Download - Gustaf Werner Cyclotron, k=192
Vacuum systems and vacuum development at The
Svedberg laboratory
Lars WesterbergThe Svedberg Laboratory,
Uppsala University, Box 533, 751 21 Uppsala, Sweden
Gustaf Werner Cyclotron, k=192
Cryo coolers
Experimental facilitiesNeutron beam facility
6x108 neutrons/s 20 – 180 MeVDevelopment of neutron dosimetry/monitoring devicesSingle Event Effect studiesNuclear data/Transmutation
Ion-beam therapy
Materials science irradiations
The CELSIUS Ring
CHICSidetector
Electron cooler
CELSIUS-VASA detector
400 mbar Cold head Liquid jet nozzle
Droplet chamber Vacuum injection
Skimmer
H2 He
20 mbar
Ion beam
1·10-3
T=14.1 K
1·10-6
Pellet target
Closing down CELSIUS 30 June 2005WASA-> COSY CHICSi -> GSI, EXL exp.Pellet target->PANDA Cluster jet target->GSIDev. for FAIR, HESR e-cooler, ion-ind desorption, XFEL
Upcoming events
Workshop on outgassing OPM-2 June 17, 2005 in Uppsala Sweden. www.akademikonferens.uu.se/ISOHIM
13th Int Conf on Thin Films, 8th Int Conf on Atomically Controlled Surfaces ICTF-13/ACSIN8Stockholm, Sweden, June 19-23, 2005.www.congrex.com/acsin8
17th Int Vacuum Congress, IVC17/ICSS13Stockholm, Sweden, July 2-6 2007.www.congrex.com/IVC17icss13