US Army Corps of EngineersBUILDING STRONG®
HEC-RAS New Features, Recent Developments, and Future WorkGary Brunner, P.E., D. WRE, M.ASCE
1
![Page 2: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/2.jpg)
BUILDING STRONG®
New Features in HEC-RAS 5.0.4 Improved Terrain Development/Modification Tools HEC-RAS Mapper Model Development/Editing Tools
1D/2D model development/editing; 2D mesh editing/refinement tools
Improved hydraulic structure modeling algorithms for structures placed inside of a 2D flow area
Internal Boundary Condition Lines Variable Time Step Computations Improved Parallelization/Faster Computations for 2D Models New document: “Making your HEC-RAS model run faster” Verification and Validation Testing/Document 64-bit versions of RAS Mapper and 2D Pre-processor Improved Manning’s n layer development
2
![Page 3: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/3.jpg)
BUILDING STRONG®
Terrain Modification Tools for Alternative Analyses
Improved capabilities for making huge terrain models Oroville Dam Issues– over 50G of data with
over 3700 LIDAR files, USGS 10m DEM’s, and channel cross section data from existing studies.
Improved channel modification/cutting tools Used in Oroville project
3
![Page 4: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/4.jpg)
BUILDING STRONG®
Oroville Dam Spillway Issues
4
![Page 5: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/5.jpg)
BUILDING STRONG®
HEC-RAS Mapper Model Development/Editing Tools
Create and edit 1D and 2D model elements Easy to use tools Data extraction 2D mesh development
► New Breakline tools► Mesh Refinement Regions tool
5
![Page 6: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/6.jpg)
BUILDING STRONG®
RAS Mapper – Create/Edit Geometry
6
![Page 7: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/7.jpg)
BUILDING STRONG®
Editing Toolbar
Add New Feature
Select/Edit Feature
Undo/Redo
Plot Elevations7
![Page 8: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/8.jpg)
BUILDING STRONG®
Model Construct Automatic calculation of hydraulic parameters
and data extraction during model development
8
![Page 9: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/9.jpg)
BUILDING STRONG®
Create/Edit Model Features Mouse hover indicates action
►Green point indicates: Creation, Move, Insert, Delete
9
![Page 10: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/10.jpg)
BUILDING STRONG®
Breaklines
Locate and Enforce Breaklines
10
![Page 11: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/11.jpg)
BUILDING STRONG®
Breaklines
11
![Page 12: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/12.jpg)
BUILDING STRONG®
Mesh Generation Refinement Tool
12
![Page 13: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/13.jpg)
BUILDING STRONG®
Mesh Generation Refinement Tool
13
![Page 14: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/14.jpg)
BUILDING STRONG®
Improved Hydraulic Structure Modeling
14
![Page 15: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/15.jpg)
BUILDING STRONG®
Improved Hydraulic Structures Spatial Connections
15
![Page 16: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/16.jpg)
BUILDING STRONG®
Internal Boundary Condition Lines for 2D Areas
16
![Page 17: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/17.jpg)
BUILDING STRONG®
Internal Boundary Condition Lines for 2D Areas
17
![Page 18: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/18.jpg)
BUILDING STRONG®
Variable Time Step Capabilities
18
![Page 19: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/19.jpg)
BUILDING STRONG®
Improved Parallelization/Faster Computations for 2D Modeling
The HEC-RAS computational engine has been further parallelized.
In previous versions the 2D matrix solver was parallelized, but everything else was not.
We have further parallelized the code to include matrix setup, matrix coefficient computations, hydraulic computations between time steps, etc…
This has dramatically sped up the code and will result in reduced run times for all 2D data sets.
19
![Page 20: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/20.jpg)
BUILDING STRONG®
Improved Parallelization/Faster Computations
20
2D Test Name 5.0.3 Compute time 5.0.4 Compute time Speed Ratio
Old/NewEU Test No 2 10,000 cells 1min 6s 31s 2.1
EU Test No 4 80,000 cells 1 min 27s 56s 1.6
EU Test No 4 20,000 cells 27s 13s 2.1
EU Test No 5 7,460 cells 1min 40s 48s 2.1
EU Test No 5 1,809 cells 24s 13s 1.8
EU Test No 6 36,492 cells 2 min 41s 1 min 18s 2.1
EU Test No 7 16,590 cells 38 min 46s 15 min 35s 2.5
EU Test No 7 4,195 cells 15 min 47s 3 min 48s 4.2
Muncie 25ft Grids 21,724 cells 19 min 10s 8 min 52s 2.2
Cherry Cr Dambrk 55,931 cells 43 min 15s 14 min 35s 3.0
Yolo Bypass 17,141 cells 17 min 13s 9 min 15s 1.9
Boise River 10,423 cells 28 min 2s 10 min 46s 2.6
Oroville Dam Brk 133,368 cells 5 hr 46 min 29s 1 hr 51 min 36s 3.1
Bald Eagle Detailed 87,022 cells 3 hr 36 min 9s 1 hr 29 min 55s 2.4
2D Bridge Wrkshp 62,670 cells 9 min 50s 4 min 0s 2.5
Orleans Ave Canal 41,766 cells 26min 45s 12 min 28s 2.1
Miss/Ohio 1D/2D 23,087 cells 23 min 01s 11 min 34s 2.0
![Page 21: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/21.jpg)
BUILDING STRONG®
New HEC-RAS Guidance Document
21
![Page 22: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/22.jpg)
BUILDING STRONG®
