Transcript
Page 1: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Hardware design considerations: fan-in, fan-out, critical paths, hazards

(summary)

Page 2: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

For custom circuits (ASICS), have to pay attention to both physical and logical (“design”) faults

Physical faults can be caused by fabrication errors or by such factors as circuit aging, chip damage, or environmental stresses (temperature, vibration, power glitches, etc.)

Assuming adequate design rules are followed, logical faults are due to design errors

For FPGAs, fabrication errors do not need to be tested for.But design choices can lead to errors such as too long a critical path, for example.

In any project (hardware, software, or a mix) errors can be reduced by following a DFT (Design for Test) strategy, which emphasizes awareness of possible faults and the need to provide adequate testing to identify and remove faults

Page 3: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Main issues in performance of combinational logic:

The world is ANALOG, not digital; even in designing combinational logic, we need to take analog effects into account

Software doesn’t change but hardware does:--different manufacturers of the same component--different batches from the same manufacturer--environmental effects--aging--noise

main areas of concern:--signal levels (“0”, “1”—min, typical, and max values; fan-in, fan-out)--timing—rise & fall times; propagation delay; hazards and race conditions--physical (fabrication) faults: “stuck-at”, bridging--how to deal with effects of unwanted resistance, capacitance, induction

Page 4: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Race conditions and hazards (“glitches”)

Critical: state or output depends on order of arrival at decision point

Noncritical: output value does not depend on order of arrival of inputs

Hazard: (also called a decoding spike or a glitch): present if the circuit has the possibility of giving an incorrect output

2 types of hazards:Static: glitch may occur because of race between 2 or more input signals when output expected to remain at steady levelStatic-0: may produce erroneous 1; static-1: the opposite

Dynamic: output may erroneously change more than once as result of one single input transition

Page 5: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_14

Examples:

static-0 hazard:Extra delay through inverter

Static-1 hazard:

Adding buffers to match delays Will not work because ofParameter variations occurringIn real physical parts

Page 6: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_15

Additional examples for analysis:

Page 7: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_16_01

Page 8: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_16_02

Page 9: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_17

Example: dynamic hazard

One slow path and one fast path; other devices are assumed to have typical delays, all of the same value

If B 0 1 there will be 3 state changes in the output before it settles

Page 10: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_18

Page 11: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

“LEGACY OF THE EARLY PHYSICISTS”: RESISTANCE, CAPACITANCE, COUPLING (“micro view”, passive components)

Ampere: current flowing in a wire produces magnetic field

Faraday, Lenz: wire moving in magnetic field has induced current

Gauss et al.: capacitance

Situations to examine:Coupling between two adjacent wiresMutual capacitance between adjacent circuits…etc.

Page 12: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_19

PHYSICAL PROPERTIES: RESISTANCE R

R = (L / A)

Q: what does this say about:--length of wires?--feature sizes?--noise margins for low voltage?

fig_02_20

Modeling resistance (first-order model, includes inherent parasitic devices): for DC, L and C can be ignored; but in our circuits we will have time-varying signals

We are assuming a lumped system (all resistance considered to be “lumped” at one node)

For a distributed system we would look at

R(x)dx, L(x)dx, C(x)dx

Page 13: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_22

Capacitance: C = A/d

Many instances of capacitors on chip:

--Power/ground planes--parallel wires--adjacent pins--etc.

Example: part of signal in top wire shows up as noise in adjacent wire:

As circuit feature sizes get smaller and smaller, these effects become more and more important

fig_02_23

Page 14: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_24

First-order (lumped) model:

For small feature sizes, may need to look at much more complex distributed model

fig_02_25

Page 15: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_26

How do these effects change logic circuit?

Example: 2 inverters in series

Resistor: connecting path

Capacitor: device, wire, IC package, coupling to other devices

VOUT (s) = [1/Cs] / [R + 1/Cs] * V(s)IN

= [1/(RCs+1)] * V(s)IN

= [1/(RCs+1)] * [VIN/s]

for VIN a step function

VOUT(t) = VIN(1-exp(-t/RC))

Rise (and fall) times are slowedComponents can be damaged orData rate can be reduced

fig_02_27: interconnect

fig_02_28:interconnect, driver

fig_02_29: rise time

Page 16: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_33

Example: why you should never leaveGate inputs floating (using a 3-inputAND gate for a 2-input application):

3 methods:

1

2

3

fig_02_34

1:

VOUT(s) = C1/(C1+C2)*VIN(s);

If voltage too low, output is always 0

2.Cap = C1 + C2

This doubles time constant, reduces rise/fall time; can give metastable behavior on switching

3. State of unused pin defined by pullup resistor, this will work

fig_02_35

Page 17: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_36

Second-order: add parallel inductor

This adds a damping factor:

Natural frequency wn = 1/ (LC)1/2 ; damping d = (R/2) * (L/C)1/2

d < 1: underdamped—can have oscillation, noise;

d = 1: damped okay;

d > 1: overdamped—can have metastability

fig_02_37

Page 18: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Structural faults:

Stuck-at model: (a single fault model)

s-a-1; s-a-0; may be because circuit is open or there is a short

Page 19: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_44

Bridging fault: bad connections, broken flakes, errant wire pieces

Page 20: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_45

Examples of bridging faults

Page 21: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_46

Bridging faults can be feedback or non-feedback faults

Non-feedback faults

Between input or output and power rail: use stuck-at model

Between signal traces or logic pins:

inputs: model as common signal to both inputs

internal: who wins?

