Mobitel Stage4 Huawei BTS3900A Installation Guide V1.0
2008.9
HUAWEI TECHNOLOGIES CO., LTD. Page 2Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
2G BTS3900A(outdoor)
APM30 for power
and BBU
RF cabinet for 6 DRFU
Battery cabinet:
184Ah*2
The layout of the BTS3900A is as shown in the picture.The APM30 and RF cabinet should be near to the cable ladder.Two battery cabinet should stack.
HUAWEI TECHNOLOGIES CO., LTD. Page 3Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Outlook of BTS3900A
BTS3900A cabinet Stacked Battery cabinet
HUAWEI TECHNOLOGIES CO., LTD. Page 4Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
The plinth
The BTS should be installed on the steel rack or concrete plinth• For the steel rack, use the bolt and nut to fix the base frame of
cabinet.• For the concrete plinth, use the expansion blot to fix the base frame.
HUAWEI TECHNOLOGIES CO., LTD. Page 5Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install the base
• Fix the base to the plinth and check the levelness with level bar, if the level bar is not in the middle, use the adjusting pad to adjust the levelness
• 2 base need to be installed, one is for BTS3900A, one is for battery cabinet
HUAWEI TECHNOLOGIES CO., LTD. Page 6Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install the cabinet
• Push the cabinet so that the cabinet can be in full contact with the installation block
• Use two bolts to fix the cabinet to the base
HUAWEI TECHNOLOGIES CO., LTD. Page 7Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install the component
BBU
DRFU
Install the BBU, DRFU, PMU and PSU to the cabinet as shown in the picture.
The BBU should be close to the PDU panel, without space between PDU and BBU
Special handle is needed to remove the
DRFU
PSU
PMU
HUAWEI TECHNOLOGIES CO., LTD. Page 8Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Connect the DC cable for BBU and DRFU
• Connect the DC cable to the “Load5” of the PDU with OT terminal. Blue cable as – 48v, and black as 0 V. Connect the power terminal to the UPEU card on BBU.
• Connect the power cable to the corresponding DRFU, 6 cables to 6 DRFU. The other end is already connected.
Load5 Connector to
UPEU on BBU DC power cable for DRFU
HUAWEI TECHNOLOGIES CO., LTD. Page 9Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install the CPRI cable for DRFU
Connect the CPRI cable between the GTMU and DRFU, the 6 ports on GTMU should be connected to the corresponding DRFU. The port on DRFU should be port0
The CPRI cable route should be at left side of the cabinet, as show in the picture
GTMU
DRFU CPRI
cable
HUAWEI TECHNOLOGIES CO., LTD. Page 10Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install E1 cable
GTMU UELP MW
There are two E1 cable, one is between GTMU and UELP, the other is from UELP to MW
The cable between GTMU and UELP is already made.
GTMU
UELP
HUAWEI TECHNOLOGIES CO., LTD. Page 11Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
RF cable
• Usually, one cabinet has 6 jumpers, please refer to the picture for the jumper and RF cable connection.
• One end of the jumper is straight DIN connector, the other end (BTS side) is right angle DIN connector. The connectors need to be made on site.
• The configuration of the cell is as showing in the picture:S2, S2 PBT, S3, S4
Upper 6 jumper to be installed
Usually, the lower 6 jumper is not needed
• S2 • S2 PBT
• S3
• S4
HUAWEI TECHNOLOGIES CO., LTD. Page 12Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Stack two battery cabinet
Step1:Install the lower cabinet and remove the cover
Step2:Install the wiring cover to the lower cabinet
Step3:Seal the wiring cover with mud.
Step4:Install the upper cabinet on top of the lower cabinet, fasten the upper cabinet with 4 bolts.
cover
Step 2
Step 3
Step 4
Step 1
Wiring
cover
HUAWEI TECHNOLOGIES CO., LTD. Page 13Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install the battery
• K
Install the DC
cable to APM30
Install the DC
cable between
upper and lower battery
Use the black DC cable as – 48V, and red DC cable as 0V.
2 battery banks to be installed in each cabinet.
Attention! Switch off the battery breaker in battery cabinet and APM30 when installing the battery!
Battery breaker
Upper battery cabinet
Lower battery cabinet
Battery terminal
HUAWEI TECHNOLOGIES CO., LTD. Page 14Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install the grounding cable
• Install the PGND cable from APM30 to ECB
• Install another 2 pcs of equipotential cable from APM30 to upper battery cabinet and lower battery cabinet
ECB inside the cabinet
HUAWEI TECHNOLOGIES CO., LTD. Page 15Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Connect the AC input cable
• Install the 4 x 4mm^2 armored cable to the terminal of PDU, L1,L2,L3,N: brown, black, grey, blue. When 3 phase power is used, the short circuit bar should be removed; when single phase power is used, install the short circuit bar.
