HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
1
FORMATION NIVEAU EXPERT ENMODELISATION DES COUTS DES
RESEAUX TELECOMSPOUR LES REGIONS HIPSSA
Dakar
27 au 31 Mai 2013
Abdelmounaim EL HAFFAF
Alain SAWADOGO
Experts UIT
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Sessions 17/18:Usage du modèle UIT comme base pour l’estimation des
coûts pour les pays membres de la région HIPSSA
2
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
3
Agenda
Décrire la
tâche
Expliquer ce
qui est deman
dé
Travailler en
groupes
Présenter et
discuter les
résultats
Objectifs de ces sessions
Session 17 Session 18
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Contexte de l’exercice
Les autres exercices étaient purement hypothétiques; Celui-ci est plus proche de la réalité.
L’objectif est d’essayer de manipuler le modèle UIT et de l’adapter au contexte de votre pays.
Pour cela, il vous faut: Former des groupes de travail relevant du même pays, ou Apprendre des leçons en faisant membre d’un groupe
relevant d’un pays différent du votre.
4
Notez bien qu’il s’agit uniquement d’un modèle de classe – Le modèle ne doit pas être utilisé pour des
propos commerciaux (voir“Notice”)
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Le modèle CMILT UIT pour le mobile Telco
5
Key CellsSummary Sheets Direct input into the modelInput Sheets Inputs copied from other worksheetsCalculation sheets Calculation cells
Output cells copied to other worksheets
9. LRIC2. Traffic
1.Coverage
8. Routing factors
11. LRIC+
10. Mark-ups
7. Network costing
6. Network design
3. Network design parameters
4. CAPEX and Direct OPEX
A. Model Design
B. Control Panel
C. Reference Lists
5. Indirect OPEX
D. Reconciliation
E. Graphs
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Approche pour l’édition du modèle
Changer seulement les cellules en jaune
S’il y a un doute, ne
changer rien
Sauvegardez des versions à chaque fois
que vous faites des
changements
6
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Les champs que vous pouvez changez- 1
B. Control Panel: sensitivity values in B2
C. Reference Lists: provinces, years, currency
1. Subscribers and coverage: Coverage in 1.01 Subscribers and market share in 1.02
2. Traffic: Traffic volumes of specific operator in 2.01 Average non-billed traffic factors (2.02) and split by geo-
type (2.06)
7
The red text highlights the areas that must be changed
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Les champs que vous pouvez changez- - 2 3. Network design parameters:
3.01 radio network parameters 3.02 BTS cell radii 3.04 -3.07 BTS parameters; Network design capacity;
Transmission parameters; Routing factors
4. Capex and Direct Opex: 4.01 network equipment capex and opex 4.02 and 4.03 transmission costs 4.04 Licence fees
5. Indirect opex 5.01 Telco actuals 5.04 Interconnection charges
8
The red text highlights the areas that must be changed
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Approche suggérée
1. Changer ce qui se rapporte au contexte de votre pays: Marquer les données changées (couleur différente) et
sauvegarder le modèle.
2. Chercher des données online (exemple: régions, population, nombre d’abonnés) Encore une fois, marquer les données changées (couleur
différente) et sauvegarder le modèle modèle.
3. Estimer au mieux les valeurs de données manquantes (exemple: couverture basée sur la supérficie du pays; changer la valeur du trafic par rapport au nombre d’abonnés) Encore une fois, marquer les données changées Utiliser une autre couleur pour les données qui doivent être
confirmées à postériori.
9
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Proposition d’outputs
Lorsque vous terminez une version satisfaisante du modèle, préparer une courte présentation pour le groupe
Inclure ce qui suit: Les changements apportés au modèle UIT Un draft des résultats – comparer les résultats en fonction
des coûts actuels des tarifs de terminaison mobile pour chaque opérateur de téléphonie mobile.
A quel point êtes-vous confiant par rapport aux résultats du modèle de coûts– tester la sensibilité de vos hypothèses.
Quelles sont les données que vous souhaitez vérifier avec les opérateurs.
10
HIPSSA Cost model training workshop:
Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region
Travail de groupe et présentations
11