Mic
higa
n D
epar
tmen
t of T
rans
port
atio
nM
acom
b Tr
ansp
orta
tion
Ser
vice
Cen
ter
2617
0 21
Mile
Roa
dC
hest
erfie
ld T
owns
hip,
MI 4
8051
Prepared by: MDOT Graphic Design & Mapping Unit \Office of Communications\brochures\M-59 Macomb (1/17 kh)
Construction and Motorist Information
March 2017 - October 2018
How Will We Keep Motorists Informed?For up-to-date information on this project, go to www.michigan.gov/drive or download the free Mi Drive app from iTunes and Google Play.
Additional project information can be found at www.MovingMacomb.org, www.facebook.com/MvgMacomb, and www.twitter.com/MovingMacomb.
M-59Hall Road
Reconstruction ProjectCities of Sterling Heights
and Utica, and Shelby, Macomb, and Clinton townships
MDOT: Providing the highest quality integrated transportation services for economic benefit
and improved quality of life.
For More InformationCall the MDOT construction office at
586-201-3867.
[email protected] www.MovingMacomb.org
Visit MDOT's Website at:
www.michigan.gov/mdot
Sta
mp
DELCO
BOULEVARD
SCHOENHERR RO
AD
HAYES ROAD
DALCO
MA D
RIVE
TILCH
ROAD
CANAL ROAD
Utica
Area of Construction
Lakeside Mall
59
53
HALL ROAD
HAYES ROAD
DALCO
MA D
RIVE
GARFIELD RO
AD
TILCH ROAD
59HALL ROAD
ROM
EO PLANK RO
AD
The Mall atPartridge Creek
PHASE 1 - 2017PHASE 2 - 2018
BRIDGEWORK
Macomb County Community College
1. Staybridge Suites2. Courtyard3. Holiday Inn Express and Suites4. Hyatt Place5. La Quinta Inn and Suites6. Comfort Inn7. Marriott Towne Place Suites
1.
2.
4.
3.
5.
6.
Henry FordMacombHospital
19 MILE ROAD
Lowe’s HomeImprovement
WalmartSupercenter
7.
MarriottTowne PlaceSuites
Windwood
East
broo
kD
rive
Driv
e
7.
MarriottTowne PlaceSuites
Windwood
East
broo
kD
rive
Driv
e
PHASE 2 - 2018
What is Being Done?The Michigan Department of Transportation (MDOT) will be reconstructing 3.7 miles of M-59 in the cities of Sterling Heights and Utica, and Shelby, Macomb, and Clinton townships. The project will be completed in two phases:
Phase 1• Concrete roadway will be replaced by asphalt• Install new modern signals• Improve drainage• Improve ramps and sidewalks to be compliant
with the Americans with Disabilities Act (ADA)• Replace signs• Fill sidewalk gaps• Add plants, trees and shrubs
Phase 2• Add a fourth lane on both sides of M-59
between Garfield and Romeo Plank roads• Same improvements as Phase 1
When Will This Be Done?Phase 1 is scheduled for March - October 2017.Phase 2 is scheduled for March - September 2018.
How Will Traffic Be Affected?Three lanes will be open in each direction through the reconstruction area 6 a.m. - 9 p.m. daily. Only two lanes will be open in each direction on M-59 over M-53 through mid-summer 2017. Work will occur day and night. Business and pedestrian access will be maintained throughout the project.
Long-term BenefitsThis project will extend the life of the roadway and allow for better traffic flow along Macomb County’s Golden Corridor.
GARFIELD RO
AD
ROM
EO PLANK
ROAD
DELCO
BOULEVARD
SCHOENHERR
ROAD
HAYES ROAD
DALCO
MA D
RIVE
HALL ROAD
PHASE 1 - 2017 Delco Boulevard to Dalcoma Drive
PHASE 2 - 2018 Dalcoma Drive to Romeo Plank RoadConstruction Starts March 2018
Completed September 2018
Construction Starts March 2017 Completed October 2017
59
Sterling Heights, Utica, Shelby Township,Macomb Township, and Clinton Township
MacombCounty
DELCO
BOULEVARD
SCHOENHERR RO
AD
HAYES ROAD
DALCO
MA D
RIVE
TILCH
ROAD
CANAL ROAD
Utica
Area of Construction
Lakeside Mall
59
53
HALL ROAD
HAYES ROAD
DALCO
MA D
RIVE
GARFIELD RO
AD
TILCH ROAD
59HALL ROAD
ROM
EO PLANK RO
AD
The Mall atPartridge Creek
PHASE 1 - 2017PHASE 2 - 2018
BRIDGEWORK
Macomb County Community College
1. Staybridge Suites2. Courtyard3. Holiday Inn Express and Suites4. Hyatt Place5. La Quinta Inn and Suites6. Comfort Inn7. Marriott Towne Place Suites
1.
2.
4.
3.
5.
6.
Henry FordMacombHospital
19 MILE ROAD
Lowe’s HomeImprovement
WalmartSupercenter
7.
MarriottTowne PlaceSuites
Windwood
East
broo
kD
rive
Driv
e
7.
MarriottTowne PlaceSuites
Windwood
East
broo
kD
rive
Driv
e
DELCO
BOULEVARD
SCHOENHERR RO
AD
HAYES ROAD
DALCO
MA D
RIVE
TILCH
ROAD
CANAL ROAD
Utica
Area of Construction
Lakeside Mall
59
53
HALL ROAD
HAYES ROAD
DALCO
MA D
RIVE
GARFIELD RO
AD
TILCH ROAD
59HALL ROAD
ROM
EO PLANK RO
AD
The Mall atPartridge Creek
PHASE 1 - 2017PHASE 2 - 2018
BRIDGEWORK
Macomb County Community College
1. Staybridge Suites2. Courtyard3. Holiday Inn Express and Suites4. Hyatt Place5. La Quinta Inn and Suites6. Comfort Inn7. Marriott Towne Place Suites
1.
2.
4.
3.
5.
6.
Henry FordMacombHospital
19 MILE ROAD
Lowe’s HomeImprovement
WalmartSupercenter
7.
MarriottTowne PlaceSuites
Windwood
East
broo
kD
rive
Driv
e
7.
MarriottTowne PlaceSuites
Windwood
East
broo
kD
rive
Driv
e
PHASE 1 - 2017