• AC power cable should be protected in the GI pipe , and the armor of the cable should be grounded with the hose clip
short circuit bar
PDU
HUAWEI TECHNOLOGIES CO., LTD. Page 16Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Lay the AC power cable• Dig a channel between meter cubicle and plinth.
• Lay the AC power cable with the protection of GI pipe. Flexible GI pipe should be used as
bend. The armor of the AC cable need to be grounded.
• Ground the GI pipe with M8 x 25mm bolt & nut, using 25mm^2 grounding cable
• Bury the pipe
Dig the channel and lay the AC cable
Make the bend with the Gi flex pipe
Ground the AC cable armor with the hose clip
HUAWEI TECHNOLOGIES CO., LTD. Page 17Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install the SPD for BTS
• Install the SPD box on the meter cubicle, the SPD should be grounded.
HUAWEI TECHNOLOGIES CO., LTD. Page 18Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Alarm Cable FMUA(COM)------BBU(MON0)
Connect the BBU(MON0) and FMUA(COM IN) with the cable(04070023)
BBU(MON0)
FMUA(COM IN)
HUAWEI TECHNOLOGIES CO., LTD. Page 19Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Alarm Cable DPMU(COM)------APMI(J1)
One end of the cable is already connected to J1 port of APMI, the other end need to be connected to “COM” port of DPMU
HUAWEI TECHNOLOGIES CO., LTD. Page 20Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Alarm Cable DPMU(RS422)------APMI(RS422)
One end of the cable is already connected to RS422 port of APMI, the other end need to be connected to “RS422” port of DPMU
HUAWEI TECHNOLOGIES CO., LTD. Page 21Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Alarm Cable BBU(MON1)------APMI(TX- TX+,RX- RX+)
One end of the cable(04080029) is to MON1 port of BBU, another end need to be cut and connect the wire to the panel of APMI (TX- TX+,RX- RX+), The connection is as shown in the table.
Wire Port on APMI
White One pair TX+
Orange TX-
Blue One pair RX+
White RX-
HUAWEI TECHNOLOGIES CO., LTD. Page 22Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Install battery sensor cable
One end of the battery sensor cable is already connected to the
APMI card BAT_TEM1 port, so connect the other end to one cell of
the battery.
HUAWEI TECHNOLOGIES CO., LTD. Page 23Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Connect the door sensor cable
• Connect the door sensors of the two battery cabinets and the APM30 as red line shown in the picture
• Connect the sensor cable to the socket of the prior door sensor, so the connection of the 3 door sensors are serial
Socket to connect the 2 sensor
HUAWEI TECHNOLOGIES CO., LTD. Page 24Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Antenna system installation
HUAWEI TECHNOLOGIES CO., LTD. Page 25Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Antenna system installation• Ground the feeder cable according to the standard in the picture• Antenna azimuth and down tilt should follow the design file strictly.• All the jumper connectors are waterproofed well.• The feeders are arranged neatly, the feeder and jumper labels are
attached neatly and oriented in the same direction.• Use feeder clamp to fix the feeder each meter.
HUAWEI TECHNOLOGIES CO., LTD. Page 26Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Installation check key point
• Check the grounding cable of cabinets, SPD, Gi pipe, AC power cable, feeder.
• Check the water proof of the feeder and antenna connector.• Check AC and DC power cable color code, complied with the standard.• The cable should be tied neatly. Keep redundancy when cutting the
cable tie.• Antenna height, azimuth and down tilt should follow the design file
strictly.• The signal cable and battery cable outside the cabinet should be
protected with PVC flexible pipe.• All the cables should be labeled with the label provided.• Bring back the rest of the materials and clean the sites after installation.
HUAWEI TECHNOLOGIES CO., LTD. Page 27Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Power on the cabinet
Step1:Switch off all the AC and DC breakerStep2:Power on the AC input breaker, check the indicator of the PMU and PSU, For PMU, if RUN is 1s on and 1s off, and ALARM is off, it mean the module is
working normally For PSU, if the is on, and is off, it means the module is working normally
AC inputBreaker
DC outputBreaker
Step3:Use the multimeter to measure the DC output voltage, the normal range should be -38.4V to -57V.
Step4:Switch on the DC output breaker for the related module, switch on the DC output breaker on the DCDU
HUAWEI TECHNOLOGIES CO., LTD. Page 28Huawei Confidential
Slide title :32-35pt Color: R153 G0 B0
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Slide text :20-22ptBullets level 2-5:
18pt Color:Black
Corporate Font :FrutigerNext LT Medium
Font to be used by customers and
partners : Arial
Commission the BTS
Connect the E1 cable to MW, check the indicator “LIU1” on the GTMU, if it’s always off, it means the E1 is normal.
After the BTS is on air, make some test call, check the cell broadcast service and GPRS service.
LIU1
The following alarm need to be checked on site:• Door alarm of all the 4 cabinets• Water sensor of the cabinet• Temperature and Humidity• Battery sensor • Mains failure and PSU failure
Thank youwww.huawei.com