![Page 1: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/1.jpg)
Green Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in
Nigeria
Ifeanyi B. Orajaka [email protected] www.gve-group.com
Nigerian Investment Promotion Commission, Abuja, October 2013.
An Initiative of GVE Projects Limited RC1071222
![Page 2: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/2.jpg)
Company History
• 2009- Project Idea Conceived.
• 2009- Project Wins Institute of Electrical Electronics Engineers Award
• August 2010- Green Village Electricity Enterprises Formed.
• December 2011- Project Wins UNDP/ BOI Award.
• May 2012: Partners with IEEE Power & Energy Society in Johannesburg, South Africa.
• October 2012- GVE Projects Ltd. Incorporated.
• July 2012 – June 2013- Pilot Project Implemented.
• January 2013, GVE Projects Exhibits at the World Future Energy Summit, Abu Dhabi, U.A.E.
• June 2013 – Deloitte Commenced Business Dev. Services for GVE Projects Ltd.
![Page 3: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/3.jpg)
Engr. Prof. Gloria Chukwudebe Chairman
Ifeanyi B. Orajaka (MNSE, MNIM)
Managing Director
Chuka P. Eze (MNSE) E.D. Project Development
Ikechukwu O. Onyekwelu (MNSE)
E.D. Corporate Strategy
Engr. Godwin C. Orajaka Non-Executive Director, Tech. Advisory
JCI Sen. Kalada Apiafi
Non-Executive Director, Business Dev. Advisory
Pioneer Board of Directors
Ifeanyi B. Orajaka (400,000 shares)
Chuka P. Eze (300,000 shares)
Ikechukwu O. Onyekwelu (300,000 Shares)
Pioneer Shareholders
![Page 4: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/4.jpg)
![Page 5: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/5.jpg)
Our Model is a micro-scaled renewable
energy system to efficiently meet the
energy needs of remote settlements at
the most economic cost to suite their
income levels while generating marginal
profits
• 25KWatts of off-grid micro solar/wind to
power Remote Settlements.
• Units of 1.5kWatts of SunBlazer Battery
franchise unit to provide electricity to off-grid
community.
Project Model
![Page 6: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/6.jpg)
Relative Availability
Grid Expansion Complexities
Long life span
Flexible maintenance plan.
Environmentally friendly.
Decline in cost with improved R&D.
Improved Efficiency and Reliability
Easy Installation and Expansion
Why Renewable Energy For Nigeria?
![Page 7: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/7.jpg)
Operations
Products & Process of Production (See Clip)
Total Investment to date
Local Content Inputs Employment Generation/ Wealth Creation
• Pre-Operational Expenses: $15,000.00
• Plant/ Equipment: $62,336.00
• Operations:$13,852.00
• Total Investment: $91,188.00
• Equipment
• Design
• Staff
• Management
• 5 Permanent Staff Till Date
• 15 Adhoc Staff During Implementation
• 25 Indirect Jobs Created in Value Chain
• $6,000.00 Wealth Created in Project Community
![Page 8: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/8.jpg)
Our Niche
Opportunity/ Innovation
Market Penetration Strategy (see mkt survey)
Our competitive Edge
Market Expansion Strategy
Market Analysis
![Page 9: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/9.jpg)
Pre-Pilot Project: Goal: • Providing affordable 6kW micro-grid PV Solar/ Battery franchise energy rental services
to 100 houses in off-grid Egbeke community in Rivers State, Nigeria • Field testing the technical/ commercial feasibility of the project model Status: • Implementation Completed, Review currently on-going • Timeline: July 2012 – June 2013 (June – Aug. 2012= Stakeholders Engagement; Sept
2013 – Oct 2012= Market Survey & analysis; Nov 2012: Final Project Design; Dec 2012 Equipment Procurement; Jan – Feb 2013= Equipment Installation/ commissioning; Mar – May 2013 Field Testing/ Evaluation)
• Budget: $91,188.00 • Financing Structure: 100% financed (Grants by IEEE= $61,188; UNDP/ BOI= $30,000)
GVE Project Milestones
![Page 10: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/10.jpg)
Phase (II) Project: January 2014 – January 2015
• Goal: • To Provide several affordable 25kW micro-grid PV Solar/ Battery
franchise energy rental services to 24 remote/ off-grid communities in Rivers State, Nigeria
• To field test the scalability, replicability/ commercial feasibility of the project model
GVE Project Milestones Cont’d
Phase III: June 2015 – May 2019 Goal: • To Provide several affordable micro-grid PV Solar/ Battery franchise
energy rental services to 500 remote/ off-grid communities in Rivers State, Nigeria
• To build a self sustaining social enterprise, create over 1000 jobs, improve the living standards of over 10million people while creating about $120Million in wealth.
![Page 11: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/11.jpg)
GVE PROJECTS LTD.: • Project idea Conception • Project Analysis/ Design • Project Implementation/ Operations • Managing of Investors/ Stakeholders’ Interests
INSTITUTE OF ELECT. ELECTRONICS ENGINEERS-PES_CSI: Long Term Technical/ Professional Support Seed Funding (Grants/ products Support) $261,118 for Pilot Projects
RIVERS STATE SUSTAINABLE DEVELOPMENT AGENCY: • Provision of enabling environment for project to thrive • Facilitating community entry access • Provision of logistics support for project co-ordination
UNDP/BANK Of INDUSTRY, NIGERIA: Provision of 1st grant sum Provision of support for Feasibility Study/ Biz Plan Development Enhancing Access to Project Financing Facility from Dev. Banks Monitoring and Evaluation
DELOITTE, NIGERIA: Provision Business Development Services Business Plan Development Project Commercialization Feasibility Analysis
INDUSTRIAL & GENERAL INSURANCE PLC: Provision of Personnel & Equipment Insurance Services
SIRONA HAITI: Provision of advisory Services for Project Operations.
GVE Project Stakeholders
![Page 12: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/12.jpg)
Financials
![Page 13: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/13.jpg)
Financials Cont’d
![Page 14: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/14.jpg)
Financials Cont’d
![Page 15: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/15.jpg)
Financials Cont’d
![Page 16: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/16.jpg)
Financials Cont’d
![Page 17: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/17.jpg)
![Page 18: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/18.jpg)
Green Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in
Nigeria Discussion & Questions?
Ifeanyi B. Orajaka [email protected] www. gve-group.com
twitter: @greenvillageelect facebook: Green Village Electricity Enterprises
![Page 19: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/19.jpg)
![Page 20: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/20.jpg)
![Page 21: Green Village Electricity Project; · PDF fileGreen Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria . Ifeanyi B. Orajaka . info@gve-group.com](https://reader033.vdocument.in/reader033/viewer/2022052515/5aa0f6927f8b9a71178ef474/html5/thumbnails/21.jpg)