HEC-RAS Verification and Validation Tests/Document
HEC has performed a comprehensive Verification and Validation study for HEC-RAS This document covers: 1D Steady Flow 1D Unsteady Flow 2D Unsteady Flow
The following types of data sets were used for this research work: Analytical and Text book data sets Laboratory experiments Field data (real world flood events)
22
![Page 23: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/23.jpg)
BUILDING STRONG®
Current 2D Analyses Performed Analytical and Text Book data sets:
1. Chow – Steady Flow Backwater profiles2. Subcritical flow over a variable sloping bed3. Flow transitions over a Bump4. Flood Propagation over a Flat and Frictionless plane5. Dam Break on a Flat and Frictionless Bed6. Sloshing in a Rectangular Basin7. Long-wave Run-up on a Planar Slope8. Surface Runoff on a Plane
23
![Page 24: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/24.jpg)
BUILDING STRONG®
Current 2D Analyses Performed Laboratory Test Cases:
1. Flow in a Compound Channel2. Flow in a Rectangular channel with a Sudden Expansion3. Two-dimensional Surface Runoff 4. Partial Dam Break on a flat plane5. Rectangular channel with a 180 Degree Bend6. Sudden Dam Break in a sloping flume7. Converging Channel (Sub to supercritical flow)8. Dam Break in a channel with a 180 degree bend9. Flow around a Spur Dike10. Flow through a Bridge opening
24
![Page 25: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/25.jpg)
BUILDING STRONG®
Current 2D Analyses Performed Field Test Cases:
1. Malpasset Dam Break2. New Madrid Floodway, May 2011 Flood3. Hopefully more???
25
![Page 26: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/26.jpg)
BUILDING STRONG®
Recent Activities for HEC-RAS 5.1 Wind Forces (1D and 2D) Spatial Precipitation (gridded data and Gaged data) Spatial Infiltration (Initial and constant; SCS CN; Green and Ampt) 1D Finite Volume solution algorithm – Better stability, dry channels Iterative Matrix Solvers (Improved speed) Pump Stations inside of 2D Flow Areas DSS-7 Integrate Current 1D Bridge hydraulics inside of a 2D Flow Area 3D Graphics/Animations of Terrain with water depth or velocity Integration of Observed data locations/data in RAS Mapper Raster Calculator for RAS Mapper Terrain Modification tools using points; lines and polygons, as well as
predefined shapes: circles, rectangles, etc.. to modify the terrain data. Additional Turbulence Modeling options for 2D
26
![Page 27: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/27.jpg)
BUILDING STRONG®
1D Finite Volume Solution Algorithm
The current 1D Finite Difference scheme has trouble in the following situations: Can’t handle starting or going dry in a XS Low flow model stability issues with irregular XS data Extremely rapidly rising hydrographs can be challenging Mixed flow regime (i.e. flow transitions) Stream junctions do not transfer momentum directly
The new 1D Finite Volume algorithm has the following positive attributes: Can start with channels completely dry, or they can go dry during a simulation
(wetting/drying) Very stable for low flow modeling Can handle extremely rapidly rising hydrographs without going unstable Handles subcritical to supercritical flow, and hydraulic jumps better Junction analysis is performed as a single 2D cell when connecting 1D reaches (continuity
and momentum is conserved through the junction)
27
![Page 28: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/28.jpg)
BUILDING STRONG®
Partial CellsLeft floodplain, Main channel, Right floodplain
Separate cells for main channel, left floodplain and right floodplain.
Current Finite Difference uses onlytwo flow areas: channel & floodplain
Notation: Partial cells indexed by 𝑖 𝑢 channel or overbanks velocities at cross-section 𝑗 𝐴 channel or overbanks partial areas for cross-section 𝑗 𝐴 ∑ 𝐴 cross-section total area
Cross-section partial conveyance 𝐾 𝐴 𝑅 ⁄ / 𝑛 𝑘⁄
Cross-section total conveyance 𝐾 ∑ 𝐾
![Page 29: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/29.jpg)
BUILDING STRONG®
Junctions
29
![Page 30: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/30.jpg)
BUILDING STRONG®
Natural RiverMapping Animation - Dry to Wet to Dry
30
![Page 31: HEC-RAS New Features, Recent Developments, and Future Work · US Army Corps of Engineers BUILDING STRONG ® HEC-RAS New Features, Recent Developments, and Future Work Gary Brunner,](https://reader033.vdocument.in/reader033/viewer/2022041919/5e6b42f1b7127a06027f5286/html5/thumbnails/31.jpg)
BUILDING STRONG®
Future Research and Development Work 2D Bridge Hydraulics:
► True completely 2D Bridge Hydraulics (open channel flow, pressure flow, overtopping)
Additional Computational Speed Improvements Iterative Solvers; Code Profiling/improvements; Graphics Card Computations; MPI
parallelization;
Enhancements to Mesh Generation/Editing Tools Integrate 1D finite Volume solution with the 2D finite volume solution so
they can be solved in the same matrix (fully coupled) Improved Initial Conditions capabilities for 2D Flow Areas Integration of the HEC-RAS “Rules” within 2D Areas/Structures Vertically varying Manning’s roughness Cloud Computing for RAS standalone Turbulence Modeling: Modified subgrid; K-ε turbulence model, etc. Eulerian advection scheme (currently using Lagrangian advection) And everything else!!!