保管理不使用證明書(無鹵)/ASKEY 亞旭環保禁用物質管理規範(無鹵)
Q1: What is the HSF Products
A1: Askey the general hazardous substances management products
(7) Select the certificate declared range.
1. Only Series or Only Part.
2. All Products.
Q1: Askey did not accept the series survey?
A1:No,But the same certificate by reference.
(8) The origin of the file
/1/Original Maker-Your company for agents.
/2/Supplier-Own production
/3/Central Site-The Askey internal option
(9)Upload File
Use ”Select”. Open the file selection window;select the file,Pick ”Upload”.
11
(10) Upload is complete, please remember to select "Close After Saved"
Can click on the attached file to review the upload file.
(11) Letter of guarantee uploaded successfully; return to the window of the selected letter
of guarantee.
Please tick in grid, and Click “Select”
(13)Final of certificate upload.
12
5.2 Parts dismantling (Raw material information)
Main menu
(1)Click the “new” button
(2)Into the “Raw material information “ page
Main page
13
/1/Fill in the “Raw Material Name”
/2/Selection the exemptions
/3/Selection the “Material Category”
Fill in the “Raw Material Weight”
Q1: If I cannot find the material types?
A2: Contact to [email protected] up data.
Q2: If it is complex or unable to distinguish between material
A2:please selection the “Mixed(混測類)” type.
14
5.3 MSDS (Materials Substance Data sheet)
(1)Composition Data-MSDS
Selection “Mgt.” upload the MSDS file.
(2) The same as the letter of guarantee upload screen; click “New”
The new “MSDS” file page
15
(3) Fill in the “Material Spec.” &”Original Marker”.
(4)Upload the MSDS File, 1.click “select” & selection file .2.click “upload”
(5)Fill in Composition Details
Click “New”,Screen change
(6)Enter the keywords(Ex: CAS No.)
16
You can contact to [email protected], add the substance.
(8)Fill in the “Percent by Weight”
Fill out remember to tick
(9) If there are other substances click "New".
-Modify data Delete data
(10) If you want to close the window, remember to save
17
5.4 Test report
Test information-ICP test report
(1)Click ”Mgt.”, add test report.
(2)Upload new file,please click ”New”.
18
(3) New ICP test report screen
(4) Please fill out the report number / test date / test units / Sample Name / upload files
19
(5)Click ”New”
(6) To fill test site information
Click “New” to new substance
20
(7)Select the "substance" / test method / test "unit" / detection limit / test results
Search & select substance
Material types keyword to search,If not find please notify to [email protected]
Select Unit & test methods
21
(11) Fill in the detection limit
(12)Selection test results
(13)Selection “Yes”, please full in value.
(14) Filling out remember to tick store
5.5 Green Policy Standards and Testing Results
(1) Confirm monitor whether the substance use
22
If not used (Intentionally added or production process), Please selection “N/C”
(2) The fill in test report is completed remember to " Close After Save"
6、Submitted
Back to the the MCD form that will click "Submit"
Click to trial will be delivered with the parts engineers review the information,
and you to wait for the results.
If submitted for review to the error message on behalf of missing or substance wrong
choice to fill.
23
Appendix I Microsoft Internet Explorer Seting
(1)從控制台進入 “網際網路” 選項中
點選安全性
點選自訂等級中找到
24
Astive scripting 與 Java applets 均選取”啟用”狀態
以及勾選相容性檢查
Mozilla Firefox 設定
於上方控制列 “工具”點選
25
“選項”
勾取 “啟用 JavaScript”
26
Appendix II
在 IE 瀏覽器中 “工具”
點選”網際網路選項”
27
選擇 “ 安全性” 中選擇 “信任的網站”
將 ASKEY 的 B2B 網站登入進去後 按”新增”
並重開 IE 瀏覽器即可
28
Appendix III
29
30
31
32
33