Page 22: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_47

Modeling a “competitive” fault: result of fault depends on logic family being used

Page 23: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_48

Feedback bridging faults:

Number of inversions is important

Circuit A Circuit B

In A there are an odd number of inversions on the path; this can cause oscillation; can sometimes be modeled as competing signals

In B there are an even number of inversions; this can often be modeled as a stuck-at fault

Page 24: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_02_49 fig_02_50

Functional faults:

Example: hazards, race conditions

Two possible methods:

A: consider devices to be delay-free, add spike generator

B: add delay elements on paths

Method A Method B

As frequencies increase, eliminating hazards through good design is even more important

Page 25: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Finite State Machines

and

Sequential Logic

(Memory faults: we will not discuss these here)

Page 26: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_08

Finite state machine (FSM):High-level view

Moore machine: output is a function of the present state only

Mealy machine: output is a function of the present stare and the inputs

Page 27: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_23,3_24

“Dividers”: slow clock down, e.g.

Simple divide-by-2 example

Page 28: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_25, 03_26, 03_27

Example:

Asynchronous divide-by-4 counter

[asynchronous 2-bit binary upcounter; ripple counter]

Note: asynchronous because flip-flops are changed by different signals

Note: if 1st stage output appears at time t0 + m, nth stage output appears at time t0 + nm; so this configuration is good for dividing the signal but using it as a ripple counter is prone to static and dynamic hazards Both outputs change:

Page 29: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_28, 03_29

Synchronous dividers and counters (preferred):

Example: 2-bit binary upcounter

Inputs:

DA = not A

DB = A xor B

Page 30: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_30, 03_31, 03_32, 03_33

Johnson counter (2-bit): shift register + feedback input; often used in embedded applications; states for a Gray code; thus states can be decoded using combinational logic; there will not be any race conditions or hazards

Page 31: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_343-stage Johnson counter:

--Output is Gray sequence—no decoding spikes

--not all 23 (2n) states are legal—period is 2n (here 2*3=6)

--unused states are illegal; must prevent circuit from ever going into these states

Page 32: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Making actual working circuits:

Must consider--timing in latches and flip-flops--clock distribution--how to test sequential circuits (with n flip-

flops, there are potentially 2n states, a large number; access to individual flipflops for testing must also be carefully planned)

Page 33: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_36, 03_37

Timing in latches and flip-flops:

Setup time: how long must inputs be present and stable before gate or clock changes state?

Hold time: how long must input remain stable after the gate or clock has changed state?

Metastable oscillations can occur if timing is not correctSetup and hold times for a

gated latch enabled by a logical 1 on the gate

Page 34: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_38

Example: positive edge triggered FF; 50% point of each signal

Page 35: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_39, 03-40

Propagation delay: minimum, typical, maximum values--with respect to causative edge of clock:

Latch: must also specify delay when gate is enabled:

Page 36: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_41, 03_42

Timing margins: example: increasing frequency for 2-stage Johnson counter –output from either FF is 00110011….

assume tPDLH = 5-16ns

tPDLH =7-18ns

tsu = 16ns

Page 37: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Case 1: L to H transition of QA

Clock period = tPDLH + tsu + slack0 tPDLH + tsu

If tPDLH is max,

Frequency Fmax = 1/ [5 + 16)* 10-9]sec = 48MHz

If it is min, Fmax = 31.3 MHz

Case 2: H to L transition:

Similar calculations give Fmax = 43.5 MHz or 29.4 MHz

Conclusion: Fmax cannot be larger than 29.4 MHz to get correct behavior

Page 38: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

Clocks and clock distribution:

--frequency and frequency range

--rise times and fall times

--stability

--precision

Page 39: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_43

Clocks and clock distribution:

Lower frequency than input; can use divider circuit above

Higher frequncy: can use phase locked loop:

Page 40: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_44

Selecting portion of clock: rate multiplier

Page 41: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_46

Note: delays can accumulate

Page 42: Hardware design considerations: fan-in, fan-out, critical paths, hazards (summary)

fig_03_47

Clock design and distribution:

Need precision

Need to decide on number of phases

Distribution: need to be careful about delays

Example: H-tree / buffers


Top Related